Construction work IES Monzón (Huesca)
Obra de construcción IES Monzón (Huesca)
Spain · Zaragoza · how to bid here →
Your path to submission
- Deadline: 14 October at 00:00 — 29 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SPA.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew just one bid (265 procedures with a bid count); 59% ended with a single bidder. Sector: median 14 bids.n = 265
- In this sector the buyer awards roughly every month (9 awards, most recently October 2024) — by that rhythm the next award was due around November 2024. The last award went to MONCOBRA, S.A..n = 9
- 12% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 66%.n = 10
- 49% of this buyer's awards went to companies that had already won here before (329 awards since 2022, spread over 162 companies). 51% went to new names.n = 329 awards since 2022
- 0% of the bids received came from other countries (10 procedures with a bid mix) — all bidders, not just the winners. Sector: 10%.n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Spain · Construction work, 84 contracts went to foreign companies over the last 3 years (of 96,721 recorded awards) — mostly from Portugal, Italy, France.
Typical field: median 11 (from 6,429 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Procedimiento Abierto
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SULE INGENIERÍA Y PREVENCIÓN, S.L. · Zaragoza | 15 | 2023–2024 |
| PRODIA, S.L. · Zaragoza | 11 | 2023 |
| ASESORAMIENTO, EJECUCIÓN Y GESTIÓN 2012,SL | 10 | 2022–2023 |
| Rafael Gonzalez Barriada | 10 | 2023 |
| ARAGONESA DE SOLUCIONES INTEGRALES EN PVC, S.L. · Zaragoza | 8 | 2023–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACSP — Plataforma de Contratación del Sector Público (Spanien) → Registration, signature, fees — from the operator's bidder manual.