Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Land development at Lake Rożnowski in Gródek nad Dunajcem municipality – stage II

Zagospodarowanie terenu nad Jeziorem Rożnowskim w gminie Gródek nad Dunajcem – etap II — original title

PLPoland · Gródek nad DunajcemBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 13 November at 09:00 — 12 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. Scope of the task: I. preparation of complete executive, technological and other documentation required for the implementation, execution of construction works and performance of activities and obtaining documents required by law for the release of the completed subject of the contract for use, including, if required, obtaining a decision on the use permit. II. The scope of works includes, in particular, preparatory, demolition, earth, construction, road, bridge, architectural, installation, electrical, telecommunications, finishing works, installation of equipment and ordering and restoration of the area and: ⎯ reconstruction of existing walking and driving routes and promenade; ⎯ construction of a walking bridge with a staircase and a viewpoint; ⎯ construction of beach terraces; ⎯ making a marina with a descent trap; ⎯ assembly of elements of small architecture; - reconstruction of…

Show full description

… the power grid and lighting; ⎯ demolition works indicated in the output documentation; - completion of finishing works and land development; ⎯ preparation of the facility and the site for use and execution of final documentation. 2.2.1 The detailed scope of the contract is set out in the annex to the tender specification, i.e. 1.Functional-Use Programme and Annexes 2. General technical specifications 2.2.2 The Contractor shall ensure; 1) Securing the construction site and securing it in accordance with applicable regulations - the task is carried out during the school year 2) Obtaining all the legally required arrangements, opinions, requirements, including the decision on the use of the facility (if applicable) 2.2.3 The construction of materials should be carried out in accordance with the guidelines of the manufacturer of selected materials, in accordance with the Polish Standard. All materials must be durable and have certificates and safety certificates. 2.2.4 For the planned purchase of , materials and equipment, you must always obtain acceptance from the Ordering Party 2.3. The contractor is obliged to carefully check the number of works due to the fact that the works contract will be a flat-rate contract. 2.5. All offered materials must be free from physical and legal defects, free from the rights of third parties and may not be subject to any proceedings and security. 2. Part II – Construction of a building for tourism services as part of the investment entitled ‘Development of the land on the Rożnowski Lake in the Gródek nad Dunajcem commune – stage II’. Scope of the task: I. preparation and completion of complete design documentation required to obtain a building permit decision, obtaining a building permit decision, preparation of executive, technological and other documentation required for implementation, documentation of connections, execution of construction works and performance of activities and obtaining documents required by law for the release of the completed subject of the contract for use, including, if required, obtaining a decision on a use permit. II. Scope of construction works - construction of a building of tourism services with a set of installations; ⎯ completion of finishing and landscaping works; ⎯ preparation of the facility and the site for use and execution of final documentation; - equipment 2.2.1 The detailed scope of the contract is set out in Annex 4 to the ToR, i.e. 1. Functional-Use Programme with annexes 2. General technical specifications 2.2.2 The Contractor shall ensure; 1) Securing the construction site and securing it in accordance with applicable regulations - the task is carried out during the school year 2) Obtaining all the legally required arrangements, opinions, requirements, including the decision on the use of the facility (if required) 2.2.3

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published28 Oct 2026
2 lots

Type of service

45 · Construction work71 · Architecture & engineering
CPV 45000000-7 · 45100000-8 · 45110000-1 · 45111000-8 · 45112000-5 · 45111291-4 · 45113000-2 · 45200000-9

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (62 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to Strabag Infrastruktura Południe Sp. z o.o.n = 62
  • The median procedure drew just one bid (9 procedures with a bid count); 56% ended with a single bidder. Sector: median 5 bids.n = 9
  • 27% of this buyer's awards went to companies that had already won here before (112 awards since 2019, spread over 75 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 112 awards since 2019
  • 3% of awards went to companies from abroad (112 awards with a known winner country). Sector average: 0%.n = 112

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Zakład Usługowo Produkcyjny KAM-BET Krzysztof Rolka52022–2024
FIRMA HANDLOWO - USŁUGOWA FEDKO Spółka Jawna42023–2024
Firma Elektryczna i Teletechniczna Kamil Jasiński42021–2024
BANK SPÓŁDZIELCZY W NOWYM SĄCZU42021–2025
Zakład Remontowo-Budowlany Wiesław Czop42021–2023
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

12
2021
5
2022
19
2023
13
2024
14
2025
14
2026
77 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Friday 13 November at 09:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now