How to bid in this country: portals, deadlines, thresholds →
Media technology Tulla lecture hall
Medientechnik Tulla Hörsaal — original title
Your path to submission
- Deadline: 10 November — 9 days left. The source gives only the day, no time of day — on the portal the deadline is usually in the morning. Check the exact time there before you plan.
- The submission point is stated in the notice (link on this page).
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (3 awards, most recently July 2023) — by that rhythm the next award was due around September 2023. The last award went to multi-media systeme aktiengesellschaft.n = 3
- 45% of this buyer's awards went to companies that had already won here before (257 awards since 2018, spread over 141 companies). 55% went to new names.n = 257 awards since 2018
- The award came in at a median 99% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 80%.n = 13
- 94% of the bids received came from small and medium-sized enterprises (8 procedures with a bid mix). Sector: 62%.n = 8
- The median procedure drew just one bid (255 procedures with a bid count); 59% ended with a single bidder. Sector: median 2 bids.n = 255
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Tender documents at a glance
The essentials of the tender documents, read in seconds. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
The input text concerns a German public procurement procedure under the UVgO for the project “Medientechnik Tulla Hörsaal” at the Karlsruher Institut für Technologie (KIT). It describes the tender documents, contractual conditions and required bidder declarations from the point of view of a public client in Germany. The legal and geographic focus is the Federal Republic of Germany, but there are references to the European Union, the European Economic Area and WTO public procurement signatory states in relation to financial guarantees. The framework is explicitly German public procurement law (UVgO, GWB, LTMG, MiLoG) and German civil law (BGB), with Karlsruhe as exclusive place of jurisdiction.
The text explains, among other things, what the bidder must submit with the offer. Such as: the “Aufforderung zur Angebotsabgabe” states that the bidder must file via the German e‑procurement portal (DTVP) a Handelsregisterauszug (commercial register extract), a signed “Angebotserklärung” and an “offizielles Angebot”. In addition, the bidder must complete and sign the “Eigenerklärung zur Eignungsprüfung” (including sections on exclusion grounds under §§ 123/124 GWB, legal form, contact data, turnover and staff, minimum wage/tariff compliance under LTMG and MiLoG, liability insurance, and any subcontracting) and the LKSG‑Verpflichtungserklärung (human rights / supply chain due diligence). References are mentioned indirectly via the data protection information, which notes that personal data of employees and third parties may be processed in the context of reference information. The bidder must show turnover in the last three business years, staff numbers, and existence and coverage limits of a business liability insurance, with supporting documents to be submitted on request.
Show the full summary (7 paragraphs)
Regarding minimum qualification requirements, the “Eigenerklärung zur Eignungsprüfung” consolidates all eligibility statements. Such as: bidders must confirm that no mandatory or discretionary exclusion grounds under §§ 123, 124 GWB apply; that they comply with tax and social security obligations, have no insolvency proceedings opened, and have not committed serious professional misconduct or major performance failures on prior public contracts. They must also declare adherence to tariff and minimum wage rules (LTMG, MiLoG), including ensuring compliance by subcontractors and temporary work agencies, and accept that contractual penalties and exclusion from future tenders may result from violations. The economic/financial capacity is demonstrated via self‑declared turnover figures, comparable-service turnover, staff numbers, and confirmation of liability insurance; detailed certificates (e.g. insurance policy, tax clearance, certificates for subcontractors) can be requested by KIT during the procedure, and must then be provided within a set deadline or the offer is excluded.
The scope of the contract is defined in the Leistungsverzeichnis “Medientechnik Tulla‑Hörsaal – Gebäude 11.40” and in the general and technical preliminary notes. Such as: the contract covers supply, integration and installation of media technology components into an existing media system in the Tulla lecture hall at KIT Campus Süd, including delivery (DAP Incoterms 2010 to the KIT premises), transport on site, assembly, system integration, commissioning, documentation, training of operating personnel, and disposal of packaging and construction waste. Quantities and specific products are set out in detail line items; Leitfabrikate (reference products) and concrete device types are stipulated to ensure system compatibility, staff training continuity and spare parts availability. Bidders may offer equivalent alternative products, but must clearly indicate them in the LV at the designated positions and prove equivalence with suitable documentation (data sheets, simulations, test setups). The execution period is not given as a fixed date but described as “schnellstmöglich” after contract award, with the offer binding until 30.01.2027 and the bid submission deadline on 10.11.2026 at 11:00; questions on the tender must be submitted via DTVP by 03.11.2026.
