Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Red Barracks West WA8 - Building Automation

Rote Kaserne West WA8 - Gebäudeautomation — original title

DEGermanyBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 17 November at 10:00 — 16 days left.
  2. The submission point is stated in the notice (link on this page).
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published14 Oct 2026
ProcedureÖffentliche Ausschreibung
Place of performance14469 Potsdam

Type of service

45 · Construction work
CPV 45311200

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (162 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to Ueding Modulbau GmbH.n = 162
  • The median procedure drew 2 bids (277 procedures with a bid count); 37% ended with a single bidder. Sector: median 4 bids.n = 277
  • 41% of this buyer's awards went to companies that had already won here before (283 awards since 2017, spread over 168 companies). 59% went to new names.n = 283 awards since 2017
  • Across 16 procedures with structured selection criteria, this buyer most often required: Minimum annual headcount (16 of 16), Trade register enrolment (14 of 16), Special authorisation or membership required (13 of 16), References: works (13 of 16).n = 16
  • From notice to award takes a median 41 days here (23 procedures). Sector: 84 days.n = 23

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Tender documents at a glance

The essentials of the tender documents, checked statement by statement against the documents. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

✓ found in the documents · ❓ not found in the documents or general statement

Vergabeverfahren Gebäudeautomation – Neubau Studentenwohnheime Rote Kaserne West WA8, Potsdam

The input text concerns a German public procurement procedure for a construction-related service: “Gebäudeautomation” for the Neubau von vier Gebäuden für studentisches Wohnen, Rote Kaserne West WA8 in Potsdam (Germany, federal state Brandenburg).

It is clearly based on German construction contract law (VOB/B, BGB), the Brandenburg Vergabegesetz and German tax/social security rules, and it also references EU sanctions law (Verordnung (EU) 2022/576) relating to Russia’s actions in Ukraine.

The buyer’s point of view is that of a German public contracting entity (ProPotsdam GmbH), operating under German and EU public procurement rules.

The documents specify extensively what bidders must submit and which minimum qualification requirements apply.

Such as: the use of standard VHB form sheets is mandatory (e.g.

Form 213 Angebotsschreiben, 124 Eigenerklärung zur Eignung, 221/222 Preisermittlung, 233 Nachunternehmer, 234 ARGE, ggf. 235 andere Unternehmen, 248 Holzprodukte).

With the offer, bidders must provide in particular: the completed offer letter, the priced long-form Leistungsverzeichnis, acceptance of the Zusätzliche Vertragsbedingungen (ZVB 09/2022), price calculation details via 221 or 222, details on subcontracted services (233) and joint ventures (234) if applicable, a declaration on restrictive measures regarding Russia, PQ number or, if not prequalified, the completed Eigenerklärung zur Eignung including turnover for the last three comparable business years, statements on insolvency, tax and social security compliance, membership in the Berufsgenossenschaft, workforce availability, and references for three comparable projects in the last five years.

On separate request, they must later furnish supporting certificates (e.g.

Gewerbeanmeldung, Handelsregister, Handwerkskarte/IHK-Eintrag, Unbedenklichkeitsbescheinigungen of Finanzamt, Sozialkasse, Berufsgenossenschaft, Freistellungsbescheinigung § 48b EStG, reference confirmations, workforce statistics) as well as the detailed Urkalkulation and Aufgliederung der Einheitspreise (223).

The scope of the contract (what, how much, where, when) is defined as building automation (Gebäudeautomation, Los L45) for four new buildings for student housing at Rote Kaserne West WA8, Georg-Hermann-Allee 105, 14469 Potsdam.

The tender is a public VOB/A-section-1 procedure with an Angebotsfrist and Eröffnungstermin on 17.11.2026, Bindefrist ending 17.12.2026.

Show all 37 statements

Such as: the Aufforderung zur Angebotsabgabe and attached plans/schematics (BACnet guideline, Regelschemata, Datenpunktlisten, Baustelleneinrichtungspläne) set out the technical content, while the ZVB and LV define quantities via positions.

The execution periods are phased by building: Haus C (10.03.2027–25.07.2028), Haus A/B (30.06.2027–29.08.2028), Haus D (22.09.2027–03.10.2028); another summary shows a global Ausführungszeit 10.03.2027–03.10.2028.

The contractor must prepare a detailed Ablauf- und Terminplan within two weeks of contract signing, keep it updated monthly (including Soll-Ist comparison), and adhere to contractually binding Fristen.

The place of performance is the specified Potsdam site; temporary site installations (Baustelleneinrichtung Phase 1/2) are given and must be coordinated with the Bauleitung.

Award criteria and weighting are relatively simple and price-focused.

Such as: the Auftraggeber states that the Zuschlagskriterium is “Preis”, with the price derived from the Wertungssumme of the offer, calculated from checked offer sums including unconditional discounts, effects from the Lohngleitklausel, and any Instandhaltungsangebote.

