Infraestruturas de Portugal, SA
Portugal · 30 open tenders · 420 documented awards
Current tenders
Acquisition of track equipment for the Douro Line - Caíde / Marco
1.319.750 €Deadline 21 Aug · 1 day left
Contract - NORTH LINE - ALVERCA-CASTANHEIRA DO RIBATEJO - OVERHEAD BRIDGE FOR SUPPRESSION OF PN PK 23,385 - EXECUTION
5.500.000 €Deadline 24 Aug · 4 days left
Acquisition of track equipment for the Beira Baixa Line - Sarnadas and Barca da Amieira Stations
340.800 €Deadline 24 Aug · 4 days left
VOUGA LINE - GEOTECHNICAL INFRASTRUCTURE INSPECTIONS
521.100 €Deadline 25 Aug · 5 days left
NORTHERN LINE - INFRASTRUCTURE INSPECTIONS IN THE SCOPE OF GEOTECHNICS - COMN
743.925 €Deadline 25 Aug · 5 days left
Empreitada - EN115, KM59+200 A KM69+900. STABILIZATION OF THE ROAD PLATFORM - 1st Phase - IT2026
7.500.000 €Deadline 27 Aug · 7 days left
Maintenance Work - CORRECTIVE PAVEMENT MAINTENANCE 2026 SOUTH - FARO - 2 LOTS
1.900.000 €Deadline 28 Aug · 8 days left
Construction - CORRECTIVE MAINTENANCE OF PAVEMENT 2026 SOUTH - FARO - 2 LOTS
1.900.000 €Deadline 28 Aug · 8 days left
GSM-R BSS RFN - MAINTENANCE AND OPERATION (2026 - 2029)
748.000 €Deadline 31 Aug · 11 days left
ACQUISITION OF ECOSYSTEM SUPPORT SYSTEMS AND OPERATIONAL MANAGEMENT OF CYBERSECURITY
700.000 €Deadline 31 Aug · 11 days left
WEST LINE, SINTRA LINE AND BELT LINE - ROUTINE INSPECTIONS OF GEOTECHNICAL STRUCTURES
478.400 €Deadline 31 Aug · 11 days left
ACQUISITION OF SERVICES - IP8(EN260) - VILA NOVA DE SÃO BENTO (45+885) / FRONTEIRA (FICALHO) (KM 61+630) - REHABILITATION
650.000 €Deadline 1 Sept · 12 days left
ACQUISITION OF SERVICES - EN341 - ER1-7 TAVEIRO (KM 42+200) AND ALMEGUE NODE (KM 49+065) - REHABILITATION
700.000 €Deadline 2 Sept · 13 days left
Acquisition of Services - Detailed Design - IC2(EN1) - MEIRINHAS (KM 136+700) / POMBAL (KM 148+500) - REQUALIFICATION
450.000 €Deadline 3 Sept · 14 days left
Empreitada - EN103 - VINHAIS-BRAGANÇA
82.500.000 €Deadline 7 Sept · 18 days left
Acquisition of Services - IP Group Health Insurance for 2027 Annual Coverage
3.553.470 €Deadline 7 Sept · 18 days left
L. Minho/L. Douro/Braga Branch/L. Guimarães/L. Leixões/S. Gemil Coordination - Routine Inspections of Containment Works
600.000 €Deadline 7 Sept · 18 days left
L. DOURO - CAÍDE/MARCO SECTION - SUPPLY AND INSTALLATION OF RAILWAY TELEMATIC SYSTEMS
850.000 €Deadline 7 Sept · 18 days left
VOUGA LINE - INFRASTRUCTURE INSPECTIONS IN THE CONTEXT OF GEOTECHNICS
521.100 €Deadline 8 Sept · 19 days left
NORTHERN LINE - INFRASTRUCTURE INSPECTIONS IN THE SCOPE OF GEOTECHNICS - COMN
743.925 €Deadline 8 Sept · 19 days left
Acquisition of Services - IC8 CAPACITY INCREASE OF THE SECTION BETWEEN POMBAL (IC2) (KM 42+000) AND VILA VELHA DE RODÃO (A23/IP2) (KM 142+000) REQUALIFICATION
2.400.000 €Deadline 10 Sept · 21 days left
PRAGAL CAMPUS - REMODELING OF CELLS IN PT1, PT3 AND INSTALLATION OF MONITORING EQUIPMENT IN PTS
250.000 €Deadline 14 Sept · 25 days left
Contract - L. SINES - 3rd PHASE - EXECUTION
16.500.000 €Deadline 14 Sept · 25 days left
Acquisition of single-block fixed-tip crosspieces
1.444.900 €Deadline 15 Sept · 26 days left
REHABILITATION OF THE VCC FLEET
6.300.000 €Deadline 16 Sept · 27 days left
Contract - L. SINES - 3rd PHASE - EXECUTION
16.500.000 €Deadline 21 Sept · 32 days left
Construction Work - L. MINHO - REINFORCEMENT OF LIMA BRIDGE FOR BRAKING ACTIONS AND LOAD CLASS D4
7.500.000 €Deadline 28 Sept · 39 days left
Construction Work - NORTH LINE - ALVERCA-CASTANHEIRA DO RIBATEJO - GRADE SEPARATION FOR SUPPRESSION OF PN PK 23,385 - EXECUTION
5.500.000 €Deadline 30 Sept · 41 days left
Contract "LC+LAV S&T01-VARIOUS SECTIONS RFN, CONVENTIONAL AND HIGH SPEED-SIGNALLING, TELECOMMUNICATIONS AND ETCS-DESIGN-EXECUTION-MAINTENANCE
360.000.000 €Deadline 8 Oct · 49 days left
Contract - N. LINE - ENTRONCAMENTO - PHOTOVOLTAIC SOLAR PARK AND SUBSTATION ADAPTATION - PHASE1 (UP TO 9MWP)
10.000.000 €Deadline 29 Oct · 70 days left
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
20188
20191
20208
20215
20232
202565
2026624
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Intevial | 22 | 2026 |
| HITACHI RAIL GTS PORTUGAL, S.A. | 13 | 2017–2026 |
| Construções J.J.R. & Filhos, SA | 11 | 2025–2026 |
| LeasePlan Portugal - Com. e Alug. de Autom. e Equip., Unip. Lda | 11 | 2025–2026 |
| Viatel - Tecnologia de Comunicações S.A. | 6 | 2025–2026 |
| Siemens Mobility, Unipessoal Lda | 6 | 2018–2026 |
| Profico - Consultores de Engenharia S.A | 6 | 2020–2026 |
| FLOPONOR S A | 5 | 2026 |
| Coba Consultores de Engenharia e Ambiente S.A | 5 | 2026 |
| Efacec Engenharia e Sistemas, S.A. | 4 | 2017–2026 |
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.