How to bid in this country: portals, deadlines, thresholds →
"Development of design documentation for road tasks in the Stęszew Commune – 2 parts"
"Opracowanie dokumentacji projektowej dla zadań drogowych na terenie Gminy Stęszew – 2 części" — original title
Your path to submission
- Deadline: 4 November at 07:00 — 3 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the execution of a project for the construction of an internal road ul. Nowa w m. Łódź on a section of about 210 m and the execution of a project for the construction of a ‘bay’ on the public road 330035P Trzebaw – Będlewo, ul. School on a section of about 100 m (post-sewage areas). 1. The scope of work includes: 1.1. obtaining geodetic sleepers for design purposes; 1.2. making a map of the legal status (if required); 1.3. carrying out the necessary research, e.g. geotechnical; 1.4. obtaining the necessary agreements and opinions of the competent authorities as well as other documents required by specific regulations; 1.5. preparation of installations (e.g. obtaining a water and legal permit) and obtaining final permits needed to implement the project, 1.6. preparation of construction, technical and executive projects (including 3 copies for the…
Show full description
… contracting authority) 1.7. obtaining a building permit / ZRID decision together with the final decision. 1.8. drawing up a project for the temporary organization of traffic for the duration of the work, together with its approval; 1.9. development of a project for the permanent organisation of traffic and its approval; 1.10 .developing detailed technical specifications for the planned works – 2 copies 1.11 . author's supervision 2. Preparation of cost estimates in pdf and ath versions: 2.1. investor's cost estimate – 2 copies 2.2. bill of quantities – 2 copies 2.3. simplified cost estimate including RMS statements – 2 copies 2.4. electronic submission of the above-mentioned studies – 2 copies 3. Deadline for implementation of the project: 3.1. 8 months from the date of signing the contract. 2. Preparation of design documentation for the renovation of the municipal road ul. Wielkopolska insurgents in Dębno, Stęszew The subject of the contract is the execution of a project for: Renovation of the municipal road 330023P Stęszew – Wielkawieś, ul. Powstańców Wielkopolskie, Dębienko district from the district road 2402P Dopiewo – Trzcielin – Stęszew (ul. 28 December, Powstańców Wlkp., Wojska Polskiego to the municipal road ul. Poniatowskiego 330022P Glinka - Wypalanki - Stęszew on a section of about 1.5 km. 1. The scope of work includes: 1.1 obtaining geodetic sleepers for design purposes; 1.2 mapping of the legal status (if required); 1.3 carrying out the necessary research, e.g. geotechnical; 1.4 obtaining the necessary agreements and opinions of the competent authorities, decisions on, for example, environmental conditions, as well as other documents required by specific regulations; 1.5 preparation of the installations (e.g. obtaining a water and legal permit) and obtaining the final permits needed to implement the project, if the required 1.6 preparation of construction and technical projects (including 3 copies for the Ordering Party) 1.7 obtaining a building permit / ZRID decision / notification - obtaining the finality of the decision. 1.8 drawing up a project for the temporary organisation of traffic for the duration of the works, together with its approval; 1.9 elaboration of detailed technical specifications for the planned works – 2 copies 1.10. author's supervision. 2. Preparation of cost estimates in pdf and ath versions: 2.1. investor's cost estimate – 2 copies 2.2. bill of quantities – 2 copies 2.3. simplified cost estimate including RMS statements – 2 copies 3. Electronic submission - pdf + dwg - 2 copies 4. Deadline for implementation of the project: 4.1. 8 months from the date of signing the contract.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (13 awards, most recently March 2025) — by that rhythm the next award was due around June 2025. The last award went to BIURO PROJEKTÓW BUDOWNICTWA KOMUNIKACYJNEGO PRO-KON ANDRZEJ KONOPKA ul. Łąkowa 3a 58-533 Mysłakowice NIP:6112561563.n = 13
- The median procedure drew just one bid (6 procedures with a bid count); 50% ended with a single bidder. Sector: median 4 bids.n = 6
- 34% of this buyer's awards went to companies that had already won here before (110 awards since 2018, spread over 69 companies). 66% went to new names.n = 110 awards since 2018
- Not one of the 110 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 110
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Smolgaz Grażyna Smolibowska ul. Błażejewska 47B 62-035 Kórnik NIP:7851262146 | 6 | 2021–2025 |
| EUROVIA Polska S.A. Bielany Wrocławskie, ul. Irysowa 1, 55-040 Kobierzyce | 6 | 2021–2026 |
| Zakład Budowy I Utrzymania Dróg Robert Ziemecki | 5 | 2022–2025 |
| BRIKBAU ANNA NOWACKA | 4 | 2022–2025 |
| Zakład Drogowo-Budowlany NOJAN Jan Nowak | 4 | 2021–2024 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 4,806 completed awards — not a statement about this procedure.)
This procedure allows 12 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,697 recorded awards) — mostly from Germany, France, Switzerland.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now