Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

CO?e accounting of traffic-released construction projects 2026

CO?e-Bilanzierung verkehrsfreigegebener Bauprojekte 2026 — original title

DEGermanyBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 5 November at 12:00 — 4 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published15 Oct 2026
ProcedureÖffentliche Ausschreibung
Place of performanceDeutschland

Type of service

90 · Cleaning, environment & waste
CPV 90713000

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 4 months (70 awards, most recently July 2026) — the next award is due around November 2026 by that rhythm. The last award went to Rudolf Weber Gebäudereinigung und Gebäudedienste SE & Co. KG.n = 70
  • The median procedure drew 2 bids (1,069 procedures with a bid count); 40% ended with a single bidder. Sector: median 4 bids.n = 1,069
  • 59% of this buyer's awards went to companies that had already won here before (1,077 awards since 2019, spread over 436 companies). 41% went to new names.n = 1,077 awards since 2019
  • The award came in at a median 91% of the estimated value (25 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 81%.n = 25
  • Across 44 procedures with structured selection criteria, this buyer most often required: Professional liability insurance (44 of 44), Share of subcontractors (41 of 44), Trade register enrolment (40 of 44), Professional register enrolment (37 of 44).n = 44

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/10/2026.

Tender documents at a glance

The essentials of the tender documents, read in seconds. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

The input text concerns a public procurement procedure in Germany (Autobahn GmbH des Bundes, Berlin) under the Unterschwellenvergabeordnung (UVgO) for the service “CO₂e‑Bilanzierung verkehrsfreigegebener Bauprojekte 2026” (Vergabe-Nr. 2026‑10146). It sets out the formal tender conditions, required bidder submissions, qualification criteria, and the technical scope of work. The perspective is that of a German public contracting authority procuring a specialized consultancy/service, with explicit references to German law (UVgO, GWB, WRegG), German registers (Handelsregister, Berufsregister) and EU sanctions law (VO (EU) Nr. 833/2014).

The background of the documents is a structured, open tender for CO₂‑assessment services covering already traffic‑released motorway construction projects. Such as in the “Aufforderung zur Angebotsabgabe” and the “Bewerbungsbedingungen”, it is specified that the procedure is an öffentliche Ausschreibung, the offer must be in German, submitted using HVA L‑StB forms via the electronic Vergabeplattform by 05.11.2026, with a bid validity (Bindefrist) until 31.12.2026. The contracting authority provides a bundle of A‑documents to be observed, B‑documents for later contract execution, and C‑documents to be completed and returned with the offer (e.g. Angebotsschreiben, Eigenerklärung zur Eignung, Unterauftragnehmer-Verzeichnis, Team- und Referenzformblätter).

Show the full summary (6 paragraphs)

Regarding what the bidder must submit and minimum qualification requirements, the text is detailed. Such as in the Eigenerklärung zur Eignung and the specific Eignungskriterien, the bidder must submit: (i) the completed “Eigenerklärung zur Eignung” (or EEE) covering non‑exclusion under §§ 123, 124 GWB, tax/social security compliance, insolvency status, registration in a Berufs-/Handelsregister or equivalent, and a declaration on professional/betriebshaftpflicht insurance with defined minimum sums (1,000,000 EUR for persons and 1,000,000 EUR for Sach-/Vermögensschäden); (ii) company‑level references via HVA Eigenerklärung Eignung IV and Formblatt C‑F4.1, showing at least three comparable projects (since 2021) in CO₂‑bilanzierung/THG‑Berechnung, LV-/Mengen-/Projektdaten-Auswertung, CO₂‑Faktoren-Mapping und Ergebnisaufbereitung, including Auftraggeber, contact, Leistungszeitraum, Auftragswert and used tools; (iii) team references via C‑F_Formblatt Team_EK_UVgO and C‑F4.2, listing the hauptverantwortlich eingesetzten Personen, their roles and project‑specific experience, ensuring that collectively all listed competence areas are covered (CO₂/LCA‑Methodik, Großprojekte, iTWO/GAEB/Excel/CSV‑Daten, CO₂‑Faktoren & QS, Lebenszyklusphasen A1‑A5); and (iv) an own declaration that a suitable digital tool or structured data‑processing approach for CO₂‑bilanzierung is available and used, able to perform structured data import, cleaning, mapping of positions to CO₂‑factors, calculation, documentation, plausibility checking and project/portfolio reporting. Economic/financial capacity is primarily addressed through the generic Eigenerklärung (turnover fields exist but the specific Mindestjahresumsatz appears to be set via “*” and not explicitly filled in the excerpts), with the option of economic “Eignungsleihe” from other companies supported by a Verpflichtungserklärung wirtschaftliche Eignungsleihe.

