Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Vehicle fleet insurance SGGW in Warsaw

Ubezpieczenie floty pojazdów SGGW w Warszawie — original title

PLPoland · WarszawaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 12 November at 09:30 — 11 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the contract is insurance of vehicles owned or used by the Ordering Party in the scope of: a) compulsory insurance against civil liability in respect of the use of motor vehicles (OC) b) insurance against civil liability in respect of the use of motor vehicles in countries covered by the Green Card system (ZK), c) autocasco insurance (AC), d) Assistance insurance (ASS), e) accident insurance for vehicle users and passengers (NNW). A detailed description of the subject-matter of the contract and other information relevant to the preparation of the tender are contained in Annexes 4, 8 and 9 to the tender specification. Pursuant to Article 441 of the Public Procurement Act, the contracting authority reserves the right to unilaterally extend the scope of the contract as part of the exercise of the right of option. The contracting authority does not divide the contract into…

Show full description

… lots. Thus, the contracting authority does not allow the submission of partial tenders referred to in Article 7(15) of the Public Procurement Act. Justification for not splitting the contract into lots: The contracting authority informs that it does not divide the contract into lots in the procedure for the procurement of insurance services for OC, AC, ASS and NNW vehicles, as this is not in the interest of the contracting authority. The division of responsibility for the insurance services provided into two or more entities will be only illusory due to the homogeneity of the entire contract. In addition, dividing the contract into lots may make it difficult to obtain full insurance coverage or significantly increase its cost. The division of the contract could make it more difficult to determine the liability of a particular insurer (in the event that the contract is awarded to different insurers), especially since insurances could be mutually exclusive, which could consequently lead to the contracting authority not obtaining compensation. In addition, contractors can only comprehensively present the real and adequate cost of insurance protection to the state of the market by diversifying their risk between the insurances indicated in the tender specifications.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeServices
Estimated valuenot published — common for below-threshold procedures
Published20 Oct 2026

Type of service

66 · Financial & insurance services
CPV 66514110-0

Clement What the numbers say about this buyer

  • 100% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 21%.n = 10
  • 35% of this buyer's awards went to companies that had already won here before (746 awards since 2015, spread over 396 companies). 65% went to new names.n = 746 awards since 2015
  • The median procedure drew 2 bids (106 procedures with a bid count); 49% ended with a single bidder. Sector: median 2 bids.n = 106
  • 4% of awards went to companies from abroad (746 awards with a known winner country). Sector average: 1%.n = 746
  • 0% of the bids received came from other countries (10 procedures with a bid mix) — all bidders, not just the winners. Sector: 2%.n = 10

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
In comparable contracts in this sector nationwide (3,095 with a known bid count), usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Ampol-Merol Sp. z o.o.222021–2026
Agrosimex Sp. z o.o.222021–2026
ProCam Polska Sp. z o.o.212021–2026
Agrii Polska172021–2026
RUDNIKAGRO Sp. z o.o.122022–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

1
2022
1
2024
1
2026
3 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Thursday 12 November at 09:30

Tactics

When contracts were awarded in this country and sector, usually only one or two bids came in. A solid bid has a real chance here. (Based on 3,095 completed awards — not a statement about this procedure.)

This procedure allows 23 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Financial & insurance services, 83 contracts went to foreign companies over the last 3 years (of 16,308 recorded awards) — mostly from France, Germany, Bulgaria.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now