How to bid in this country: portals, deadlines, thresholds →
Excerpts of construction-assembly works in the formula design and build consisting in the excerpt of supplying reserves. by purchasing a stationary power generator together with the necessary rob. bud-install for the needs of the CCN WSzZ
Wyk. prac bud-montaż. w formule zaprojektuj i wybuduj polegających na wyk. zasilania rezerw. poprzez zakup agregatu prądotwórczego stacjonarnego wraz z niezbędnymi rob. bud-instal na potrzeby ŚCN WSzZ — original title
Your path to submission
- Deadline: 18 November at 10:00 — 17 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is: a) preparation of complete project documentation in the scope of the contract in question, necessary for the Contracting Authority to obtain an appropriate administrative decision for the implementation of the task (application/construction permit) - STAGE I, b) execution of all construction works, land development (fence with a wicket, service zone of the device), construction of external networks and electrical installations, including grounding and protection against electrical shocks, telecommunications, checking the existing and possible replacement of the RDS system necessary for the functioning of the subject of the contract on the basis of the design documentation carried out by the Contractor and approved by the Contracting Authority, together with services that are not construction works, and all necessary preparatory works (organisation, fencing…
Show full description
… and securing of the construction site) necessary for the performance of the entrusted contract, accompanying works, in accordance with the detailed guidelines contained in the PFU, Annexes and the performance of all activities required by the provisions of the Construction Law of 7 July 1994, together with the execution of comprehensive as-builtch documentation and obtaining a valid use permit for the Contracting Authority – Stage II. c) performance of the obligations resulting from the guarantee/warrantee, during the period, referred to in § 14 of the agreement - Stage III. Details of the development of the complete project documentation include: • Annex 2a to the tender specification - Functional utility programme (PFU) (Annex 1 to the contract) • Annex 2b to the tender specification - Measurements (Annex 2 to the contract). • Annex 3 to the ToR – Draft provisions of the public procurement contract – information on the rules for performance of the subject-matter of the contract, guarantees and remuneration.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (29 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to Firma Remontowo – Budowlana Robert Janus.n = 29
- The median procedure drew just one bid (408 procedures with a bid count); 58% ended with a single bidder. Sector: median 5 bids.n = 408
- The award came in at a median 56% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 5
- 48% of this buyer's awards went to companies that had already won here before (1,317 awards since 2015, spread over 490 companies). 52% went to new names.n = 1,317 awards since 2015
- 4% of awards went to companies from abroad (1,317 awards with a known winner country). Sector average: 0%.n = 1,317
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Medtronic Poland Sp. z o. o | 28 | 2021–2026 |
| GE Medical Systems Polska Sp z o.o. | 15 | 2021–2026 |
| NEUCA S.A. | 14 | 2021–2025 |
| Stryker Polska Sp. z o.o. | 14 | 2021–2026 |
| Diagnos sp. z o.o. | 13 | 2021–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now