Concession and Construction Contract - L. ALGARVE - ROTATING BRIDGES OF FARO, TAVIRA AND ALMARGEM - REPLACEMENT
Empreitada em regime de Conceção e Construção - L. ALGARVE - PONTES GIRANTE DE FARO, TAVIRA E ALMARGEM - SUBSTITUIÇÃO
Portugal · Almada · how to bid here →
Your path to submission
- Deadline: 10 November at 00:00 — 55 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POR.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 32% of the bids received came from small and medium-sized enterprises (45 procedures with a bid mix). Sector: 89%.n = 45
- 31% of this buyer's awards went to companies that had already won here before (565 awards since 2016, spread over 270 companies). 69% went to new names.n = 565 awards since 2016
- The median procedure drew 3 bids (46 procedures with a bid count); 20% ended with a single bidder. Sector: median 4 bids.n = 46
- The award came in at a median 91% of the estimated value (36 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 91%.n = 36
- 1% of awards went to companies from abroad (565 awards with a known winner country). Sector average: 2%.n = 565
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.
Foreign bidders
In Portugal · Construction work, 16 contracts went to foreign companies over the last 3 years (of 1,015 recorded awards).
Typical field: median 4 (from 8 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Empreitada em regime de Conceção e Construção - L. ALGARVE - PONTES GIRANTE DE FARO, TAVIRA E ALMARGEM - SUBSTITUIÇÃO
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POR.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Intevial | 22 | 2026 |
| HITACHI RAIL GTS PORTUGAL, S.A. | 13 | 2017–2026 |
| Construções J.J.R. & Filhos, SA | 12 | 2025–2026 |
| LeasePlan Portugal - Com. e Alug. de Autom. e Equip., Unip. Lda | 11 | 2025–2026 |
| Viatel - Tecnologia de Comunicações S.A. | 6 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.