How to bid in this country: portals, deadlines, thresholds →
Reconstruction of the road in Rydzyn Szlachecki
Przebudowa drogi w miejscowości Rydzyn Szlachecki — original title
Your path to submission
- Deadline: 12 November at 10:00 — 11 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the reconstruction of the road in Rydzyn Szlachecki. The scope of the contract includes: - measuring works, - removal of the layer of fertile soil (humus), - forming and compacting embankments, - execution of earthworks, - construction of pavement, - execution of roadsides of broken aggregate. Geometrical parameters: The roadway with a width of 3.00 m was designed. Other geometric data and technical parameters adopted for design: -Category of the road: interior, - Road class: D, - Type: city road, - Speed to design: 30km/h, - Number of carriageways and lanes: 1/1, - Lane width: 3.00 m, - The width of the ground shoulder: 0,50 m, - Depth of freezing: 1,00 m, - Surface construction: KR1, - Lateral paving: one-sided 2%, - Lateral slope of the shoulder: 8%, Pavement structure The following pavement structure is adopted: - asphalt concrete abrasive layer…
Show full description
… AC11S 50/70 gr. 4cm, - asphalt concrete bonding layer AC16W 50/70 gr. 4cm, - non-aggregate C90/3 substrate with a grain size of 0/31,5 mechanically stabilized gr. 15cm, - improved substrate layer with a hydraulic binder stabilized with cement C1,5/2≤4,0MPa gr. 10cm, - existing substrate brought to G1 and compacted to the IS≥0,98 indicator. Interlayer bonding is designed between bitumen layers. As binders, it is recommended to use C 60 B3 ZM asphalt emulsion. Before making the bonding layer, the substructure should be sprinkled with asphalt emulsion in the amount of 0.5-0.7 kg / m2. Before making the abrasive layer, the bonding layer should be sprinkled with an asphalt emulsion in the amount of 0.1-0.3 kg / m2. 2. The description of the subject-matter of the contract shall be as follows: 1/ design documentation, 2/ technical specifications for the execution and acceptance of construction works. 3. If the description of the subject-matter of the contract in this procedure – including the technical documentation or technical specifications for the execution and acceptance of construction works used to describe the subject-matter of the contract – includes any trademarks, patents or origin, source or specific process that characterises the products or services provided by a specific economic operator, the contracting authority shall accept equivalent solutions (‘or equivalent’ – Article 99(5) of the PPL). When preparing the description of the subject of the contract on the basis of the construction and executive design, the Ordering Party did not find any trademarks, patents or origins, sources or specific processes that characterize the products or services provided by a specific Contractor. However, if the Contractor finds/notices, when analysing the description of the subject matter of the contract, that there are such cases or indirectly pointing to one specific product, the Contractor is asked, in accordance with Article 284(1)(b) CTMR, to: 1 of the Public Procurement Act, when asking the contracting authority to clarify the content of the tender specification, indicated such products. Then, as an explanation/change of the content of the tender specifications, the contracting authority, together with the designer, will specify which features of the ordered product have an equivalent value for him, which will be taken into account in the assessment and specify the criteria used for the purpose of equivalence. A similar rule shall apply in cases where references to standards, European Technical Assessments, approvals, technical specifications and technical reference systems referred to in Article 101(1)(b) CTMR have been included in the description of the subject-matter of the contract. 1 point 2 and par. 3 of the Public Procurement Act. 4. Where the description of the subject-matter of the contract refers to standards, technical assessments, technical specifications and technical reference systems as referred to in Article 101(1)(b) CTMR; 1 point 2 and paras. 3 of the Public Procurement Act, the contracting authority may not reject a tender on the sole ground that the works, supplies or services offered do not comply with the standards, technical assessments, technical specifications and technical reference systems to which the description of the subject of the contract refers, provided that the economic operator proves in the tender, in particular by means of the means of evidence in question, that
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (44 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to BIOŚ Sp. z o.o.n = 44
- 20% of this buyer's awards went to companies that had already won here before (101 awards since 2019, spread over 78 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 101 awards since 2019
- The median procedure drew 2 bids (8 procedures with a bid count); 13% ended with a single bidder. Sector: median 5 bids.n = 8
- Not one of the 101 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 101
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Usługi Ogólnobudowlane "BUD-POL" Paweł Giżyński | 4 | 2023–2024 |
| Przedsiębiorstwo Robót Drogowo-Inżynieryjnych PRDI S.A. | 3 | 2021–2022 |
| Wojewódzkie Przedsiębiorstwo Usług Inwestycyjnych Sp. z o.o. | 3 | 2022–2023 |
| HYDRO-PARTNER Sp. z o.o. | 3 | 2022–2026 |
| MABO Małgorzata Bober | 3 | 2021–2024 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 16 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now