Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

26A00122 HUL0393232601 Platform Lift

26A00122 HUL0393232601 Plattformlift — original title

DEGermany · LübeckBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 9 November at 09:40 — 8 days left.
  2. You submit on RIB meinauftrag.de — not here and not by e-mail. ↗ Free account on meinauftrag.rib.de required; submission is electronic via the platform, signature requirements are stated in the procedure details. Sort out account and signature first — not on submission day.
  3. Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published19 Oct 2026
ProcedureOpen procedure
Contract period11 Jan 2027 → 22 Jan 2027
Place of performance24937 Flensburg Mürwik

Clement What the numbers say about this buyer

  • 19% of this buyer's awards went to companies that had already won here before (94 awards since 2018, spread over 76 companies). That is well below the national norm (45%) — this buyer switches suppliers more often than others.n = 94 awards since 2018
  • The award came in at a median 45% of the estimated value (8 awards with both estimate and value) — pricing at the estimate is usually too high here. Country: 86%.n = 8
  • The median procedure drew 2 bids (87 procedures with a bid count); 44% ended with a single bidder. Country: median 3.1 bids.n = 87
  • Not one of the 94 awards with a known winner country has gone to a foreign company so far. National average: 1%.n = 94
  • From notice to award takes a median 59 days here (5 procedures). Country: 86 days.n = 5

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Tender documents at a glance

The essentials of the tender documents, read in seconds. For your bid, the original documents count.

Powered by eBriefing – EU language technology. Friedrich is an independent service, not an EU offering.

The input text contains the national (VOB/A Abschnitt 1) tender documents for a construction contract in Germany, specifically for the Bundesrepublik Deutschland (vertreten durch Bundesministerium für Verteidigung) and abgewickelt durch die Gebäudemanagement Schleswig-Holstein AöR (GM.SH). It concerns a public procurement procedure for the installation of a barrier-free platform lift at the Soldatenheim Flensburg‑Mürwik. The country point of view is clearly German: the documents are based on German procurement and construction law (VOB/A, VOB/B, PQ-Verzeichnis, EStG §48b), reference German institutions (Bundeswehr, Bundesministerium, GM.SH, PQ-Verein) and use German forms such as VHB Bund. NATO and “Gaststreitkräfte” are mentioned only as context in standard clauses, but the main applicable regime is German national public procurement for construction works.

The scope of the contract is described in the Bekanntmachung (Formblatt 121) and the Leistungsbeschreibung/LV: the task is to make access to the Soldatenheim Flensburg-Mürwik (OASE) barrier-free by overcoming a height difference of 3.5 m over a distance of 22.5 m with a platform lift, including passing over an existing planted area (Beet) between staircase and building. As such, the contract is for “Ausführung von Bauleistungen” at postal code 24937 Flensburg-Mürwik. The key time frames are: Ausführungsbeginn am 22.01.2027 und Fertigstellung am 11.01.2027 (klar als vertragliche Fristen in den Besonderen Vertragsbedingungen – Formblatt 214), and an Angebotsfrist bis 09.12.2026, 09:40 Uhr, with Bindefrist (bid validity) bis 09.11.2026. The detailed quantitative scope is compressed into a single LV-Position “Einbau eines behindertengerechten Plattformlift”, with the full Langtext-LV as the sole binding basis; bidders must recognize the Langfassung as alleinverbindlich and treat GAEB data as Arbeitsmittel.

Show the full summary (6 paragraphs)

Regarding what the bidder must submit and minimum qualification, the Aufforderung zur Angebotsabgabe (Formblatt 211) and Verzeichnis der im Vergabeverfahren vorzulegenden Unterlagen (Formblatt 216) specify: with the offer, bidders must submit the Angebotsschreiben (Formblatt 213) and the completed Leistungsverzeichnis with prices. Depending on the bidder’s situation, they may also have to submit form 233 (Verzeichnis der Nachunternehmerleistungen) if parts are subcontracted, form 234 (Erklärung Bieter-/Arbeitsgemeinschaft) if bidding as a JV, form 235 (Leistungen/Kapazitäten anderer Unternehmen) if they rely on other firms, and the Instandhaltungs-Vertragsformular plus ggf. Formblatt 224 (Lohngleitklausel) and 248 (Holzprodukte), when applicable. For non‑präqualifizierte Unternehmen, the Eigenerklärung zur Eignung (Formblatt 124) is required as preliminary evidence of suitability, including turnover over the last three financial years for comparable works and the declaration of comparable projects in the last five calendar years. If the offer comes into the “engere Wahl”, the bidder must—on separate request—provide reference certificates (three references with detailed technical and quantitative information), workforce statistics, trade/Chamber registrations, insolvency plan confirmation (if relevant), tax and Sozialkasse “Unbedenklichkeitsbescheinigungen”, Berufsgenossenschaft certificate, Freistellungsbescheinigung nach § 48b EStG and, as applicable, product data sheets and proof of equality for certified wood products (PEFC/FSC). Präqualifizierte Unternehmen instead indicate their PQ-Nummer; in all cases, Eignung is assessed according to § 6a VOB/A, and missing suitability documents required with the bid (except prices) may be nachgefordert according to the Bekanntmachung.

