Obra para la ejecución del proyecto de adecuación del alumbrado general a luminarias LED del Hospital Universitari i Politécnic La Fe
Spain · Valencia · how to bid here →
Your path to submission
- Deadline: 21 October at 23:59 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SPA.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (19 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to FULTON S.A..n = 19
- The median procedure drew just one bid (789 procedures with a bid count); 68% ended with a single bidder. Sector: median 4 bids.n = 789
- 46% of this buyer's awards went to companies that had already won here before (1,108 awards since 2017, spread over 458 companies). 54% went to new names.n = 1,108 awards since 2017
- 44% of the bids received came from small and medium-sized enterprises (99 procedures with a bid mix). Sector: 67%.n = 99
- 2% of the bids received came from other countries (99 procedures with a bid mix) — all bidders, not just the winners. Sector: 10%.n = 99
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Spain · Construction work, 87 contracts went to foreign companies over the last 3 years (of 98,500 recorded awards) — mostly from Portugal, Italy, France.
Submission language: SPA.
Typical field: median 4 (from 15,043 awards).
What the buyer is looking for
it is intended to respond to the needs identified in the energy audit relating to the improvement of the energy efficiency of the lighting installations of the building. For this purpose, actions of replacement and adaptation of the existing lighting are contemplated, aimed at adapting the current installations to the current regulations, applying the solutions that allow to achieve the highest possible energy efficiency and the maximum reduction of the costs associated with the life cycle of the installations. The actions will be defined according to the specific use of each area of the building, with the aim of ensuring a rational and efficient use of the energy consumed, as well as contributing to the reduction of COz emissions to the atmosphere. The conclusion of this contract is necessary for the installation of LED luminaires for the adaptation of the general lighting of the Hospital Universitari i Politécnic La Fe, by replacing the current fluorescent luminaires.
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PHILIPS IBERICA, S.A.U | 26 | 2018–2026 |
| MATCLINIC SL · Bétera - Valencia | 23 | 2018–2026 |
| DEXTROMEDICA SL · Campanar, València | 23 | 2019–2026 |
| Karl Storz Endoscopia Ibérica SA | 19 | 2018–2025 |
| OLYMPUS IBERIA S.A.U. · L'Hospitalet de Llobregat | 19 | 2019–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.