How to bid in this country: portals, deadlines, thresholds →
‘Purchase and delivery with unloading of paving stones, kerbs and lawn edges for Zakład Gospodarki Komunalnej i Mieszkaniowa Sp. z o.o. in Wielichów’
„Zakup i dostawa wraz z rozładunkiem kostki brukowej, krawężników drogowych i obrzeży trawnikowych dla Zakładu Gospodarki Komunalnej i Mieszkaniowej Sp. z o.o. w Wielichowie” — original title
Your path to submission
- Deadline: 6 November at 10:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is the purchase and delivery together with unloading of paving stones, kerbs and lawn edges for Zakład Gospodarki Komunalnej i Mieszkaniowa Sp. z o.o. in Wielichów. paving stones, road curbs, lawn edges in the period from 01.01.2027 to 31.12.2027: - Bet. Road curb grey 15x30x100 m2 = 500 - Overrun curb grey 15x22x100 mb = 100 - Sidewalk grey 6x20x100 mb = 300 - Sidewalk grey 8x30x100 mb = 200 - Paving block holland 6 cm coloured m2 = 100 - Paving block holland 6 cm grey m2 = 200 - Paving block holland 8 grey m2 = 100 - Paving block holland 8 coloured m2 = 100 - Paving block behaton 6 grey m2 = 500 - Paving block concrete 6 coloured m2 = 100 - Paving block behaton 8 grey m2 = 2000 - Paving block behotan 8 cm coloured m2 = 700 The quantities of the subject of the order are estimates, therefore the Contractor undertakes to react flexibly to the increased or…
Show full description
… reduced quantity of the supply. The Ordering Party reserves the right to limit the amount of ordered material depending on the needs resulting from a smaller number of orders, contracts than originally planned.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 13 months (4 awards, most recently November 2025) — the next award is due around December 2026 by that rhythm. The last award went to ROL-MAT BIS Produkcja Usługi Handel Marcin Matuszak.n = 4
- 33% of this buyer's awards went to companies that had already won here before (31 awards since 2021, spread over 21 companies). 67% went to new names.n = 31 awards since 2021
- Not one of the 31 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 31
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| DUON Dystrybucja Sp. z o.o. | 3 | 2022–2024 |
| Polska Grupa SW Przedsiębiorstwo Państwowe | 3 | 2024–2026 |
| Petropol Wolsztyn Sp. z o.o. Sp. k. | 3 | 2023–2025 |
| Zakład Drogowo-Budowlany NOJAN Jan Nowak | 2 | 2022–2023 |
| TRANS-KOL PALIWA Sp. z o. o. | 2 | 2023–2024 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually about 3 bids came in. A normal field for this market. (Based on 1,866 completed awards — not a statement about this procedure.)
This procedure allows 8 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). Much tighter than usual: the first week counts.
Foreign bidders
In Poland · Construction materials, 28 contracts went to foreign companies over the last 3 years (of 9,368 recorded awards) — mostly from Germany, France, Czechia.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now