The award criteria and weighting are defined as price-based. As indicated in Formblatt 211 (Ziffer 7) and the Bekanntmachung, the Zuschlagskriterium is “Preis”; the Wertungssumme is calculated from the checked offer sum, including consideration of unconditional discounts, any Erstattungsbeträge from a Lohngleitklausel, and prices for any Instandhaltungsangebote. There is a special treatment for offers from Werkstätten für Behinderte: such offers receive a 15% bonus on the Wertungssumme, and if a workshop’s offer is equally economical as another, the award goes to the workshop. The bidder must provide proof of being a Werkstatt für Behinderte or Blindenwerkstätte with the offer when claiming this bonus. Nebenangebote are allowed (see Bekanntmachung j), but they must meet all Mindestanforderungen, be qualitatively and quantitatively gleichwertig to the base specification, be fully described, and be broken down by quantities and unit prices; otherwise they are excluded from the evaluation.

The documents set out several risks and special conditions. Contractual penalties (Vertragsstrafen) under § 11 VOB/B are provided for in the Besondere Vertragsbedingungen (Formblatt 214): for each working day of delay beyond contractually fixed milestones or completion date, a daily contractual penalty is due, calculated as a percentage of the net contract sum (exact percentage to be ticked by the Auftraggeber), and capped at an overall percentage of this sum. All delay penalties for intermediate deadlines are offset against any penalty for delayed completion. Security: depending on the contract size, there may be no security or, if the net order sum is at least 250,000 €, a performance bond of 5% of the (gross, without supplements) contract value and a defect-security of 3% of the sum of instalments at acceptance; where security is required, prescribed GM.SH forms must be used for performance, defect and advance-payment guarantees. The bidder must also accept a 15% lump‑sum damage payment clause if proven to have entered into an anti‑competitive arrangement, unless a lower damage is shown. Subcontracting is regulated: any use of Nachunternehmer must be declared with scope in the offer and named on request; special security and commitment forms (126, 236) can be demanded later. For “Heißarbeiten” (hot works), the contractor must obtain a formal “Erlaubnisschein” before each such activity, both for construction and later maintenance. Insurance requirements appear in the AMEV Aufzug-Service contract: the contractor must hold liability insurance covering defined levels for Sach-, Vermögens- and Personenschäden. Special procedural risks include the strict prohibition of Mischkalkulationen (redistributing unit prices across positions), which leads to exclusion, and the insistence on documented, proper signatures or electronic seals; if the bidder is not recognizable in a text-form e-bid or required signatures/seals are missing, the offer is excluded.

As to contradictions or corrections within the documents, the text is internally consistent on key points but provides explicit rules on precedence and clarifications. For instance, although GAEB DA-XML data and other electronic files are exchanged, Formblatt 244 makes clear that, unless exchanged via the e‑Vergabe platform as binding bid data, they count only as Arbeitsmittel; in case of discrepancies between electronic exchange files and the written version of the tender or accounting documents, the written version prevails. Similarly, the Teilnahmebedingungen and Angebotsschreiben reiterate that the Langfassung des Leistungsverzeichnisses prepared by the client is alleinverbindlich; any self-made copies or short versions are secondary. Where both the Bekanntmachung and Formblatt 211 address Nachforderung, they align: all documents required with the bid (except prices) may be requested later, and “Alle Unterlagen ... mit Ausnahme fehlender Preisangaben” may be nachgefordert. The apparent dual mention of allowed submission formats (both electronic and written) is resolved by a specific clause in the Bekanntmachung and in the “Wichtige Informationen” sheet: for this open procedure, offers must be submitted exclusively electronically via e‑Vergabe; the written submission rules are template text but are overridden by the explicit statement “Abgabe der Angebote ausschließlich elektronisch über die e‑Vergabe”. In practice, where generic VHB template options seem to conflict, the project-specific ticks and notes (especially in 121, 211, 216, 214, 244) control, and these should be treated as the binding statements for this procedure.

Add your company details — we'll show whether you meet turnover, insurance and reference requirements →

Only the contracting authority's tender documents are binding. As of: 24/10/2026

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Prequalify once (PQ register) instead of collecting certificates for every bid — worth it from a few offers per year.

Eligibility analysis from the tender documents

Tender documents — direct download

⤓
Annex
Specifications and annexes at the buyer — usually viewable without registration

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ANWIKAR CONSULTANTS GmbH · Würzburg42025
Ingenieurgesellschaft Nordwest mbH42018–2026
Motorola Solutions Germany GmbH · Idstein32014–2018
Steinmetz Briefumschläge GmbH & Co. KG · Schenefeld/Krs. Pinneberg32012–2020
Schweitzer Fachinformationen oHG · München32026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.
·
Deadline — Monday 9 November at 09:40

Tactics

This procedure allows 21 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). Much tighter than usual: the first week counts.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Germany, 6,022 contracts went to foreign companies over the last 3 years (of 725,088 recorded awards) — mostly from Austria, Poland, Italy.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on RIB meinauftrag.de. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via RIB meinauftrag.de before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now