Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Redesign of the Mühlenweg estuary

Umgestaltung Einmündung Mühlenweg — original title

DEGermanyBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 11 November at 09:00 — 10 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Conversion of the confluence "Mühlenweg · The municipality of Nordstemmen intends in the village of Burgstemmen to the · residents from the development area "Mühlenweg" via a crossing aid · on the K 503 to enable the safe, footpath connection via the K 503 to the · village center of Burgstemmen.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published26 Oct 2026
ProcedureÖffentliche Ausschreibung
Place of performance31171 Nordstemmen

Type of service

45 · Construction work
CPV 45000000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (77 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to Chr. Hubensack GmbH.n = 77
  • 56% of this buyer's awards went to companies that had already won here before (331 awards since 2018, spread over 143 companies). That is well above the sector norm (40%) — newcomers have a harder time here than elsewhere.n = 331 awards since 2018
  • The median procedure drew 2 bids (324 procedures with a bid count); 33% ended with a single bidder. Sector: median 4 bids.n = 324
  • The award came in at a median 96% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 8
  • 100% of the bids received came from small and medium-sized enterprises (24 procedures with a bid mix). Sector: 87%.n = 24

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Vergabeunterlagen Gehweg „Mühlenweg“ – Gemeinde Nordstemmen

The input text contains excerpts from the tender and contract documents for a German public works contract concerning the “Umgestaltung Einmündung Mühlenweg / Gehweg ‘Mühlenweg’” in the municipality of Nordstemmen (Germany).

The documents are clearly based on German procurement and construction law, in particular VOB/A and VOB/B, and refer to German norms (DIN, EN, ZTV, Merkblätter) and German labour and tariff regulations (for example the NTVergG and MiLoG).

Thus, the country point of view is that of Germany and its public procurement framework for construction works.

The general background is a road and sidewalk construction project at the junction “Mühlenweg / K503” in Burgstemmen.

The Leistungsverzeichnis and drawings (such as “Regelprofil”, “Lageplan”) describe in detail the planned street and sidewalk structure (for example asphaltdeckschicht, asphalttragschicht, Schottertragschicht, Frostschutzschicht, Winkelstützen, Entwässerungseinrichtungen).

The soil report (Bodengutachten) and environmental lab reports (AGROLAB) form part of the technical basis, and the text repeatedly states that the soil investigation becomes a contractual document.

The contract is governed by VOB/A (Vergabeverfahren) and VOB/B (Ausführung, Abrechnung, Abnahme).

Regarding what the bidder must submit and minimum qualification requirements, the documents specify that the offer must be submitted in German using the forms provided by the contracting authority (for example VVB 221 “Preisermittlung bei Zuschlagskalkulation” and Formblatt 223 “Aufgliederung der Einheitspreise”).

As such, non‑form or late offers are to be excluded.

For suitability (Eignung), companies that are already prequalified prove their suitability by indicating their PQ number in the Präqualifikationsverzeichnis; non‑prequalified companies must submit a completed “Eigenerklärung zur Eignung” (VVB 124) with information such as turnover in the last three financial years in comparable construction services, references on comparable projects over the last five years, and statements on available workforce.

The same document and the participation conditions require declarations regarding register entries (Handelsregister, Handwerksrolle, IHK), insolvency and liquidation status, absence of exclusion grounds under § 6e EU VOB/A, proper payment of taxes, levies and social security contributions, and membership in the Berufsgenossenschaft.

On request and if the bid comes into closer consideration, bidders must supply supporting certificates such as Gewerbeanmeldung, Handelsregisterauszug/Handwerkskarte, Unbedenklichkeitsbescheinigungen from the Sozialkasse, Finanzamt and Berufsgenossenschaft, as well as a Freistellungsbescheinigung under § 48b EStG and reference confirmations from clients; from 30,000 EUR upwards the contracting authority will obtain information from the Wettbewerbsregister.

Show all 38 statements

Additionally, there is a mandatory “Erklärung zu § 4 Abs. 1 NTVergG” on tariff compliance and minimum wages (MiLoG), which must also be provided by any envisaged subcontractors or temporary work agencies.

Concerning the scope of the contract (what, how much, where, when), the documents describe a construction measure “Umgestaltung Einmündung Mühlenweg / K503 in der OS Burgstemmen” with project number 10181.

The place of performance is the municipal road space of Nordstemmen, Germany.

The “Regelprofil” drawing shows, for example, a paved sidewalk structure with 4 cm Pflasterdecke on 10 cm Brechsand‑Splitt, 25 cm Schottertragschicht and 26 cm Frostschutzschicht, as well as asphalt tie-in structures and the founding of retaining walls (Winkelstützen) on concrete and mineral layers.