The scope of the contract is described in the Leistungsbeschreibung. Such as in section 3.1–3.3, the contract begins with award and ends on 30.06.2027, performance starting “unverzüglich” after Zuschlagserteilung. The place of performance is effectively the Autobahn GmbH’s nationwide portfolio; the substantive scope is the CO₂‑bilanzierung of 80–120 representative, already traffic‑released construction projects of the Autobahn GmbH. Basis inputs are Leistungsverzeichnisse, Mengenansätze and iTWO‑Datenexporte provided by the client. The bidder must present a full Leistungskonzept explaining: methodical setup for large Autobahn projects; joint selection logic for the 80–120 projects; procedures for Datenübernahme/-bereinigung/-konsolidierung; emissions‑relevant filtering and Wesentlichkeitslogik (focus on materials like asphalt, concrete, steel); mapping of LV-/Mengen to CO₂‑Faktoren including data sources and QS; Berechnungsmethodik over life‑cycle phases A1–A5; applicability to various Bautypen and measures; digital tool and Skalierungskonzept; quality assurance (checks, Vier‑Augen‑Prinzip, handling deviations); documentation of assumptions, data sources and limitations; and concrete deliverables such as project result sheets, portfolio analysis, emissions driver breakdowns, structured data tables, a Berichterstattung‑ready summary and recommendations to reduce future bilanzierungsaufwand.

Award criteria and weighting are touched on in the Aufforderung and via a referenced “Gewichtung der Zuschlagskriterien” form. Such as in section 6, price is a Zuschlagskriterium and the “Wertungssumme” is based on the recalculated Angebotssumme (including cheaper Grund-/Wahlpositionen and unconditional discounts). However, the text explicitly states that “Preis und weitere Zuschlagskriterien gemäß Anlage Vordruck HVA L‑StB Gewichtung der Zuschlagskriterien” are applied, meaning that non‑price criteria (presumably qualitative aspects of Konzept, method, tools, team competence) are also weighted; the exact weighting values are in the separate, but referenced, “Gewichtung der Zuschlagskriterien” document. Nebenangebote are expressly not permitted for this procedure (crossed “X Nebenangebote sind nicht zugelassen”), so competition is on the main offer only. Moreover, certain fields in the Eigenerklärung (e.g. Umweltmanagement, Untersuchungs- und Forschungsmöglichkeiten, technical equipment) may either be requested or not, depending on the contracting authority’s markings, with detailed evidence only required “auf gesondertes Verlangen” for bidders in closer consideration.

Risks and special conditions are mainly outlined through compliance, subcontracting and formalities. Such as in the Compliance-Klausel, the contractor undertakes to comply with anti‑corruption, anti‑money‑laundering, human rights, environmental and wage/tariff obligations, and to ensure similar behavior by subcontractors; serious breaches or inclusion on sanction lists allow the client to withdraw or terminate for cause and can trigger a contractual penalty of 5% of the contract price plus potential further damages. Subcontracting and Eignungsleihe are regulated via the Bewerbungsbedingungen and specific forms: intended sub‑deliveries must be identified in the Eigenerklärung and the separate “Leistungen von Unterauftragnehmern” form, with each supporting company bound via a Verpflichtungserklärung (for performance or for economic capacity, jointly liable in the latter case). Bietergemeinschaften must submit a joint declaration stating internal organization and gesamtschuldnerische Haftung. Bid validity and procedural risk are addressed via the bindefrist (31.12.2026) and the obligation to point out any perceived errors or contradictions in the tender documents “unverzüglich” to the Vergabestelle before bid submission. There is no mention of a mandatory site visit, guarantees or performance bonds in the provided excerpts; penalties relate primarily to compliance and competitive behavior, and insurance is a precondition rather than a classical contract guarantee. Contradictions are partly neutralized by explicit statements (e.g. Nebenangebote: general Bewerbungsbedingungen allow Nebenangebote, but the specific Aufforderung overrides them by marking “nicht zugelassen”; thus the procedure-specific marking applies). In case of ambiguity, the Bewerbungsbedingungen require bidders to ask the Vergabestelle in text form; the authority then clarifies which statement prevails.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 23/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Prequalify once (PQ register) instead of collecting certificates for every bid — worth it from a few offers per year.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Bayernwerk Netz GmbH · Regensburg252022–2025
Famo Vertrieb202022–2026
Westnetz GmbH · Dortmund142024–2025
M. Schnecke & A. Schüßler GbR · Merseburg142025–2026
Schleswig-Holstein Netz AG · Quickborn/Krs. Pinneberg122022–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

2
2020
5
2021
3
2022
15
2024
19
2025
13
2026
57 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Thursday 5 November at 12:00

Tactics

When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 70 completed awards — not a statement about this procedure.)

This procedure allows 22 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much tighter than usual: the first week counts.

Foreign bidders

In Germany · Cleaning, environment & waste, 45 contracts went to foreign companies over the last 3 years (of 43,631 recorded awards) — mostly from Netherlands, Austria, Belgium.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on service.bund.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via service.bund.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now