Extension of berth wrenches 10 and 12 in the mussel area, including reinforcements înN behind the wrenches - REST to be executed

Extinderea cheurilor danelor 10 şi 12 din zona midia, inclusiv consolidări ȋn spatele cheurilor - rest de executat — original title

RORomania

Your path to submission

  1. Deadline: 27 November at 15:00 — 26 days left.
  2. You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The object of this procurement is to complete the investment works by executing the works remaining to be carried out and the fixes of the works previously executed, in order to achieve the objective of national interest: ‘Extension of berths 10 and 12 in the Midia area, including reinforcements behind the berths’, in compliance with the minimum technical conditions referred to in Specification No 34582/09.09.2026. Number of days until which clarifications can be requested before the closing date for submission of tenders/candidates: 18 The deadline within which the contracting entity will respond to requests for clarifications or additional information in relation to the tender documentation is the 11th - the day before the deadline set for the submission of tenders. Any request for clarification must be submitted in SEAP (https://e-licitatie.ro/pub ). The contracting entity shall not…

Show full description

… respond to requests made after this deadline. Performance of the contract is subject to other special conditions Considering that the financing of the entire investment objective is provided by non-reimbursable external funds, budgetary sources and own sources (as appropriate), initially through the Large Infrastructure Operational Programme 2014-2020, Priority Axis 1 – Improving mobility through the development of the TEN-T network and metro transport. Specific objective 1.3 – Increasing the use of waterways and ports located on the TEN-core network, being a phased project under the 2021-2027 Transport Programme, the Contracting Entity (CE) will conclude the contract with the successful tenderer only to the extent that the funds necessary for the procurement will be ensured by the approval of the update of the technical-economic indicators and/or the extension of the eligibility period beyond 31.12.2026, by the Ministry of Transport and Infrastructure as Transport Bridging Body (ITB). If, regardless of the reasons, the update of the technical-economic indicators and/or the extension of the eligibility period beyond 31.12.2026 are not approved by the Ministry of Transport and Infrastructure (MTI) as a Transport Intermediate Body (ITB), the Contracting Entity reserves the right to apply the provisions of Article 225(1)(c) of Law 99/2016, after receiving the notification from the MTI - ITO regarding the non-granting of approval, it being impossible to conclude the sectoral procurement contract from non-reimbursable external funds. In this situation, the Contracting Entity reserves the right to ensure the achievement of the investment objective from its own sources. Tenderers in this procedure understand that the Contracting Entity and/or the MTI-ITO cannot be held liable for any damage in the event of cancellation of the award procedure, regardless of the nature of such damage and regardless of whether the Contracting Entity and/or the MTI-ITO have been notified of the existence of such damage. The tenderers in this procedure accept the use of these special conditions of the data sheet /suspensive clause and assume full responsibility for any damage they may suffer in the situation described.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published23 Oct 2026
ProcedureLicitatie deschisa

Type of service

45 · Construction work
CPV 45244000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (35 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to POWER ELECTRIC.n = 35
  • 86% of this buyer's awards went to companies that had already won here before (2,149 awards since 2021, spread over 252 companies). That is well above the sector norm (59%) — newcomers have a harder time here than elsewhere.n = 2,149 awards since 2021
  • The median procedure drew 2 bids (92 procedures with a bid count); 29% ended with a single bidder. Sector: median 5 bids.n = 92
  • 89% of the bids received came from small and medium-sized enterprises (60 procedures with a bid mix). Sector: 65%.n = 60
  • 10% of the bids received came from other countries (60 procedures with a bid mix) — all bidders, not just the winners. Sector: 2%.n = 60

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In this buyer's last 17 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
SELP SRL2412024–2026
EXPERT TOOLS SRL1802024–2026
ARABESQUE1782024–2026
SELGROS CASH&CARRY SRL1742024–2026
DEDEMAN S.R.L.1032024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

62
2024
19
2025
23
2026
104 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Friday 27 November at 15:00

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 17 completed awards — not a statement about this procedure.)

This procedure allows 35 days between publication and deadline — typical in this country is 33 (median of 2,802 procedures). A normal window for this market.

Foreign bidders

In Romania · Construction work, 167 contracts went to foreign companies over the last 3 years (of 84,629 recorded awards) — mostly from France, Italy, Germany.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on SICAP / e-licitatie. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via SICAP / e-licitatie before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now