How to bid in this country: portals, deadlines, thresholds →
Reconstruction of municipal roads in Opatówek II Commune
Przebudowa dróg gminnych na terenie Gminy Opatówek II — original title
Your path to submission
- Deadline: 2 November at 09:45 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The scope of works includes: - measuring works - vertical adjustment of equipment - earthworks - repair of road culverts - ditch resurfacing - surface works - finishing works - roadsides - vertical markings - as-built inventory The detailed scope of works is included in the Design Documentation. Where trade marks, patents or origins, a source or a specific process characterising the products or services provided by a particular economic operator appear in the materials describing the subject-matter of the contract, such indication shall be understood to be accompanied by the words or an equivalent .. The Ordering Party accepts equivalent materials and/or solutions provided that the technical, quality and performance parameters are not inferior to those indicated in the documentation and do not lead to a change in technology. The names indicated in the documentation should be taken as…
Show full description
… examples. By describing the subject of the contract by reference to standards, technical assessments, technical specifications and technical reference systems, the Contracting Authority accepts solutions equivalent to those described. The contracting authority may not reject a tender on the sole ground that the works, supplies or services offered do not comply with the standards, technical assessments, technical specifications and technical reference systems to which the description of the subject-matter of the contract refers, provided that the Contractor proves that the solutions proposed satisfy in an equivalent manner the requirements set out in the description of the subject-matter of the contract. The Contractor who invokes equivalent solutions is obliged to demonstrate that the solution offered by him meets the requirements specified by the Contracting Authority. In this case, the Contractor shall attach to the tender a list of equivalent solutions together with its description or standards. The Contractor shall, at his own expense, execute, agree on and approve the traffic management project for the duration of the works, in accordance with the provisions in force. The Contractor shall ensure the temporary marking, its maintenance and dismantling. 2. The scope of works includes: - preparatory works - vertical adjustment of devices - demolition works - vertical adjustment of devices - roadway with asphalt surface - curbs and rims - descents - finishing works - vertical and horizontal markings - as-built inventory The detailed scope of works is included in the Design Documentation. Where trade marks, patents or origins, a source or a specific process characterising the products or services provided by a particular economic operator appear in the materials describing the subject-matter of the contract, such indication shall be understood to be accompanied by the words or an equivalent .. The Ordering Party accepts equivalent materials and/or solutions provided that the technical, quality and performance parameters are not inferior to those indicated in the documentation and do not lead to a change in technology. The names indicated in the documentation should be taken as examples. By describing the subject of the contract by reference to standards, technical assessments, technical specifications and technical reference systems, the Contracting Authority accepts solutions equivalent to those described. The contracting authority may not reject a tender on the sole ground that the works, supplies or services offered do not comply with the standards, technical assessments, technical specifications and technical reference systems to which the description of the subject-matter of the contract refers, provided that the Contractor proves that the solutions proposed satisfy in an equivalent manner the requirements set out in the description of the subject-matter of the contract. The Contractor who invokes equivalent solutions is obliged to demonstrate that the solution offered by him meets the requirements specified by the Contracting Authority. In this case, the Contractor shall attach to the tender a list of equivalent solutions together with its description or standards. The Contractor shall, at his own expense, execute, agree on and approve the traffic management project for the duration of the works, in accordance with the provisions in force. Contractor provides temporary signage, its ut
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (71 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Hurtownia Materiałów Budowlanych DONBUD BIS Piotr Marciniak.n = 71
- The median procedure drew 2 bids (6 procedures with a bid count); 17% ended with a single bidder. Sector: median 5 bids.n = 6
- 52% of this buyer's awards went to companies that had already won here before (110 awards since 2015, spread over 46 companies). 48% went to new names.n = 110 awards since 2015
- 3% of awards went to companies from abroad (110 awards with a known winner country). Sector average: 0%.n = 110
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 28/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ROL DÓG Zakład Usługowo - Produkcyjny, Roboty Drogowo - Budowlane Rafał Świątek | 12 | 2021–2026 |
| Firma Usługowo Handlowa JARTEX Szczepan Jarantowski | 9 | 2015–2025 |
| Wojciech Krymarys DROMAX usługi drogowo-budowalne | 8 | 2021–2025 |
| Ecotarget Jakub Łyś | 7 | 2022–2025 |
| Roman Chmara „KAREX” Przedsiębiorstwo Drogowo Inżynieryjne | 7 | 2021–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 17 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now