How to bid in this country: portals, deadlines, thresholds →
Preparation of complete project documentation for the task entitled ‘Construction of a pavement at 100 km 0+000 to 110 km 0+682 on the north side of provincial road No 773 (...)
Opracowanie kompletnej dokumentacji projektowej dla zadania pn. „Budowa chodnika na odc. 100 km 0+000 do odc. 110 km 0+682 po północnej stronie drogi wojewódzkiej nr 773 (...) — original title
Your path to submission
- Deadline: 6 November at 10:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
3. Subject of the contract: 3.1. The subject of the contract is the design of a construction object for the task under the name Development of complete design documentation for the task entitled: ‘Construction of a pavement for a section 100 km 0+000 to the section 110 km 0+682 on the north side of provincial road No 773, including drainage within the boundaries of road lane No 204/2 in Nowa Wieś, No 272 in Przybysławice, Skała municipality’. 3.2. Description of the subject of the contract: 3.2.1. Development of complete project documentation for the task entitled: ‘Construction of a pavement for a section 100 km 0+000 to the section 110 km 0+682 on the north side of provincial road No 773 with drainage within the boundaries of road lane No. ew. 204/2 in Nowa Wieś, No. ew. 272 in Przybysławice, Skała municipality’, divided into 3 stages: 3.2.1.1. Stage I – ‘Construction of pavement…
Show full description
… within WD 773 section 100 from 0+000 to 1+465.’, 3.2.1.2. Stage II – ‘Construction of pavement within DW 773 in section 100 from 1+465 to 1+820.’, 3.2.1.3. Stage III – ‘Construction of pavement within WD 773 section 110 from 0+000 to 0+682.’ 3.2.2. A section of road with a length of about 2.5 km runs from the intersection with DP 1156 K to the border with the municipality of Iwanowice, 3.3. The contract shall consist of: 3.3.1. Map for design purposes (+ electronic version). The contracting authority does not rule out the possibility that neighbouring plots may be included in the scope of the investment. The estimated number of neighbouring parcels that may fall within the scope of the investment is: about 15 plots on the north side, 3.3.2. Preliminary draft to be agreed with the Contracting Authority (concept), 3.3.3. Geotechnical recognition and assessment of land surface and substrate, 3.3.4. Project materials for obtaining opinions, arrangements and permits required by special regulations, including arrangements in PEAM. 3.3.5. A water-law operation with the submission of an application for a water-law permit (if required). 3.3.6. Preparation of an environmental impact report (if required). 3.3.7. Execution of all studies resulting from the acquired conditions. 3.3.8. Carrying out all the necessary studies resulting from the arrangements in the institutions participating in the procedure for issuing a building permit decision or notification. 3.3.9. Obtaining a decision on environmental conditions consent for the implementation of the investment (if required). 3.3.10. Execution of technological channels or obtaining derogations. 3.3.11. Multi-discipline construction and executive design containing, among others: 3.3.11.1. land development project, 3.3.11.2. longitudinal profile of the pavement and sewerage system, 3.3.11.3. lateral profiles of the pavement, 3.3.11.4. redevelopment / media protection project in the road lane type: gas pipeline, water supply, sewage, electricity, teletechnics, etc., 3.3.11.5. fitting exits to the designed pavement. 3.3.11.6. If necessary, carry out and finalise the procedure for establishing the boundaries of the road lane 3.3.12. The above-mentioned designs should be prepared in the amount of 5 copies of the construction design and 5 copies of the executive design and 2 copies in electronic version. 3.3.13. The project of permanent and temporary during the renovation of traffic organization. 3.3.14. Inventory and management of existing green space (if required). 3.3.15. Design of felling/planting/planting of trees (if required). Project to secure existing greenery during construction. 3.3.16. Works bills (paper version pcs. 2 and electronic pcs. 1). 3.3.17. Investor's cost estimate (paper version pcs. 2 and electronic pcs. 1). 3.3.18. Detailed Technical Specifications (paper version pcs. 2 and electronic pcs. 1). 3.3.19. Development of information on health and safety (paper version pcs. 2 and electronic pcs. 1). 3.3.20. A complete application (together with its submission) for a permit for the implementation of a road investment, building permit or notification of works. 3.3.21. Performing copyright supervision in the implementation of the task. 3.3.22. In the case of entry into private areas with designed technical infrastructure, the contractor
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (3 awards, most recently February 2026) — by that rhythm the next award was due around April 2026. The last award went to Drogowa Inżynieria Sp. z o.o. Sp. k.n = 3
- The median procedure drew 2 bids (5 procedures with a bid count); 40% ended with a single bidder. Sector: median 4 bids.n = 5
- 26% of this buyer's awards went to companies that had already won here before (96 awards since 2020, spread over 69 companies). 74% went to new names.n = 96 awards since 2020
- Not one of the 96 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 96
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| "BOLTECH" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 6 | 2022–2026 |
| Arkadiusz Muszyński RESTAURACJA EXTRIMM | 5 | 2024 |
| SPEC-DRÓG Bartosz Słowiński | 4 | 2021 |
| Kompostech Sp. z o. o. | 3 | 2022–2024 |
| P. H. U. P. „Mika” Jerzy Migdał, Marcin Migdał, Rafał Migdał | 3 | 2021 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually about 4 bids came in. A normal field for this market. (Based on 4,806 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Architecture & engineering, 115 contracts went to foreign companies over the last 3 years (of 40,697 recorded awards) — mostly from Germany, France, Switzerland.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now