Friedrich & ClementBETA

Infraestruturas de Portugal, SA

Portugal · 25 open tenders · 468 documented awards

Current tenders

Contract "LC+LAV S&T01-VARIOUS SECTIONS RFN, CONVENTIONAL AND HIGH SPEED-SIGNALLING, TELECOMMUNICATIONS AND ETCS-DESIGN-EXECUTION-MAINTENANCE
360.000.000 €Deadline 8 Oct ·
Contract - EN218 - BRIDGE OVER THE MAÇÃS RIVER AND ACCESS ROADS - EXECUTION
45.000.000 €Deadline 8 Oct ·
Acquisition of Nabla clamp and insulating plate
996.000 €Deadline 9 Oct ·
Construction Work - L. MINHO - REINFORCEMENT OF PONTE DO LIMA BRIDGE FOR BRAKING ACTIONS AND D4 LOAD CLASS
7.500.000 €Deadline 13 Oct ·
ENTERTAINED - NORTH LINE - ADEQUACY OF THE LAYOUT OF THE ENTRY STATION - IMPLEMENTATION
30.000.000 €Deadline 15 Oct ·
Preparation of Implementation Project - EN229 - VILAROUCO (KM0+000) AND PENEDONO (KM15+480) - REABILITATION
400.000 €Deadline 15 Oct ·
Purchase of road fuels and electric energy for mobility (2026-2028) - EEA
10.279.849 €Deadline 15 Oct ·
IPSP1: INSPECTION OF ROAD SIGNAGE SEMI-GANTRIES INCLUDING TESTS, STRUCTURAL EVALUATIONS AND DESIGN
485.000 €Deadline 16 Oct ·
Acquisition of polyvalent monoblock concrete trays
1.486.800 €Deadline 19 Oct ·
L. BEIRA ALTA - INFRASTRUCTURE INSPECTIONS IN GEOTECNIA
682.485 €Deadline 20 Oct ·
EMPREITADA - CAMPUS DO PRAGAL - INSTALAÇÃO DE PAINÉIS FOTOVOLTAICOS PARA AUTOCONSUMO DE ENERGIA ELÉTRICA
750.000 €Deadline 22 Oct ·
Contractor - L. ALENTEJO - NEW PINHAL STATION - RELOCATION OF THE TORRE COTTINELLI TELMO - DESIGN-EXECUTION
5.000.000 €Deadline 23 Oct ·
Purchase of goods and provision of restaurant and cafeteria services for buildings 1 and 2, as well as the provision of meals for the O Ninho III kindergarten, located at the IP headquarters in Almada
175.000 €Deadline 23 Oct ·
Acquisition of monoblock versatile trays for the Alentejo Line - Modernization of the Casa Branca - Beja section
9.504.600 €Deadline 26 Oct ·
Contract - ER18 - VILA VELHA DE RÓDÃO BRIDGE OVER TEJO RIVER (KM121+960) - REINFORCEMENT
12.000.000 €Deadline 29 Oct ·
Contract - N. LINE - ENTRONCAMENTO - PHOTOVOLTAIC SOLAR PARK AND SUBSTATION ADAPTATION - PHASE1 (UP TO 9MWP)
10.000.000 €Deadline 29 Oct ·
IT SUPPORT ACQUISITION FOR RAILWAY APPS - 2026
360.000 €Deadline 30 Oct ·
IT SUPPORT ACQUISITION FOR ROAD APPS - 2026
430.000 €Deadline 30 Oct ·
REHABILITATION OF THE VCC FLEET
6.300.000 €Deadline 2 Nov ·
WORKS CONTRACT - REPAIR AND MAINTENANCE OF TRAFFIC LIGHT EQUIPMENT 2026 - SOUTH REGION - 3 LOTS
660.000 €Deadline 2 Nov ·
Acquisition of building conservation and repair services and external storage spaces at CLE 2027-2029
745.000 €Deadline 3 Nov ·
Concession and Construction Contract - L. ALGARVE - ROTATING BRIDGES OF FARO, TAVIRA AND ALMARGEM - REPLACEMENT
15.000.000 €Deadline 10 Nov ·
Construction Work - EN218 - BRIDGE OVER THE MAÇÃS RIVER AND ACCESSES - EXECUTION
45.000.000 €Deadline 13 Nov ·

Purchasing rhythm

Awards per year — who knows the rhythm prepares before the notice appears.

20188
20191
20208
20215
20232
202565
2026770

Clement What the numbers say about this buyer

  • 29% of this buyer's awards went to companies that had already won here before (649 awards since 2016, spread over 279 companies). That is well below the national norm (62%) — this buyer switches suppliers more often than others.n = 649 awards since 2016
  • 35% of the bids received came from small and medium-sized enterprises (59 procedures with a bid mix). Country: 81%.n = 59
  • The median procedure drew 3 bids (60 procedures with a bid count); 18% ended with a single bidder. Country: median 2.3 bids.n = 60
  • The award came in at a median 90% of the estimated value (40 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 82%.n = 40
  • 1% of awards went to companies from abroad (649 awards with a known winner country). National average: 0%.n = 649
  • 3% of the bids received came from other countries (59 procedures with a bid mix) — all bidders, not just the winners. Country: 2%.n = 59

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Expected next awards

From the rhythm of past awards per sector — an expectation, not an announcement. Hit rate so far: 26% of 11,200 closed expectation windows produced a notice.

  • Aug 2026Transport equipment
    about every 1 months · 11 awards · last Jul 2026 to TALLERES ALEGRÍA, S.A.
  • Sept 2026Repair & maintenance
    about every 1 months · 5 awards · last Aug 2026 to SCHMITT - ELEVADORES, LDA
  • Oct 2026Architecture & engineering
    about every 1 months · 11 awards · last Sept 2026 to ENGIMIND – CONSULTORES DE ENGENHARIA E PLANEAMENTO, LDA
  • Nov 2026Office & computing machinery
    about every 2 months · 3 awards · last Sept 2026 to SHIELD DOMAIN, S.A.

Who has won here before

CompanyAwardsPeriod
Intevial222026
Construções J.J.R. & Filhos, SA152025–2026
HITACHI RAIL GTS PORTUGAL, S.A.132017–2026
LeasePlan Portugal - Com. e Alug. de Autom. e Equip., Unip. Lda112025–2026
Viatel - Tecnologia de Comunicações S.A.62025–2026
CONSTRUÇOES JJR & FILHOS, S.A.62026
Siemens Mobility, Unipessoal Lda62018–2026
Profico - Consultores de Engenharia S.A62020–2026
FLOPONOR S A52026
Coba Consultores de Engenharia e Ambiente S.A52026

From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.