How to bid in this country: portals, deadlines, thresholds →
Insulation of the walls of room No. 30 in the I LO didactic building in Rawicz.
Docieplenie ścian sali nr 30 w budynku dydaktycznym I LO w Rawiczu. — original title
Your path to submission
- Deadline: 13 November at 09:00 — 12 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is the execution of works related to the insulation of room No. 30, located in the attic of the building of the 1st High School in Rawicz at ul. Wały J. Dąbrowskiego 29. The scope of work includes the implementation of moisture insulation made of polyethylene film and thermal insulation made of mineral wool on the surface of 136.08 m2, along with the arrangement of vapour-permeable roof film. It is also planned to perform the necessary wooden works and install OSB panels under the roof window, as well as prepare the substrate and insulate the walls with mineral wool 15 cm thick on an area of 87.67 m2, along with the construction of a reinforcement layer of mesh. The task also includes securing the floors for the duration of the works and transporting materials to the attic. A detailed description of the subject-matter of the contract is contained in: 1) Draft…
Show full description
… agreement according to Annex No. 6 to the Terms of Reference, 2) Cost estimates according to Annex No. 7 to the Terms of Reference,
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (75 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to "RAWBUD" - Rawicz spółką z ograniczoną odpowiedzialnością.n = 75
- 60% of this buyer's awards went to companies that had already won here before (291 awards since 2021, spread over 113 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 291 awards since 2021
- The median procedure drew 2 bids (14 procedures with a bid count); 43% ended with a single bidder. Sector: median 5 bids.n = 14
- 1% of awards went to companies from abroad (291 awards with a known winner country). Sector average: 0%.n = 291
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Paweł Kaczan Zakład Handlu i Usług Kama | 32 | 2022–2026 |
| Spółdzielnia Mleczarska Mlekovita | 17 | 2023–2026 |
| JOHN PAWEŁ - P. P. H. U. ,, JOHN '' | 12 | 2022–2026 |
| "SKM DRÓG SP. Z O.O. " | 11 | 2022–2026 |
| PPH Piekarnia-CukierniaHUBCIO | 7 | 2022–2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now