The award criteria and weighting are described very simply. Such as: the “Aufforderung zur Angebotsabgabe” states that only offers fulfilling all tender requirements will be evaluated, and that evaluation occurs in three stages per UVgO: formal and timely receipt (§ 42 UVgO), examination of any obvious imbalance between price and performance (§ 44 UVgO), and determination of the best offer (§ 43 UVgO). For the decisive stage, the sole award criterion is “100% Preis”; thus, assuming all eligibility and technical requirements are met, the lowest compliant price wins. Nevertheless, any offer that deviates from mandatory technical specifications without allowed and proven equivalence, or that changes the tender documents (e.g. overwriting tables, formulas, headings) is excluded from any valuation.
The text sets out risks and special conditions for bidders. Such as: general conditions VOL/B and KIT’s ZVBL apply as contractual basis, along with KIT’s Ordnungs‑ und Kontrollbestimmungen and the LKSG obligations. The bidder’s own general terms are expressly excluded and their use can lead to exclusion. There are strong rules on changes: any unauthorized changes to tender documents, especially the LV, lead to exclusion; a side offer with different products is only permissible as a separate offer with proven equivalence. Subcontracting is allowed but controlled: bidders intending to use subcontractors must declare the planned partial services and subcontractors in the Eigenerklärung; each subcontractor must sign a Verpflichtungserklärung nach § 26 UVgO and, in case of “Eignungsleihe”, accepts joint and several liability with the main contractor. The ZVBL regulate penalties and termination: for corruption or serious competitive violations, KIT can withdraw from or terminate the contract and demand a contractual penalty up to 10% of the net contract price (50‑times the value of the illicit advantage or damage); KIT may also exclude the company from tenders for up to three years. For LTMG/minimum‑wage or LKSG violations, there is a specific contractual penalty and the possibility of exclusion and termination. The offer must be submitted electronically via DTVP, fully completed, in German, documented in indelible writing, and signed (the Angebotserklärung explicitly warns that an unsigned offer is deemed not submitted), and no bidder consortia (Bietergemeinschaften) are allowed despite the generic form text describing them. Liability and insurance risks include being the “Abfallerzeuger” for waste generated and bearing all costs for transport and disposal, complying with all safety and environmental rules on KIT premises, and providing adequate liability insurance coverage.
Finally, the documents contain some potential contradictions or at least apparent overlaps that must be interpreted in context. Such as: the Eigenerklärung form contains standard sections for bidder consortia (Bietergemeinschaften), but the Aufforderung zur Angebotsabgabe explicitly states that “Es werden keine Bietergemeinschaften zugelassen”; therefore, in case of conflict, the specific instruction in the invitation letter prevails, and the consortium sections are not applicable. Another example is the Nachforderungsregelung: the invitation letter explains that KIT may request missing declarations and proofs within a deadline, but notes that bidders have no right to such an opportunity; thus, bidders must treat all eligibility declarations (GWB exclusion, turnover, insurance, minimum wage, LKSG, subcontractors) as mandatory with initial bid submission. For jurisdiction, both the Angebotserklärung and ZVBL stipulate Karlsruhe (Germany) as the exclusive place of jurisdiction; this is consistent. Where varying formulations appear (e.g. “VOL/B” referenced in several places, or “Campus Süd” vs “Gebäude 11.40”), the cross‑reference list in the invitation letter (“Dokumentensatz: Aufforderung, Anlage 1–6”) and the contractual sequence in the Angebotserklärung (tender documents first, then Eigenerklärung, ZVBL, Ordnungs‑ und Kontrollbestimmungen, VOL/B, and the bidder’s offer) clarify that the KIT tender documents and the Leistungsverzeichnis take precedence over any contrary bidder stipulations.
Only the contracting authority's tender documents are binding. As of: 24/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| pro-com DATENSYSTEME GmbH | 12 | 2020–2025 |
| FEI Deutschland GmbH | 10 | 2022–2025 |
| DALCO AG · 8832 CH | 9 | 2011–2025 |
| Babcock Noell GmbH · Würzburg | 7 | 2011–2023 |
| STOE & Cie GmbH | 7 | 2011–2022 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 4 completed awards — not a statement about this procedure.)
This procedure allows 28 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Germany · Radio, TV & communications, 50 contracts went to foreign companies over the last 3 years (of 6,378 recorded awards) — mostly from Austria, Netherlands, Italy.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now