How to bid in this country: portals, deadlines, thresholds →
Expansion of the rainwater management system in Witnica.
Rozbudowa systemu gospodarowania wodami opadowymi w m. Witnica. — original title
Your path to submission
- Deadline: 6 November at 10:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The scope of the task includes: - closure of the rainwater inflow to the retention reservoir, - pumping rainwater for the duration of the renovation works of the retention reservoir using a by-pass, - mowing and felling of vegetation (trees, bushes, water vegetation) self-seeds on the slopes, bottom and crown of the reservoir, - cleaning the bottom of the reservoir from mud and vegetation, - demolition of openwork panels from slopes and bottom of the reservoir, - making an insulating layer on slopes and bottom of the reservoir, - laying openwork panels on slopes and bottom of the reservoir, - dismantling and re-assembling the entrance gate and gate, - repairing the existing fence, - cleaning / replacing the separator, - improving / renewing the access road with a paving surface.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (44 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Zakład Ogólnobudowlany Jarosław Błażków.n = 44
- The median procedure drew just one bid (5 procedures with a bid count); 80% ended with a single bidder. Sector: median 5 bids.n = 5
- 21% of this buyer's awards went to companies that had already won here before (81 awards since 2015, spread over 61 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 81 awards since 2015
- Not one of the 81 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 81
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| PRZEDSIĘBIORSTWO DROGOWE "KONTRAKT" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 4 | 2023 |
| a. ZZAKŁAD WYROBÓW I PREFABRYKATÓW BETONOWYCH DIONIZY WOIŃSKI | 4 | 2024–2026 |
| MIZAR SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 3 | 2023–2026 |
| Przedsiębiorstwo Usługowe ARGOS Agata Miłostan | 2 | 2022 |
| Przedsiębiorstwo Robót Inżynieryjnych "PRInż" sp. z o.o. | 2 | 2022–2024 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now