Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Furnishing in general

Möblierung allgemein — original title

DEGermanyBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 9 November at 23:59 — 9 days left.
  2. You submit on evergabe.NRW — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The summary in English is being prepared. The official description below is in the original language (DE).

Show original description (DE)

Auftragsgegenstand ist die Lieferung und Montage von losen Möbeln. Die Einbringung erfolgt in das Erdgeschoss und 1. Obergeschoss des Neubaus des Mobilitätszentrum UrbanLand (MZL). Der Auftrag umfasst im Wesentlichen: 1 x Sitzbank 1x Stehtisch 6x Barhocker 4x Besprechungsstuhl 1x Meetingstuhl 4x Sitzecke rechts 4x Sitzecke links 5x Hocker 5x Beistelltisch 25x Tagungsstuhl stapelbar, reihenverbindbar, gepolstert 36x Tagungsstuhl stapelbar, reihenverbindbar, ungepolstert 1x Stuhlwagen 4x Akustik-Trennwand 10x Whiteboard 4x mobiler Whiteboardhalter 1x Whiteboard-Wagen 1x Mobile Garderobenstange für Kleiderbügel 45x Kleiderbügel 1x Ruheliege 1x Wickeltisch

From the evergabe.NRW version of this same notice.

Contract

TypeSupplies
Estimated valuenot published — common for below-threshold procedures
Published16 Oct 2026
ProcedureÖffentliche Ausschreibung
Place of performance32657 Lemgo

Type of service

39 · Furniture & furnishings
CPV 39150000

Clement What the numbers say about this buyer

  • 41% of this buyer's awards went to companies that had already won here before (139 awards since 2010, spread over 83 companies). 59% went to new names.n = 139 awards since 2010
  • The median procedure drew 2 bids (132 procedures with a bid count); 40% ended with a single bidder. Sector: median 2 bids.n = 132
  • The award came in at a median 78% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 81%.n = 6
  • 75% of the bids received came from small and medium-sized enterprises (33 procedures with a bid mix). Sector: 88%.n = 33
  • Across 5 procedures with structured selection criteria, this buyer most often required: Professional liability insurance (5 of 5), Minimum turnover in the contract field (4 of 5), Professional register enrolment (4 of 5), Trade register enrolment (4 of 5).n = 5

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
In comparable contracts in this sector nationwide (10,395 with a known bid count), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
T&R Gebäude Service GmbH82022–2026
Walke + Acker GmbH62025
AVL Deutschland GmbH · Wiesbaden42025–2026
Bietergemeinschaft: BEN-Tec GmbH, innofas GmbH, H2 Powercell GmbH · Emsdetten32025
Gehner Tischlerei GmbH · Osnabrück32025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

4
2022
1
2023
2
2024
2
2025
2
2026
11 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 9 November at 23:59

Tactics

When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 10,395 completed awards — not a statement about this procedure.)

This procedure allows 25 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Germany · Furniture & furnishings, 83 contracts went to foreign companies over the last 3 years (of 10,761 recorded awards) — mostly from Austria, Denmark, Poland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on service.bund.de. The full specification and all annexes are there.
This procedure is published on 2 portals
Several sources carry the same notice.
service.bund.deNoticeevergabe.NRWSubmission portal
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via service.bund.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now