Development of a prototype of experimental installations for the Coastal Engineering Laboratory (LIC) of the Polytechnic University of Bari
Realizzazione di un prototipo di installazioni sperimentali per il Laboratorio di Ingegneria Costiera (LIC) del Politecnico di Bari
Italy · Bari · how to bid here →
Your path to submission
- Deadline: 20 November at 12:00 — 39 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ITA.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew just one bid (445 procedures with a bid count); 96% ended with a single bidder. Sector: median 6 bids.n = 445
- 34% of this buyer's awards went to companies that had already won here before (778 awards since 2018, spread over 503 companies). That is well above the sector norm (11%) — newcomers have a harder time here than elsewhere.n = 778 awards since 2018
- Not one of the 778 awards with a known winner country has gone to a foreign company so far. Sector average: 22%.n = 778
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 11/10/2026.
Foreign bidders
In Italy · R&D services, 95 contracts went to foreign companies over the last 3 years (of 498 recorded awards) — mostly from Spain, Germany, France.
Submission language: ITA.
Typical field: median 6 (from 222 awards).
What the buyer is looking for
ealizzazione of a prototype of experimental installations for the Laboratory of Coastal Engineering (LIC) of the Polytechnic of Bari
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Italian.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PIXEL S.A.S. DI TRIGGIANI E PATERNUOSTO A. | 29 | 2024–2026 |
| C&C S.P.A. | 16 | 2024–2026 |
| SFERA INFORMATICA & STRUMENTAZIONE S.r.l. | 13 | 2024–2026 |
| DB ELECTRONIC INSTRUMENTS S.R.L. | 9 | 2024–2026 |
| COMPUTER E MULTIMEDIA DI DE PALMA ROCCO | 8 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.