How to bid in this country: portals, deadlines, thresholds →
Renovation works of the community swimming pool in Isili
Lavori di ristrutturazione della piscina comunitaria in isili — original title
Your path to submission
- Deadline: 19 November at 10:00 — 18 days left.
- The submission point is stated in the notice (link on this page).
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (IT).
Show original description (IT)
Lotti: RISTRUTTURAZIONE PISCINA COMUNITARIA
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew just one bid (41 procedures with a bid count); 90% ended with a single bidder. Sector: median 7 bids.n = 41
- 7% of this buyer's awards went to companies that had already won here before (56 awards since 2023, spread over 51 companies). That is well below the sector norm (22%) — this buyer switches suppliers more often than others.n = 56 awards since 2023
- Not one of the 56 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 56
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| MP costruzioni srl | 2 | 2025 |
| SED+ | 2 | 2025–2026 |
| Impresa costruzioni e manutenzioni Duccio Carta | 2 | 2026 |
| ANDREA FIGUS | 2 | 2025 |
| FLORIS LORENZO | 1 | 2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 4,210 completed awards — not a statement about this procedure.)
This procedure allows 36 days between publication and deadline — typical in this country is 34 (median of 3,981 procedures). A normal window for this market.
Foreign bidders
In Italy · Construction work, 31 contracts went to foreign companies over the last 3 years (of 28,608 recorded awards) — mostly from Germany, France, Luxembourg.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now