Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Construction of a pavement under District Dr No 1881R Dębowiec-Załęże-Osiek Jasielski in Załęże at km 2+290-2+ 468 as part of the investment project entitled ‘Construction of pavements by district roads’.

Budowa chodnika w ciągu dr. powiatowej Nr 1881R Dębowiec-Załęże-Osiek Jasielski w miejscowości Załęże w km 2+290-2+ 468 w ramach zadania inwestycyjnego pn. „Budowa chodników przy drogach powiatowych”. — original title

PLPoland · JasłoBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 4 November at 12:00 — 3 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the contract is the execution of construction works related to the construction of a pavement along the district road No 1881R Dębowiec-Załęże-Osiek Jasielski in Załęże in km 2+290-2+ 468 as part of the investment task entitled ‘Construction of sidewalks on district roads’. 2. The scope of works includes in particular: 1) execution of earthworks and engraving under the pavement and widening of the roadway; 2) construction of a stone aggregate substructure; 3) setting concrete curbs on a concrete bench and concrete edges; 4) paving of C25/30 concrete pavement with polymer fibers, 12 cm thick, on 3 cm thick sand ballast, with expansion joints; 5) making the pavement of descents from concrete paving stones; 6) execution of works related to the extension and restoration of the bituminous surface; 7) height adjustment of inspection wells and sewage wells; 8) leveling and…

Show full description

… contouring the surface behind the descents, ordering the area and making an as-built inventory, in accordance with the design documentation and the bill of quantities. 3. A detailed description of the subject-matter of the contract is set out in the annexes to the tender specifications: 1) Design documentation – Annex 5 to the ToR, 2) Technical Specification for the Execution and Acceptance of Works – Annex 6 to the ToR. The contracting authority points out that the design documentation prepared covers the implementation of the entire investment project, while the subject of the present proceedings is only part of the works provided for in that documentation. The detailed scope of works covered by the contract was specified in the bill of quantities, which is the basis for preparing the offer and performing the contract.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published20 Oct 2026

Type of service

45 · Construction work71 · Architecture & engineering
CPV 45233222-1 · 45111200-0 · 45233220-7 · 71250000-5 · 45233140-2

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (59 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Wieloczynnościowa Firma Handlu i Usług Jan Gumienny.n = 59
  • 66% of this buyer's awards went to companies that had already won here before (176 awards since 2021, spread over 60 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 176 awards since 2021
  • Not one of the 176 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 176

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
Przedsiębiorstwo Robót Drogowo Mostowych Sp. z o. o.292021–2026
Wieloczynnościowa Firma Handlu i Usług Jan Gumienny212021–2026
F.H.U Instal Socha Sp.j.92021–2026
Wieloczynnościowa Firma Handlu i Usług Gumienny Jan82021–2025
FIRMA USŁUGOWA Robert Kowalczyk, ,82021–2025
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

12
2021
8
2022
13
2023
6
2024
16
2025
17
2026
72 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Wednesday 4 November at 12:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 15 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now