Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Hot rolled metallurgical products - Lot 4, Steel sheets

Produse metalurgice laminate la cald - Lot 4, Table din otel — original title

RORomania

Your path to submission

  1. Deadline: 26 November at 15:00 — 26 days left.
  2. You submit on SICAP / e-licitatie — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

PURCHASE OBJECTIVE Purchase of "Hot-rolled metallurgical products - Lot 4 - steel sheets", by concluding a framework agreement for a duration of 12 months. Activities specific to the Contracting Entity in which Hot Rolled Metallurgical Products will be used - LOT 4: Steel sheets are: - Specific metal fabrication works: pipe supports, fixed and movable pipe supports; - Metal fabrication works in order to ensure the security of production spaces; - Divisions of storage spaces, making shelves; - Repair work on damaged walls of thermal points; - Enclosure works, making supporting pillars. Purchase of Hot Rolled Metallurgical Products - Lot 4: Steel plates will allow the Contracting Entity to carry out construction works on the components of thermal channels and thermal points according to the quality requirements, of metallic fabrications for their use in supporting pipes and partitioning of…

Show full description

… storage spaces, of revisions to the components of technological installations. In this context, the Contracting Entity shall obtain, by optimising maintenance and operating costs, an increase in the lifetime of the installations. By purchasing Hot Rolled Metallurgical Products - lot 4: Steel plates are aimed at: - Ensuring the continuity of the public service of thermal energy supply in a centralized system in the Municipality of Bucharest; - Reducing the loss of thermal energy and water; - Compliance with the compliance obligations to which the company subscribes. The products to be delivered must comply with the requirements imposed by the Specifications. It is proposed to conclude a framework agreement with a duration of 12 months. The products to be delivered must comply with the requirements imposed by the Specification. Deadlines for submission/response to requests for clarifications/additional information: A. In accordance with Article 172(1) of Law No 99/2016, as amended, the deadline for any interested economic operator to request clarifications or additional information in relation to the tender documentation is 20 days before the closing date for submission of tenders. B. In accordance with Article 172(2) of Law No 99/2016, as subsequently amended and supplemented, the contracting entity shall respond clearly and completely to all requests for clarification/additional information on the 12th day before the deadline set for the submission of tenders. C. In accordance with the provisions of Article 29(3) of Government Decision No 394/2016, as subsequently amended and supplemented, the contracting entity mentions that it will respond only to requests for clarifications made by economic operators by the established deadline. Tenders, applications or requests to participate must be submitted to: electronically via: (URL) www.e-licitatie.ro

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeSupplies
Estimated valuevalue not published
Published22 Oct 2026
ProcedureLicitatie deschisa

Type of service

44 · Construction materials
CPV 44330000

Clement What the numbers say about this buyer

  • 41% of this buyer's awards went to companies that had already won here before (442 awards since 2024, spread over 260 companies). That is well below the sector norm (84%) — this buyer switches suppliers more often than others.n = 442 awards since 2024
  • The median procedure drew just one bid (12 procedures with a bid count); 67% ended with a single bidder. Sector: median 3 bids.n = 12
  • Across 3 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (3 of 3), References: supplies (2 of 3), Share of subcontractors (2 of 3), Independent quality certificate (e.g. ISO 9001) (2 of 3).n = 3
  • 0% of the bids received came from other countries (12 procedures with a bid mix) — all bidders, not just the winners. Sector: 2%.n = 12
  • Not one of the 442 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 442

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
VOLVO ROMANIA102024–2026
MATEROM SRL102024–2026
COSTA UTILAJE82024
COMPANIA ROMPREST SERVICE S.A.72024
DIGISIGN72024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

68
2024
14
2025
19
2026
101 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Thursday 26 November at 15:00

Tactics

When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 1,892 completed awards — not a statement about this procedure.)

This procedure allows 35 days between publication and deadline — typical in this country is 33 (median of 2,743 procedures). A normal window for this market.

Foreign bidders

In Romania · Construction materials, 30 contracts went to foreign companies over the last 3 years (of 256,926 recorded awards) — mostly from Germany, Italy, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on SICAP / e-licitatie. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via SICAP / e-licitatie before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now