There is an option to use “Mehrere Zuschlagskriterien gemäß Formblatt Zuschlagskriterien” including the “Berücksichtigung von Werkstätten für behinderte Menschen und von Inklusionsbetrieben”, but in the provided excerpt the decisive criterion named is price.

Nebenangebote may be either excluded or permitted depending on what is ticked in the Aufforderung; where allowed, they must meet qualitative and quantitative equality and any set Mindestanforderungen, be fully described and structured by quantities and unit prices.

Offers must be in German, use the specified forms, be submitted electronically (via Vergabemarktplatz Brandenburg) or in sealed paper form by the deadline, and improperly signed or non-fristgerechte offers are excluded.

The risks and special conditions for bidders are extensive in the ZVB and related annexes.

Such as: strict compliance with the Brandenburg Vergabegesetz minimum wage regime is required; violations (Entgeltverkürzung, refusal of controls) trigger contractual penalties of 1% of the Auftragssumme per case (capped overall at 5%, max. €250,000).

There are detailed obligations on site conduct (cleanliness, waste management under Form 241 Abfall, environmental and nature protection, weekly site meetings, daily Bautagesberichte, reporting of hindrances and endangered species), and on using only qualified personnel and suitable subcontractors.

Security requirements include an Erfüllungsbürgschaft of 10% of the gross contract sum for contracts > €50,000, non-on-first-demand, and a separate Mängelansprüchesicherheit (Mängelhaftungsbürgschaft) of 5% of the gross, objectively correct Schlussrechnungssumme after acceptance for guarantees over the longer VOB/B defect periods (generally 5 or 10 years, with a Bürgschaft claim period extended to 7 years if legal limitation would be shorter).

There is a complex regime on Nachträge and § 650c BGB, requiring provision of Urkalkulation and allowing the client to provide payment or security instead of paying contested variation sums.

The client has a BauRisk project insurance in place (combined construction and liability, with Excedenten cover and Feuer-Rohbau), the premium (max 0.64% plus insurance tax on the final gross contract sum) is borne by the contractor via deduction from the final payment.

Further risks and conditions concern subcontracting, penalties, validity periods, questions, and ancillary obligations.

Such as: subcontracting requires prior written disclosure of type and scope of subcontracted services and details (name, address, Berufsgenossenschaft and membership number) and, for tasks the contractor’s business is set up to perform, explicit consent under § 4 Abs. 8 VOB/B.

The contractor must ensure that subcontractors do not re-subcontract without the client’s written consent, must impose equally stringent pay and control obligations, and may not impose less favourable conditions on them than those it has agreed with the client.

The Bindefrist for offers runs to 17.12.2026, and bidder questions should preferably be submitted via the Vergabemarktplatz by 10.11.2026; late questions may remain unanswered.

Non-compliance with competition rules (e.g. collusive arrangements) may lead to exclusion and triggers a pauschaler Schadensersatz of 15% of the gross accounting sum, unless the bidder proves lesser damage.

There is an obligation to provide and update a Freistellungsbescheinigung § 48b EStG; failing that, the client may withhold 15% from each payment and the contractor must at least name its tax office and tax number.

There is no explicit mandatory site visit mentioned in these excerpts, but the use of site plans and the duty to clarify any perceived errors in the tender documents before bidding suggests an expectation of due diligence.

Such as: the long-form Leistungsverzeichnis of the client is expressly declared “alleinverbindlich” even if the bidder used a self-made short LV; the Angebotsschreiben confirms this and confirms that any changes to the tender documents received become part of the offer.

Where “oder gleichwertig” is used for products and the bidder does not enter a product, the client’s specified product is deemed agreed.

The ZVB clarify that agreed prices are Festpreise despite later cost changes, except where Lohngleitklausel or Vergabegesetz-based adjustments apply; clauses on § 650c BGB emphasise that VOB/B does not exclude § 650c Abs. 3 BGB.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 25/10/2026

Clement
In this buyer's last 232 comparable contracts (same sector), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ALBAKON GmbH · Beelitz142017–2025
MACON BAU GmbH Magdeburg · Magdeburg112023–2025
SeWe Tief-und Rohrleitungsbau Anlagentechnik GmbH · Stendal82023
Galandi Schirmer | Architekten und Ingenieure GmbH · Berlin62022–2026
ST Gebäudetechnik GmbH Sanitär Heizung Lüftg. Elektro · Potsdam62024–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

46
2019
55
2020
38
2021
88
2022
148
2023
170
2024
130
2025
75
2026
750 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Tuesday 17 November at 10:00

Tactics

When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 232 completed awards — not a statement about this procedure.)

This procedure allows 34 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). A normal window for this market.

Foreign bidders

In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on service.bund.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via service.bund.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now