Execution of construction works for the investment project entitled ‘Renovation of the building of the Nursing and Educational Facility ‘DOM’ at ul. Nowobielańska 100 in Skierniewice’

Wykonanie robót budowlanych dla zadania inwestycyjnego pn. „Remont budynku Placówki Opiekuńczo-Wychowawczej „DOM” przy ul. Nowobielańskiej 100 w Skierniewicach” — original title

PLPoland · SkierniewiceBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 16 November at 10:00 — 15 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the contract is an investment task consisting of: Execution of construction works for the investment task entitled: "Renovation of the building of the Care and Educational Facility "DOM" at ul. Nowobielańska 100 in Skierniewice’ The contract covers the execution of construction works in accordance with the provisions of the tender specifications, the design documentation constituting Annex 6 to the tender specifications, the bill of quantities constituting Annex 9 to the tender specifications and the price schedule constituting Annex 10 to the tender specifications. The existing building of the care and educational institution will be renovated and rebuilt. In addition, the building will be expanded, and a separate care and education facility will operate on the acquired area. Once the planned construction works have been carried out, the building will be adapted for…

Show full description

… people with disabilities. The extension of the building was designed in the form of two adjacent rectangular blocks. The plan of the building similar to the letter T. The new development continues the stylistics of the existing building. A two-storey building covered with a flat roof was designed. The roof plating above the last floor is designed from heat-sealing primer and top covering. The building will be equipped with an internal electrical, teletechnical, water, sewage, central heating and lightning protection system. Vertical communication will take place through 2 staircases and 1 passenger elevator. The building will be equipped with gravity ventilation, assisted. Heating of both outlets will be carried out from the existing gas-powered C.O. node. Each of the facilities, on the first floor, will have 2 separate sanitary rooms (showers, washbasin, paragraphs). The building and its surroundings will be adapted for use by people with disabilities. The sidewalk next to the building will be constructed in such a way as to ensure the most gentle approach and driveway to the platforms, located at the main entrances to both outlets. All interior doors will be devoid of thresholds. A passenger lift was designed to move vertically between individual floors. It is also for the contractor to obtain a decision authorising the operation of the UDT. The detailed scope of works for this task is determined by the bill of quantities and the price list and the design documentation. When valuing and performing works, decisions, conditions, arrangements, opinions to the developed project documentation should also be taken into account. Fulfilment of the conditions contained in the above-mentioned documents and the costs associated with them should be included in the price of the offer. It is also up to the Contractor to obtain the occupancy permit on behalf of the Ordering Party or to submit an effective notification of the completion of the works and the intention to enter into use (if they are required in accordance with applicable law). Note: Before signing the contract, the contractor whose tender is deemed to be the most advantageous is obliged to provide the Ordering Party with a price calculation Price list - drawn up in accordance with Annex 10 to the tender specification, drawn up on the basis of the submitted work schedules: • The Contractor must value each item separately in the Price List (CW) (Annex 10 to the ToR), observing the rules for calculating the value in each item and summarising the overall amounts given in the CW. The Contractor may not change the quantities given in the CW, • the CW must be read in conjunction with other contract documents. It is assumed that the Contractor has carefully read the detailed description of the works to be carried out and the manner in which they are to be carried out. The entire Works should be carried out in accordance with the intention and purpose of the subject of the contract, • the quantities given in each item of the list are information quantities, indicating only an indicative scope of work that should be carried out to complete a given element (works), for which a further calculated flat-rate remuneration is due and do not matter when calculating the value of a given element (works) after its completion, • short descriptions of the item

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published29 Oct 2026

Type of service

45 · Construction work42 · Industrial machinery39 · Furniture & furnishings43 · Mining & construction machinery
CPV 45100000-8 · 45111200-0 · 45262300-4 · 45262500-6 · 45320000-6 · 45261210-9 · 45421000-4 · 45432100-5

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (85 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to MODUS Biuro Projektowo-Wykonawcze Sp. z o.o.n = 85
  • 38% of this buyer's awards went to companies that had already won here before (223 awards since 2021, spread over 139 companies). 62% went to new names.n = 223 awards since 2021
  • The median procedure drew 4 bids (10 procedures with a bid count); 30% ended with a single bidder. Sector: median 5 bids.n = 10
  • Not one of the 223 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 223

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
EL-BUD Sławomir Dziadosz112021–2025
JKM MIREX Sp. z o.o.72021–2024
LIDER: PRZEDSIĘBIORSTWO ROBÓT DROGOWO-MOSTOWYCH SP. Z O.O.62021–2024
Przedsiębiorstwo Usługowo- Produkcyjne Euroasfalt Sp. z o.o.52021
P.P.H.U. "GESSEK" Waldemar Gessek52022–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

20
2021
31
2022
17
2023
20
2024
28
2025
10
2026
126 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 16 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 18 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now