How to bid in this country: portals, deadlines, thresholds →
1. Reconstruction of District Road No 5488P in Zielona Wieś as regards the pavement – Stage II.
1. Przebudowa drogi powiatowej Nr 5488P w m. Zielona Wieś w zakresie chodnika – ETAP II. — original title
Your path to submission
- Deadline: 5 November at 09:00 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The documentation provides for the reconstruction of district road No 5488P in Zielona Wieś. The reconstruction of the road will consist in the construction of a one-sided sidewalk along the carriageway of the district road. For this purpose, along the edge of the roadway on the project side of the pavement, a concrete curb with an edge sewer should be laid, referring to the existing inclined edges of the roadway, channelling and drains, rainwater sewerage, which includes, among others, partial swarming of the ditch on which its route runs in order to properly drain the roadway area of the district road. The gaps created between the existing edge of the carriageway and the stacked sewage should be filled with bituminous flooding mass. At the height of plots no. ewid. gr. 240/1 and 562, 2 curb ramps should be made with the separation of a warning belt (PO), a field of attention (PU)…
Show full description
… and a guide belt (PP) for the designed (according to a separate study) pedestrian crossing, Within the ramps install hybrid lighting to illuminate the pedestrian crossing. Along the designed sidewalk, green areas should be planted and height attachments should be made within the road lane in green areas without causing water run-off on adjacent plots. The descents occurring on the route of the designed pavement are made of concrete paving stones. In the place of the existing lighting pole at the height of the boundary of plots No. Ewid. gr. 561/1 and 562, a narrowing of the pavement and a granite cube service belt should be made, in which the existing pole will be located. 2. A detailed description of the subject-matter of the contract is contained in: 1) Draft agreement in accordance with Annex 7 to the ToR, 2) Estimates and estimates in accordance with Annex 8 to the ToR, 3) Application documentation in accordance with Annex 9 to the ToR 4) Draft permanent traffic organisation in accordance with Annex 10 to the ToR, 5) STWiORB in accordance with Annex 11 to the ToR.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (75 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to "RAWBUD" - Rawicz spółką z ograniczoną odpowiedzialnością.n = 75
- 60% of this buyer's awards went to companies that had already won here before (291 awards since 2021, spread over 113 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 291 awards since 2021
- The median procedure drew 2 bids (14 procedures with a bid count); 43% ended with a single bidder. Sector: median 5 bids.n = 14
- 1% of awards went to companies from abroad (291 awards with a known winner country). Sector average: 0%.n = 291
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Paweł Kaczan Zakład Handlu i Usług Kama | 32 | 2022–2026 |
| Spółdzielnia Mleczarska Mlekovita | 17 | 2023–2026 |
| JOHN PAWEŁ - P. P. H. U. ,, JOHN '' | 12 | 2022–2026 |
| "SKM DRÓG SP. Z O.O. " | 11 | 2022–2026 |
| PPH Piekarnia-CukierniaHUBCIO | 7 | 2022–2025 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 16 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now