How to bid in this country: portals, deadlines, thresholds →
Construction of Truskawkowa and Brzoskwiniowa Streets in Komorniki
Budowa ul. Truskawkowej i Brzoskwiniowej w Komornikach — original title
Your path to submission
- Deadline: 13 November at 10:00 — 12 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject-matter of the contract shall be: road construction ul. Strawberry and peach concrete paving stones, with a width of at least 5,0 m, with a total length of 616,0 m; construction of two-sided sidewalks on ul. Strawberry and Peach concrete paving stone, width from 1.45 m to 1.85 m and concrete paving stone gauge; construction of L-type prefabricated retaining wall, up to 1.0 m high, approx. 55m; implementation of rainwater sewerage in both streets, reconstruction of the infrastructure network of the area colliding with the investment to the extent necessary for its implementation, including height adjustment and location of road lighting poles, preparatory and finishing works, including tree felling, height adjustment of existing descents, grass seeding, as well as road markings. 2. The detailed scope of works in accordance with which work must be carried out…
Show full description
… includes design documentation, STWiOR, bills of quantities, which are attached to this tender specification. 3. The Contractor is obliged to prepare as-built documentation in 2 copies in paper version and 1 copy in electronic version on a CD or USB stick, and provide it to the Ordering Party, one copies in paper version for the Commune Office of Komorniki, and the second to the extent necessary to submit to the District Building Supervision Inspectorate for the Poviat of Poznań together with obtaining relevant documents confirming the possibility of starting to use the completed facility. 4. A detailed description of the terms of performance of the subject-matter of the contract is contained in the draft provisions of the contract, which are attached as Annex 8 to the ToR. 5. The Contractor is obliged for the entire period for which the Contract will be concluded to have civil liability insurance in respect of the activities related to the subject of the contract for a guarantee amount of not less than PLN 1,000,000.00, valid not later than from the date of signing the contract until final acceptance. The Ordering Party shall accept the civil liability insurance document held by the Contractor in the scope of activities related to the subject of the contract for the amount of the guarantee required by the Ordering Party, which will be concluded for a one-year period and will be renewable with continuity of insurance protection until final acceptance. 7. Guarantee and warranty Required warranty period - according to the offer, minimum 60 months. The scope of rights under the warranty is regulated by the provisions of the Civil Code. The warranty period and warranty period are equal. 8. Information on the use of equivalent products, materials and technologies. In the case of the names of materials used in the documentation of proceedings, they should be understood as examples – with the parameters desired by the Ordering Party. This means that the Contracting Authority allows in any case the use of material equivalent in terms of the main (essential) technical and performance parameters, while maintaining at least the same level of quality, durability, functionality and compatibility with other materials used (embedded) in the performance of the contract. Only material changes that fall within the scope of the included design, technological and technical solutions are allowed. In such a situation, the Ordering Party requires the submission of relevant documents confirming the parameters of materials and devices. If the Contractor intends to use any equivalent solutions or materials, he must describe them in detail in the tender and demonstrate their equivalence. In this case, the Contractor shall attach to the tender a list of equivalent solutions together with its description or standards. Pursuant to Article 101(1) CTMR, 4 of the Public Procurement Act in the event that the documents describing the subject-matter of the contract contain a reference to the standards, technical assessments, approvals, technical specifications and technical reference systems referred to in Article 101(1) CTMR. 1 point 2 and par. 3 of the Public Procurement Act, and such references were not accompanied by the expression ‘or equivalent’, the Contracting Authority allows
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (122 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Projprzem Budownictwo Sp. z o.o.n = 122
- The median procedure drew just one bid (15 procedures with a bid count); 53% ended with a single bidder. Sector: median 5 bids.n = 15
- 41% of this buyer's awards went to companies that had already won here before (244 awards since 2019, spread over 137 companies). 59% went to new names.n = 244 awards since 2019
- The award came in at a median 100% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 5
- Not one of the 244 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 244
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Pomagamy24h.pl Sp. z o.o. | 10 | 2022–2026 |
| Przedsiębiorstwo Usług Komunalnych Komorniki Sp. z o.o. | 8 | 2022–2026 |
| KOST-BUD PIOTR DRUCHLIŃSKI | 7 | 2022–2025 |
| Izbruk Maciej Rybicki Zakład Ogólnobudowlany | 7 | 2022–2024 |
| BUD-AN Sp. z o. o. | 6 | 2022–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now