Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Continuation of construction and assembly works on the investment task entitled ‘Construction of a complex of 8 ponds (earth reservoirs) for rainwater retention located between streets (....) in Radom

Kontynuacja robót budowlano-montażowych na zadaniu inwestycyjnym pn.: „Budowa zespołu 8 stawów (zbiorników ziemnych) dla retencji wód opadowych zlokalizowanych pomiędzy ulicami (....) w Radomiu — original title

PLPoland · RadomBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 10 November at 08:00 — 9 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The object of the construction project is the continuation of construction works in order to complete the construction of 8 retention ponds together with the accompanying infrastructure and the development of green areas. The intended use of the facility will be the retention of rainwater in retention ponds and the use of a multifunctional space for rest and relaxation, sports and leisure activities for people from many social, age and cultural groups in existing green areas. The investment area includes three zones – water: with east-west retention ponds and all hydrotechnical facilities. The second zone located in the south-central part of the site is based on the preservation of a cluster of adult trees in the existing green area. This place will be a natural habitat left by natural succession and will have an educational, recreational and sports function. The third zone was located…

Show full description

… in the north-central part of the development area and is a combination of green areas with public areas. It is characterized mainly by a recreational function with designed fitness devices.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published26 Oct 2026

Type of service

45 · Construction work
CPV 45240000-1 · 45246000-3 · 45000000-7 · 45100000-8 · 45111200-0 · 45231300-8 · 45310000-3 · 45233140-2

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (35 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to Instal-Glob Marcin Maj.n = 35
  • 17% of this buyer's awards went to companies that had already won here before (127 awards since 2015, spread over 50 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 127 awards since 2015
  • The median procedure drew 3 bids (53 procedures with a bid count); 19% ended with a single bidder. Sector: median 5 bids.n = 53
  • 10% of awards went to companies from abroad (127 awards with a known winner country). Sector average: 0%.n = 127
  • Across 3 procedures with structured selection criteria, this buyer most often required: Product samples (2 of 3), References: services (2 of 3), Special authorisation or membership required (1 of 3).n = 3

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Usługowy Zakład Hydrauliczny Marian Wieczorek62025–2026
Marcin Maj Instal Glob52025–2026
Pekao Leasing Sp. z o.o.32025–2026
ALMA S.A.32026
CARZONI Izabela Seweryn22022–2023
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

5
2021
2
2022
1
2023
6
2024
10
2025
22
2026
46 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Tuesday 10 November at 08:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now