26-081830 MS and transformer system
26-081830 MS und Trafoanlage — original title
Your path to submission
- Deadline: 1 December at 09:02 — 30 days left.
- You submit on RIB meinauftrag.de — not here and not by e-mail. ↗ Free account on meinauftrag.rib.de required; submission is electronic via the platform, signature requirements are stated in the procedure details. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Two medium-voltage systems AV and SV as well as a total of 8 transformers (6x1600 kVA and 2x2000 kVA) for an energy centre, including the expansion of the rooms with tr...
Contract
Clement What the numbers say about this buyer
- 14% of this buyer's awards went to companies that had already won here before (234 awards since 2017, spread over 201 companies). That is well below the national norm (45%) — this buyer switches suppliers more often than others.n = 234 awards since 2017
- The median procedure drew 5 bids (230 procedures with a bid count); 5% ended with a single bidder. Country: median 3.1 bids.n = 230
- The award came in at a median 81% of the estimated value (100 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 86%.n = 100
- From notice to award takes a median 49 days here (7 procedures). Country: 86 days.n = 7
- Not one of the 234 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 234
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Tender documents at a glance
The essentials of the tender documents, read in seconds. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
The input text concerns an EU-wide public construction tender under the German VOB/A for the project “MS und Trafoanlage” (medium‑voltage and transformer plant) as part of the “Neubau University of Technology Nürnberg – Energie‑Logistikzentrale.” The point of view is that of a German public client (Staatliches Bauamt Erlangen‑Nürnberg, Germany), applying German procurement and contract rules (VHB Bayern, VOB/A, VOB/B) and EU regulations (including Russia‑sanctions). Other countries appear only in reference to EU/EFTA/Turkey in technical certification rules for vehicle restraint systems, but the substantive requirements are set by a German public authority in Germany.
The documents first set the procedural frame: it is an EU‑VOB/A procedure (open procedure box is shown) with electronic submission via the German platform iTWO tender / ava‑sign or alternatively in writing. The tender covers construction works (MS and transformer systems) located in Nürnberg at the UTN energy logistics centre. The Aufforderung zur Abgabe eines Angebots (Form 211 EU) lists all parts of the tender: participation conditions (212EU), special contract conditions (214.H), the list of required documents (216), data processing (244), and online tendering rules (2492). The binding period ends on 30.01.2027, with the expected start around 01.12.2026; execution and completion dates are specified in the Besondere Vertragsbedingungen, including a key milestone “Inbetriebnahme Stromversorgung Energiezentrale bis zum 15.08.2028” and an overall completion date “06.07.2029” with contractual start “01.03.2027.”
Show the full summary (7 paragraphs)
Regarding what the bidder must submit and minimum qualification: the text systematically lists required forms and proofs. With the offer, bidders must submit, such as, the Angebotsschreiben (213.H), the priced Leistungsverzeichnis, the Instandhaltungsvertrag (Wartung_2018_Vertrag_E.pdf), Form 127 (Erklärung Bezug Russland), Form 221 or 222 (price calculation), any Lohngleitklausel‑offer (224), the Nachunternehmerverzeichnis (233) if subcontractors are used, the declaration for bidder consortium (234) if applicable, and the Verzeichnis der Leistungen/Kapazitäten anderer Unternehmen (235) if capacities of other firms are used. They must also provide the declarations on wood products (248), regional plants (2481) and avoidance of child labour products (2491), plus the technical declaration on vehicle restraint systems (2292.StB) where relevant. As to qualification, non‑prequalified companies submit the Eigenerklärung zur Eignung (124) or a European Single Procurement Document (EEE), including turnover in the last three years, reference projects in the last five years, confirmation of sufficient workforce, registry entries (Handelsregister, Handwerksrolle, IHK), absence of insolvency and exclusion grounds (§ 6e EU VOB/A), and proper tax/social security payments. If the bid comes into closer consideration, they must provide, such as, reference certificates (Form 444 style), detailed workforce statistics, Gewerbeanmeldung/Handelsregister/Handwerkskarte or IHK certificate, tax office and social fund clearances, Freistellungsbescheinigung (§ 48b EStG), and a qualified BG (Berufsgenossenschaft) clearance; similar proofs apply to any named other companies whose capacities are used.
