How to bid in this country: portals, deadlines, thresholds →
Ongoing maintenance of roads: district, municipal and internal roads located in the Koluszki Commune.
Bieżące utrzymanie dróg: powiatowych, gminnych oraz wewnętrznych położonych na terenie Gminy Koluszki. — original title
Your path to submission
- Deadline: 3 November at 10:30 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1) The subject of this contract is the ongoing maintenance of roads: district, communal and internal located in the Koluszki Commune. II. The detailed scope of work includes: 1) Partial repair of asphalt pavements with mineral-bituminous mass cutting at a loss depth of 6 cm on average, 2) Flooding of gaps, cracks, dilation in bituminous and concrete pavement with hot asphalt, 3) Interventional protection by supplementing the loss on the road, a street with paved and unpaved pavement posing a direct threat to road traffic within 2 hours of notification, 4) Interventional removal of road hazards in the form of broken trees, branches, tires and other parts or loads left in the road lane with disposal 5) Cutting with a saw of bituminous pavement with a thickness of 5 -15 cm, 6) Partial renovation in oil roads to a loss depth of 10 cm. Material of the Contractor. 7) Milling of bituminous…
Show full description
… surface with road milling machine gr. 5 -10 cm. Material from demolition owned by the Ordering Party. Loading and removal of destruction for a distance of up to 10 km. 8) Partial repair of defects (Pacher ) 9) Single surface fixation of roads with emulsion and grits. Modified emulsion, basalt grits 2/5 washed 10) Double surface fixation of pathways with emulsion and grits. Modified emulsion, basalt grits 2/5 washed, 11) Making a leveling layer of bituminous mass with a thickness of 1 cm - up to 2 cm. 12) Making a bituminous overlay by sprinkling the road surface with asphalt and laying the surface of mineral and bituminous mixtures with a thickness of 5 cm. Surface for the CoR-3 movement. 13) Laying of paving stone surface with a thickness of 8 cm (Brick pattern 10 cm x 20 cm ) on sand ballast with sand-filled joints. Material of the Contractor (type of cube approved by the Ordering Party), 14) Mechanical compaction of the substrate for the substructure, 15) Execution of the substructure by carrying out an engraving to a depth of 40 cm, a drainage layer with a thickness of 20 cm, stone crushed substructure (dolomite or other hard rock) with a thickness of 20 cm after compaction along with the export and disposal of excavated material, 16) Execution of the substructure with a mixture of soil stabilized with cement with a thickness of 20 cm, 17) Execution of an additional layer of crushed substructure with a thickness of 10 cm (execution for doubtful land), 18) Replacement of damaged concrete curbs (15 cm x 30 cm x 100 cm) on a concrete bench with resistance. Material of the Contractor, 19) Replacement of damaged submerged concrete curbs (15 cm x 22 cm x 100 cm ) on a concrete bench with resistance. Material of the Contractor. 20) Replacement of damaged submerged concrete curbs (20 cm x 30 cm x 100 cm ) on a concrete bench with resistance. Material of the Contractor 21) Replacement of damaged arrangement of new paving edges (8 cm x 30 cm x 100 cm ) on cement-sand ballast in a ratio of 1:3. Material of the Contractor, 22) Renovation of the surface made of YOMB boards with dimensions (75 cm x 100 cm x 12.5 cm) or (100 cm x 175 cm x 12.5 cm) along with arranging, laying of new boards. Welds filled with sand - contractor's material, 23) Laying road plates: 3000 mm x 1000 mm; 3000mm x 1500 mm reinforced concrete with the construction of a substructure (15 cm stabilization 5 Mpa, gravel ballast 10 cm on the surfaces of arches and extensions of roads and temporary roads 24) Installation of sewage trays with length dimensions. 50 cm x width. 60 cm x 15 cm. on a concrete bench Execution and material of the Contractor, 25) Replenishment of damaged shoulders from the destruction of gr. 15 cm after a stroke using a spreader to the shoulders. Material of the Contractor 26) Execution of the shoulder from the stone rope using a spreader for the shoulders. Layer thickness 15 cm after punching. Material of the Contractor. 27) Installation in the bituminous surface of linear drainage with load class D 400. Material Contractor, 28) Repair of the Ø 1200 mm inspection well with a depth of up to 3.5 m from the new material. Carrying capacity of cover and hatch 40 tons. Material of the Contractor. 29) Renovation of the rainwater sewerage channel along with
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (70 awards, most recently August 2026) — by that rhythm the next award was due around October 2026. The last award went to Budownictwo Ogrodnik Sp. z o.o.n = 70
- 27% of this buyer's awards went to companies that had already won here before (169 awards since 2015, spread over 115 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 169 awards since 2015
- The median procedure drew 3 bids (33 procedures with a bid count); 18% ended with a single bidder. Sector: median 5 bids.n = 33
- The award came in at a median 103% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 13
- 1% of awards went to companies from abroad (169 awards with a known winner country). Sector average: 0%.n = 169
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Budowlano – Drogowe BUD- DROG Stanisława Polus | 11 | 2021–2026 |
| Firma NEDAP Sebastian Polus | 9 | 2021–2025 |
| Civil Construction Sp. z o.o. | 6 | 2021–2026 |
| Poczta Polska S.A. | 5 | 2022–2025 |
| EL - MOT Józef Znojek | 3 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 4 completed awards — not a statement about this procedure.)
This procedure allows 15 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now