Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Extension with reconstruction of the municipal road ul. Goślińska from Murowana Goślina to Rakownia

Rozbudowa z przebudową drogi gminnej ul. Goślińskiej od Murowanej Gośliny do Rakowni — original title

PLPoland · Murowana GoślinaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 12 November at 09:00 — 11 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The scope of the contract includes the extension with reconstruction of the municipal road ul. Goślińska from Murowana Goślina to Rakownia and concerns in particular: a) extension of the road lane and reconstruction (reinforcement) and extension of the existing surface from the mineral-asphalt mixture of the roadway ul. Goślińska with variable width approx. 5.5 – 7.4 m in length approx. 723 m; b) reconstruction of the geometrical system of the intersection of the municipal road ul. Goślińska from: municipal road 318037P ul. Zielonczana in km 0+476.43 and the municipal road ul. Wedge in km 0+699,59; c) construction and reconstruction of existing congresses; d) reconstruction of existing roadside ditches in the range of altitude adjustment from km 0+040.65 to km 0+063.28 on the left side; e) profiling and cleaning of existing roadside ditches in km 0+320.71 - 0+477.81; f) construction of…

Show full description

… culverts under the exits; g) construction of 2 outlets to the existing ditch with a diameter of Ø200 along the municipal road in km 0+076.79 and in km 0+187.92 along with the rainwater sewer network; h) construction, reconstruction and demolition of the gas network, i) construction, reconstruction and demolition of electricity networks for road lighting; j) construction of the suggested pedestrian crossing in km 0+317.11; k) construction of a pedestrian crossing in km 0+719.00; l) implementation of temporary and permanent organization of traffic.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published28 Oct 2026

Type of service

45 · Construction work
CPV 45231000-5 · 45233120-6 · 45111300-1 · 45000000-7 · 45111200-0 · 45232440-8

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (44 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to KANVEX TEAM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.n = 44
  • The median procedure drew 3 bids (19 procedures with a bid count); 32% ended with a single bidder. Sector: median 5 bids.n = 19
  • 41% of this buyer's awards went to companies that had already won here before (128 awards since 2019, spread over 69 companies). 59% went to new names.n = 128 awards since 2019
  • 2% of awards went to companies from abroad (128 awards with a known winner country). Sector average: 0%.n = 128

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
AT-DROG Sp. z o.o. Sp.k.122021–2025
BDT Wysocki Paweł102022–2025
ENEA Oświetlenie Sp. z o.o.52021–2026
TELE BUS Przewozy Okazjonalne i Turystyczne Paulina Frąckowiak42021–2025
Spółdzielnia Socjalna Szansa Murowana Goślina42024–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

6
2021
7
2022
12
2023
15
2024
11
2025
17
2026
68 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 12 November at 09:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now