On scope, quantities, place and period, the text identifies the contract as “LV: Mittelspannung und Trafo” for the “Energie‑Logistikzentrale” at UTN Nürnberg. The detailed quantities are contained in the Leistungsverzeichnis (not fully reproduced here) with standardized units (such as cm, m, m², m³, kWh, Stück, Wochen, Stunden etc.) and combinational units (m x Tag, Stück x Stunde, etc.) for works, services and maintenance. The contract includes not only execution of the MS and transformer installation but also, such as, preparation of workshop and installation drawings, plan coordination based on AG‑supplied PDFs/DWGs/3D model (9 floor plans, 5 schematics, 3D‑model), participation in weekly site meetings, continuous presence of a qualified German‑speaking site supervisor, digital document handling via the web‑based exchange platform, and performance of an associated maintenance/instandhaltung contract with yearly remuneration stated separately in the Angebotsschreiben. Execution periods and contractual milestones are governed by 214.H and further specified in the LV: a Baufristenplan must be developed by the contractor based on the AG’s Bauablaufplan, kept updated, and submitted via the exchange platform; the “Beschleunigungsregelung” is a specific award criterion, requiring bidders to commit a binding end‑date (not later than the one in the Besondere Vertragsbedingungen) and submit a bar chart schedule with defined activities, intermediate and final deadlines.
On award criteria and weighting, the Aufforderung zur Angebotsabgabe (211 EU) states that the main award criterion is price: the Zuschlagskriterium “Preis” is evaluated via the “Wertungssumme” of the re‑calculated offer, including, such as, discounts, lohngleitklausel reimbursement amounts, and maintenance offers. Additionally, the documentation refers to “Mehrere Zuschlagskriterien gemäß Formblatt 227.H – Gewichtung der Zuschlagskriterien,” which means that besides price there are other weighted criteria, notably the Beschleunigungsregelung: bidders must submit the binding Bauende and Bauzeitenplan as “Unterlagen zu den Zuschlagskriterien” on a separate annex (as described in Form 216). Thus, the award is based on a combination of price and qualitative/time‑related criteria, with the exact weighting detailed in the referenced Formblatt 227.H (not fully quoted here).
Concerning risks and special conditions (penalties, guarantees, subcontracting, validity, questions, site visit), the Besondere Vertragsbedingungen (214.H) and LV clauses define several contractual risks. There are contractual penalties: for each day of delay against contractual individual deadlines or overall completion, the contractor owes a daily Vertragsstrafe, calculated as a percentage of the net contract sum; total penalties are capped at a given percentage of the contract sum, with aggregation rules between individual and overall delays. Security: clauses provide that security for performance and defects may either be waived or required depending on contract sum (threshold 250,000 € net); if required, specific standard guarantee forms (performance, defects, advance/instalment payment guarantees) of the client must be used. Subcontracting is tightly controlled: all subcontract agreements must be under VOB/B; violation allows termination for cause and may lead to loss of prequalification; awarding contract parts to “Nach‑Nachunternehmer” (sub‑subcontractors) is in principle not permitted. On procedural risks, the bidder is bound by the offer until the end of the binding period (30.01.2027); any competition‑restricting arrangements trigger a contractual liquidated damages clause of 5% of the contract sum. Questions and clarifications must be raised “unverzüglich vor Angebotsabgabe” to the client if the bidder finds ambiguities or errors. Site visits by third parties require prior AG consent; overnight stays on the entire construction site are strictly forbidden; advertising on site is generally prohibited unless AG approves; electronic data exchange and GAEB/DA XML rules govern offer and billing, with the written version prevailing in case of discrepancies.
As to contradictions or corrections within the documents, the text itself sets precedence rules rather than explicit conflicting statements. For example, it explicitly states that, such as, the long version of the Leistungsverzeichnis provided by the client is solely binding (self‑made short versions of the LV are allowed only as working aids), and that in case of differences between data‑exchange files and the written accounting documents, the written version prevails, with differences to be marked by the contractor. Similarly, if multiple forms refer to advertising on site, the specific clause in the LV (“Auf der Baustelle wird Firmenwerbung nicht zugestimmt … Ausnahmen bedürfen schriftlicher Genehmigung”) refines the general rule in 214.H (“Werbung auf der Baustelle ist nur nach vorheriger Zustimmung des Auftraggebers zulässig”); both are consistent and the stricter, more detailed LV rule applies. There is no direct contradiction on key topics like eligibility, submission form, or deadlines; where several documents touch the same subject (e.g. subcontracting, data exchange, penalties), the LV and Besondere Vertragsbedingungen clauses are presented as “Fortsetzung siehe Leistungsbeschreibung,” making clear that the project‑specific provisions in the LV supplement and concretize the standard 214.H text.
Only the contracting authority's tender documents are binding. As of: 29/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| FB Hoch- und Tiefbau GmbH · Cadolzburg | 6 | 2016–2022 |
| SEB Baugesellschaft mbH · Kromsdorf | 5 | 2019–2020 |
| Maier & Georgs Nachf. GmbH · Nürnberg | 4 | 2012–2018 |
| Georg u. Fritz Knörr GmbH & Co. KG · Heilsbronn | 4 | 2012–2019 |
| Güther GmbH · Feuchtwangen | 4 | 2017–2018 |
Tactics
This procedure allows 34 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). A normal window for this market.
Foreign bidders
In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now