Construction of Wegnera Street with a link to Wróblewski and Janowiecka Streets in Wągrowiec
Budowa ulicy Wegnera wraz z łącznikiem do ulicy Wróblewskiego i Janowieckiej w Wągrowcu — original title
Your path to submission
- Deadline: 16 November at 08:00 — 15 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the execution of construction works consisting in the construction of Wegnera Street with a link to Wróblewskiego and Janowiecka Streets in Wągrowiec, along with industry works, removal of collisions with existing technical infrastructure, execution of complete road markings, development, approval and introduction of a new permanent traffic organization and execution of works improving the safety of pedestrians at the crossing located at ul. ks. W. Wróblewski 1c. 2. The scope of works includes in particular: 1) preparatory and surveying works, including taking over and securing the construction site, demarcating facilities, checking the course of existing equipment and making the necessary open-pits and inspection trenches; 2) demolition and earthmoving works, including demolition of conflicting surfaces and landscaping elements, removal of humus,…
Show full description
… engraving, execution of excavations and embankments, preparation and compaction of the substrate and export and management of demolition materials; 3) construction and surface of carriageways, inclusions in existing roads, intersections, including elevated intersections, individual and public exits, parking spaces, stands for people with disabilities, curbs, resistors, edging and edge sewage - in accordance with the final design documentation; 4) construction or reconstruction of pedestrian roads, bicycle roads and pedestrian-bicycle routes, along with curb lowers, ramps, warning and directional surfaces and solutions ensuring accessibility for people with special needs; 5) execution of road drainage, including rainwater drainage, ducts and sewers, street drains, wells, capstones, integration into the existing network, earth and restoration works and required tests and examinations; 6) performance of street lighting with foundations, poles, booms, luminaires, cables, casing pipes, power supply, grounding, security and accessories, as well as performance of required electrical and photometric measurements; 7) removal of all collisions of the planned works with the existing underground and above-ground infrastructure and elements of land development, to the extent resulting from the documentation, conditions of gestors and collisions that can be determined when exercising due diligence; depending on the needs: protection, height adjustment, conversion, gearing or replacement of equipment; 8. complete vertical and horizontal markings and road safety devices, in accordance with the new approved design of the permanent traffic organization, including the installation of signs, plates, supporting structures, foundations, BRD devices and the dismantling or removal of outdated markings; 9) execution of all target horizontal markings within the investment in thick-layer technology, including lines, symbols, areas excluded from traffic, marking of parking spaces and pedestrian crossings; the materials used must ensure the required visibility, retro-reflectiveness, durability and anti-slip performance in accordance with regulations, approved design and STWiORB; 10) renewal and execution of marking of a horizontal pedestrian crossing at ul. ks. W. Wróblewskiego 1c, in thick-layer technology, with substrate preparation and removal of outdated marking; the final location, geometry and marking of the gangway shall correspond to the new approved design of the permanent traffic organisation; 11) development of a new project for the permanent organization of traffic for the entire range of investments, including ul. Wegnera, connector to ul. Janowiecka and ul. Wróblewski, obtaining the required opinions and approvals, introducing the approved organization of traffic in the field and providing the Ordering Party with documents confirming its introduction; 12) execution of greenery, sparkling, grass sowing, planting and assembly of elements of small architecture - to the extent provided for in the design documentation; 13) height adjustment
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (46 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to ARROW GROUP SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.n = 46
- The median procedure drew just one bid (13 procedures with a bid count); 92% ended with a single bidder. Sector: median 5 bids.n = 13
- 44% of this buyer's awards went to companies that had already won here before (125 awards since 2015, spread over 61 companies). 56% went to new names.n = 125 awards since 2015
- 1% of awards went to companies from abroad (125 awards with a known winner country). Sector average: 0%.n = 125
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji Spółka z o.o. | 8 | 2022–2025 |
| Przedsiębiorstwo Budowlano – Drogowe Szymon Włodarczyk | 8 | 2021–2024 |
| PHU Kulinaria Ewa Marcinkowska | 6 | 2022–2025 |
| REMONDIS SANITECH POZNAŃ Spółka z ograniczoną odpowiedzialnością | 5 | 2021–2025 |
| Poczta Polska S.A. | 5 | 2022–2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.