Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Design and construction of lead slag S/S pre-treatment line at Vaivara Hazardous Waste Management Centre (AS ALARA)

Vaivara ohtlike jäätmete käitluskeskuse pliiräbu S/S eelkäitlusliini projekteerimine ja ehitamine (AS ALARA) — original title

EEEstonia · TallinnBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 23 November at 11:00 — 22 days left.
  2. You submit on Riigihangete register — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The aim of the procurement is to establish a lead slag stabilisation/solidation pre-treatment line at Vaivara Hazardous Waste Management Centre as a design and construction work. The work includes designing a complete handling solution at the stage of the work project, supplying, building, installing, connecting, adjusting and bringing to use the necessary equipment and materials. The treatment line shall be able to handle approximately 3100 tonnes/year of lead slag with waste code 10 04 01*. The work is expected to take the form of periodic work cycles or campaigns. The main capacity of this stage does not include the construction of a prewash unit for lead slag; however, the solution must take into account the possibility of connecting a prospective pre-wash station and a future ash treatment line. / Grounds for exclusion and selection criteria: See the tender specifications

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated value€525,000
Published27 Oct 2026
ProcedureOpen procedure

Type of service

45 · Construction work
CPV 45222100

Clement What the numbers say about this buyer

  • 8% of the bids received came from other countries (1,610 procedures with a bid mix) — all bidders, not just the winners. Sector: 43%.n = 1,610
  • 57% of this buyer's awards went to companies that had already won here before (1,648 awards since 2017, spread over 690 companies). 43% went to new names.n = 1,648 awards since 2017
  • The median procedure drew 4 bids (1,648 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 1,648
  • 14% of awards went to companies from abroad (1,648 awards with a known winner country). Sector average: 5%.n = 1,648
  • 96% of the bids received came from small and medium-sized enterprises (1,610 procedures with a bid mix). Sector: 97%.n = 1,610

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Tartu Ülikool342024–2026
Interlex OÜ192024–2026
MOBIRE EESTI AS182024–2026
Tallinna Ülikool182024–2026
Aktsiaselts Kaupmees & Ko162024–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

14
2024
18
2025
6
2026
38 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.
·
Deadline — Monday 23 November at 11:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 573 completed awards — not a statement about this procedure.)

This procedure allows 27 days between publication and deadline — typical in this country is 31 (median of 717 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Estonia · Construction work, 26 contracts went to foreign companies over the last 3 years (of 783 recorded awards) — mostly from Finland, France, Sweden.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on Riigihangete register. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via Riigihangete register before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now