How to bid in this country: portals, deadlines, thresholds →
Certified Welding Training: TIG Welding Course for Inguinal Sheets and Pipes (141) MAG Welding Course for Inguinal Sheets and Pipes (135)
Certyfikowane szkolenia ze spawania: Kurs spawania blach i rur spoinami pachwinowymi metodą TIG (141) Kurs spawania blach i rur spoinami pachwinowymi metodą MAG (135) — original title
Your path to submission
- Deadline: 4 November at 10:00 — 3 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is to carry out certified training: 1.1. TIG welding course for inguinal welds (141) – thematic scope: welding equipment, health and safety rules applicable to the welder, marking and dimensioning of welds, methods of preparing joints for welding, welding of sheets and pipes using the known method, preparation for passing the Welder's Qualification Examination and obtaining the Welder's Qualification Examination Certificate and Welder's Book issued by an authorized institution. 1.2. MAG welding course for inguinal welds (135) – thematic scope: welding equipment, health and safety rules applicable to the welder, marking and dimensioning of welds, methods of preparing joints for welding, welding of sheets and pipes using the known method, preparation for passing the Welder's Qualification Examination and obtaining the Welder's Qualification Examination…
Show full description
… Certificate and Welder's Book issued by an authorized institution. 2. Training must be carried out within 24 months from the date of conclusion of the contract, or until the contract price is exhausted, whichever occurs first, subject to § 2 sec. 7(1)(a) and (c) 7 point 2) and § 6 sec. 3 point 2) letter c) of the Draft Terms of the Agreement; between 8:00 and 21:00 in both Monday-Friday and weekend mode, i.e. Saturday-Sunday. The dates of the first trainings will be set after the conclusion of the contract. Training must take place in person.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (252 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to Sławomir Jeliński.n = 252
- 36% of this buyer's awards went to companies that had already won here before (1,504 awards since 2015, spread over 666 companies). 64% went to new names.n = 1,504 awards since 2015
- The median procedure drew 2 bids (404 procedures with a bid count); 48% ended with a single bidder. Sector: median 2 bids.n = 404
- 7% of the bids received came from other countries (31 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 31
- 5% of awards went to companies from abroad (1,504 awards with a known winner country). Sector average: 2%.n = 1,504
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Sylwester Brzozowski prowadzący działalność gospodarczą pod firmą POL BUD SYLWESTER BRZOZOWSKI | 29 | 2021–2026 |
| KJMK Meble Sp. z o.o. | 24 | 2021–2026 |
| PIECHOCZEK EUGENIUSZ prowadzący działalność gospodarczą pod nazwą AIRCONTACT | 19 | 2021–2026 |
| BAUTERM Rafał Jędrzejewski, Łukasz Bugajczyk, Mariusz Nowaczek S.C. | 19 | 2021–2025 |
| MOSTOSTAL ZABRZE Gliwickie Przedsiębiorstwo Budownictwa Przemysłowego Spółka Akcyjna | 18 | 2021–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 7 completed awards — not a statement about this procedure.)
This procedure allows 12 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Education & training, 310 contracts went to foreign companies over the last 3 years (of 20,800 recorded awards) — mostly from Germany, Bulgaria, Spain.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now