Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Remont dróg w Jabłonce i w Orawce.

PLPoland · JabłonkaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 17 November at 09:00 — 16 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the contract includes the task: ‘Renovation of roads in Jabłonka and Orawka’ in accordance with the requirements set out in the tender specifications, and in accordance with the art of construction and technical knowledge, applicable law, in particular technical and construction regulations, industry standards and PN. 2. Scope of works, activities necessary for the proper performance of the subject of the contract referred to in para. 1, shall include in particular: - reinforcement of the substructure - completion of the substructure 3. Nomenclature of the Common Public Procurement Vocabulary (CPV): 45233120-6 Road construction works. 45233140-2 Road works 45111200-0 Site preparation works for construction and earthworks 4. A detailed description of the subject of the contract is attached Annex 10 Technical specifications for the execution and acceptance of construction…

Show full description

… works (STWiOR). Annex 8, Measurement. 5. Required warranty period: Required warranty period for the construction works carried out and the materials used - mi-nimum 36 months - maximum 60 months from the date of final acceptance of the works The contracting authority informs that the length of the guarantee is a criterion for selecting the most advantageous tender with a weighting of 40%. The contractor who proposes the longest warranty period but not longer than 60 months will receive a maximum of 40 points, while the contractor who proposes the required warranty period (36 months) will receive 0 points. 6. The Ordering Party does not allow different warranty and guarantee periods (the warranty and guarantee period is to be the same). Warranty and quality guarantee periods are a criterion for the evaluation of tenders 7. The contracting authority shall not provide for the award of the contracts referred to in Article 214(1)(b) CTMR. Point 1(7) and (8) of the Public Procurement Law

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published30 Oct 2026

Type of service

45 · Construction work
CPV 45233120-6 · 45233140-2

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (137 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to KKD BUDOWNICTWO KRZYSZTOF KACZMARCZYK.n = 137
  • 59% of this buyer's awards went to companies that had already won here before (344 awards since 2018, spread over 139 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 344 awards since 2018
  • The median procedure drew 3 bids (31 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 31
  • Across 3 procedures with structured selection criteria, this buyer most often required: Equipment, plant and technical facilities (3 of 3), References: services (2 of 3), Professional register enrolment (2 of 3).n = 3
  • Not one of the 344 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 344

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
FIRMA USŁUGOWA HANDLOWA I PRODUKCYJNA „PNIACZEK” ROBERT PNIACZEK,272021–2026
DROGBUD SOBANIAK SP. Z O.O.122021–2026
Maciej Sikora112021–2026
FPHU HOLL-BUD, EXPORT-IMPORT, EMIL HOLLA102021–2023
Firma STM Usługi Transportowo-Sprzętowe92021–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

17
2021
22
2022
40
2023
30
2024
26
2025
42
2026
177 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Tuesday 17 November at 09:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 18 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now