3230_EU_031226 Carcass work Special civil engineering
3230_EU_031226 Rohbauarbeiten Spezialtiefbau — original title
Your path to submission
- Deadline: 3 December at 10:00 — 32 days left.
- You submit on RIB meinauftrag.de — not here and not by e-mail. ↗ Free account on meinauftrag.rib.de required; submission is electronic via the platform, signature requirements are stated in the procedure details. Sort out account and signature first — not on submission day.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Carcass work Special civil engineering Earthworks Drainage work Water conservation Waterproofing/heat insulation work Wall work Interior walls House/roof entries, inlay work Lightning...
Contract
Tender documents at a glance
The essentials of the tender documents, read in seconds. For your bid, the original documents count.
Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.
The input text concerns an EU‑offenes Verfahren for “Rohbauarbeiten Spezialtiefbau” (shell construction and special civil engineering works) for the Neubau Hallenbad Zuffenhausen in Stuttgart, Germany, conducted by the Vergabestelle Landeshauptstadt Stuttgart. It is based on German public procurement and construction contract law (VOB/A, VOB/B) and references German regulations such as the Gesetz zur Ordnung des Handwerks, Wettbewerbsregistergesetz and Landestariftreuegesetz Baden‑Württemberg. The perspective throughout is that of a German public contracting authority applying EU procurement rules to select a contractor for significant construction works.
The documents specify in detail what the bidder must submit and how the offer has to be prepared. For example, bidders must use the official VHB formblätter, in particular the Angebotsschreiben 213 EU, and submit the priced Leistungsverzeichnis. Depending on the bidder’s situation, additional standard forms are required: Formblatt 233 for Nachunternehmerleistungen, 234 for Bieter-/Arbeitsgemeinschaften, 235 for Leistungen/Kapazitäten anderer Unternehmen, 248 for Holzprodukte, and ggf. das Vertragsformular Instandhaltung. Non‑präqualifizierte companies must submit the Eigenerklärung zur Eignung (Formblatt 124) or a Einheitliche Europäische Eigenerklärung; präqualifizierte bidders indicate their PQ‑Nummer. On request, further documents must be supplied, such as at least three Referenznachweise der letzten fünf Jahre, Erklärung zur Beschäftigtenzahl, Gewerbeanmeldung/Handwerkskarte/HR‑Auszug, various Unbedenklichkeitsbescheinigungen (Finanzamt, Sozialkasse, Berufsgenossenschaft), Freistellungsbescheinigung § 48b EStG, Angaben zur Preisermittlung (Formblätter 221/222), Aufgliederung der Einheitspreise (223) und Urkalkulation. The minimum qualification requirements include evidence of comparable construction turnover in the last three business years, average workforce numbers, appropriate handwerksrechtliche Eintragung (e.g. Handwerkskarte), specific technical qualifications (such as TRGS‑519 and EN 1090 welding classes) and a special Geothermie‑Haftpflichtversicherung with at least 8 Mio EUR per loss and 16 Mio EUR per insurance year; however, the general yearly turnover has no concrete minimum threshold, only an explanation duty.
Show the full summary (6 paragraphs)
Regarding the scope of the contract, the text describes an all‑inclusive package of shell construction and special civil engineering works for the new pool, including such as earthworks, dewatering, construction water management, waterproofing and thermal insulation, masonry for interior walls, house and roof penetrations, embedded works, lightning protection and earthing systems. The place of performance is Stuttgart‑Zuffenhausen (PLZ 70437), with specific site conditions: adjacent sport hall in operation, school traffic, strict safety and logistics constraints, Baustelleneinrichtungsplan, Baustrom/Bauwasseranschlüsse and limited storage areas. Quantities and positions are detailed in the LV “Rohbau und Spezialtiefbauarbeiten” (e.g. Baustelleneinrichtung, Lagerflächen, Transport). The time frame is governed by Besondere Vertragsbedingungen (Formblatt 214) and a Bauzeitenplan: beginning within a defined calendar week or within 12 working days after Aufforderung, and completion deadlines such as “Fertigstellung Decke über UG bis spätestens KW 46 2027” and overall finishing by June/July 2028; these dates are Vertragsfristen with contractual penalties attached.
