How to bid in this country: portals, deadlines, thresholds →
Replacement of pump at Main Pumping Station together with modernization of discharge pipelines and modernization of electrical distribution board and SCADA system at the Wastewater Treatment Plant in Białystok
Wymiana pompy na Pompowni Głównej wraz z modernizacją rurociągów tłocznych oraz modernizacją rozdzielni elektrycznej i AKPiA, na terenie Oczyszczalni Ścieków w Białymstoku — original title
Your path to submission
- Deadline: 4 November at 11:00 — 3 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Polish.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The subject of the contract is: replacement of the pump at the Main Pumping Station along with modernization of piping and modernization of the electrical switchboard and AKPiA, at the Sewage Treatment Plant in Bialystok.
Contract
Type of service
Clement What the numbers say about this buyer
- 13% of this buyer's awards went to companies that had already won here before (64 awards since 2015, spread over 16 companies). That is well below the sector norm (28%) — this buyer switches suppliers more often than others.n = 64 awards since 2015
- 1% of the bids received came from other countries (15 procedures with a bid mix) — all bidders, not just the winners. Sector: 18%.n = 15
- The median procedure drew 2 bids (56 procedures with a bid count); 18% ended with a single bidder. Sector: median 3 bids.n = 56
- 8% of awards went to companies from abroad (64 awards with a known winner country). Sector average: 2%.n = 64
- Across 7 procedures with structured selection criteria, this buyer most often required: Minimum number of managers (3 of 7), References: works (3 of 7), Trade register enrolment (2 of 7), Staff qualifications (1 of 7).n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| AGROMIL Sp. z o.o. | 7 | 2025–2026 |
| BA 1 AB Sp. z o.o. | 2 | 2025 |
| Agromil Sp. z o.o. z siedzibą w Dziekanowie Nowym | 2 | 2025 |
| MDS Instal spółka z ograniczoną odpowiedzialnością | 1 | 2026 |
| Aarsleff | 1 | 2026 |
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 1,623 completed awards — not a statement about this procedure.)
This procedure allows 36 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Poland · Industrial machinery, 91 contracts went to foreign companies over the last 3 years (of 7,374 recorded awards) — mostly from Germany, France, Italy.
Submission language: Polish.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now