The Leistungsverzeichnis includes positions on site set‑up and clearing, soil and earthworks, drainage, cable and pipeline protection, waste disposal (for example Boden Z0 AVV 17 05 04), trench backfilling, and quality tests (for example static and dynamic plate load tests according to DIN 18134 and TP BF‑StB, test fields and waste characterisation according to LAGA Merkblatt 20).

Quantities are given per item in the LV (for example specific numbers of plate load tests or cubic metres of material), and all prices are to be quoted net (without VAT).

As to award criteria and weighting, the text provided refers extensively to formal requirements but does not explicitly state the evaluation formula or weighting of criteria such as price, quality or time.

The standard VOB/A framework and the wording on price (for example prohibition of “Mischkalkulationen”, statement that only unconditional percentage discounts on the settlement sum at the designated place are considered) indicate that at least a price‑based evaluation is foreseen; however, no explicit percentages or multi‑criteria weighting are included in the excerpts.

The documents also regulate side offers (Nebenangebote): such offers are only permissible if minimum requirements are set and fulfilled; they must be qualitatively and quantitatively equivalent to the base specification and broken down according to quantities and unit prices, otherwise they are excluded from evaluation.

On risks and special conditions, the documents lay down numerous obligations for the contractor.

For instance, the contractor bears responsibility for traffic safety at the construction site, including all traffic control measures, which must be applied for with the competent road traffic authority (ZTV SA applies).

Access for local residents and safe access to buildings and properties must be ensured throughout construction, including at the end of each working day.

The contractor must independently obtain information from utility companies on underground cables and supply and disposal lines before starting earthworks, coordinate any work in the vicinity of these lines and preserve cable markers; damage and approvals are at the contractor’s risk.

The contractor must also obtain permits for using classified roads and private land, bear the costs of any damage there, provide and – where the client does not supply areas – rent storage and workspaces.

The disposal of surface water up to acceptance is also the contractor’s responsibility, and the costs must be included in the prices.

Site set‑up, maintenance and dismantling, as well as winter service and cleaning, are to be priced as ancillary services in the LV items (according to DIN 18299); accordingly, no separate remuneration is granted for these tasks.

The contractor must review the tender and execution documents for completeness and coherence and report any unclear points, gaps or errors before starting the works.

Further special conditions include technical quality and testing obligations: the soil report of Dr. Pelzer und Partner (18.03.2022) forms part of the contract; all DIN and EN standards, including referenced associated standards and accident prevention regulations, apply in their latest version, and a detailed list of applicable ZTVs and technical regulations is provided (such as ZTV E‑StB, ZTV Asphalt‑StB, ZTV Pflaster‑StB, ZTV SoB‑StB, ZTV Verm, ZVB/E‑StB).

The contractor must submit material suitability tests at least one week before construction starts; their submission and approval are a mandatory precondition for commencement of work.

Ongoing self‑monitoring test results must be submitted weekly, and any control tests must be carried out by an officially approved materials testing institute; the client reserves the right to take samples and order tests.

Before acceptance under VOB/B, the contractor must confirm the achieved qualities and compliance of materials and execution with approvals and recognised rules of technology.

There are also specific technical requirements, such as hand excavation in root zones of trees and adherence to tree protection rules.

Regarding subcontracting, the “Verzeichnis der Nachunternehmerleistungen” (VVB 233) states that the type and scope of subcontracted partial services must be named in the offer, and – specifically highlighted in the form – that the names of the subcontractors must already be provided at the time of bid submission.

As to contradictions or corrections within the documents, the excerpts do not reveal any explicit conflicting statements (for example about scope or responsibilities); instead they emphasise that the long version of the LV is binding and that in case of doubt the contracting authority must be consulted.

The participation conditions state that all DIN/EN standards and ZTVs apply in the version valid three months before the end of the bid period, and where uncertainty exists the client is to be contacted, which clarifies precedence in case of normative changes.

No differing instructions on, for example, subcontractor disclosure, suitability proofs or pricing rules appear; they are repeated in a consistent manner across the participation conditions and forms.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 27/10/2026

Clement
In this buyer's last 79 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
KFB Jessen GmbH · Soltau102024–2026
Scania Vertrieb und Service GmbH · Koblenz102025–2026
christmann informationstechnik + medien GmbH & Co. KG · Ilsede92021–2026
EVI Energieversorgung Hildesheim GmbH & Co. KG · Hildesheim72017–2025
Ahlborn GmbH · Uslar72023–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

2
2021
58
2022
117
2023
227
2024
280
2025
120
2026
804 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Wednesday 11 November at 09:00

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 79 completed awards — not a statement about this procedure.)

This procedure allows 16 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on service.bund.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via service.bund.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now