Award criteria and weighting are also specified. The main Zuschlagskriterium is Preis, determined from the “Wertungssumme” after recalculation of the Angebotsendsumme including price reductions, effects from Lohngleitklausel (Formblatt 224) and any Instandhaltungsangebote. Variants (Nebenangebote) may generally be regulated in the Teilnahmebedingungen, but for this procedure they are marked as “nicht zugelassen” in the Aufforderung zur Angebotsabgabe, so only Hauptangebote count; where Nebenangebote would be allowed, they must fully describe alternative performance, meet minimum requirements and be broken down in quantities and unit prices. As a special social criterion, offers from recognised Werkstätten für Behinderte receive a 15 % bonus in the Wertungssumme; if such an offer is at least as economical as another, it gets the award. The contracting authority reserves the right in a Verhandlungsverfahren to award on the basis of first offers without negotiations, although here the procedure is declared as an offenes Verfahren.
There are numerous risks and special conditions for bidders, such as contractual penalties, guarantees and subcontracting rules. For example, delays beyond the contractual single milestones or completion dates incur a Vertragsstrafe per working day, capped at 5 % of the net Schlussabrechnungssumme. Security for performance is required if the net contract sum is at least 250,000 EUR: 5 % of the contract value (including VAT, without change orders) for Leistungserfüllung and 3 % of the Abschlagszahlungen at Abnahme for Mängelansprüche, usually given via self‑schuldnerische Bürgschaft with the official forms “Vertragserfüllungsbürgschaft” (421) and “Mängelansprüchebürgschaft” (422). Subcontracting and Eignungsleihe are strictly controlled: the bidder must list all OZ concerned in Formblatt 233/235, provide Verpflichtungserklärungen anderer Unternehmen (Formblatt 236) including joint liability for performance where capacities are borrowed, and ensure consistency of Nachunternehmersummen with the Preisermittlung forms. Further obligations include such as daily Bautagesberichte, weekly 14‑day Arbeitsvorausschau, attendance at site meetings with decision‑competent representatives, compliance with the Landestariftreue‑ und Mindestlohngesetz and AEntG (with related contractual penalties up to 5 % of contract value), Russian sanctions declarations, prohibition or restriction of advertising on site, and handling of “Just in Time” material deliveries under tight logistics rules. The offer must be submitted electronically in German via www.meinauftrag.rib.de by 03.12.2026 10:00, remains binding for 77 days, and bidder questions must be submitted by 23.11.2026 10:00, at least three working days before the end of the information period (§ 12a EU VOB/A).
Finally, the documents address contradictions or corrections and clarify which statements prevail. For instance, bidders are instructed that any perceived inconsistencies or errors in the tender documents must be raised “unverzüglich” via a Bieterfrage before submission; “klarstellende Hinweise” in a Begleitschreiben zum Angebot may be treated as unauthorised changes to the tender documents and lead to exclusion under § 16 VOB/A and § 13 EU VOB/A. The Langfassung des Leistungsverzeichnisses issued by the client is expressly designated as “alleinverbindlich,” even if bidders work with their own short versions. Where Besondere Vertragsbedingungen and the TED notice both mention securities, the more specific wording in Formblatt 214 (performance and defects securities with defined percentages and use of standard Bürgschaftsformblätter) governs. In relation to Nebenangebote, although the Teilnahmebedingungen EU describe how they must be structured, the Aufforderung zur Angebotsabgabe explicitly states “Nebenangebote sind nicht zugelassen”; this later, procedure‑specific statement prevails, so no variants may be offered. As such, bidders must orient themselves on the combination of the EU‑Bekanntmachung, the Aufforderung 211 EU, Formblatt 216 and the LV; where doubt remains, only clarifications formally issued by the Vergabestelle via the electronic platform before the submission deadline are binding.
Only the contracting authority's tender documents are binding. As of: 25/10/2026
Eligibility analysis from the tender documents
Tender documents — direct download
Tactics
This procedure allows 42 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.