Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Modernisation of Witosa side street in Bestwina

Modernizacja ul. Witosa bocznej w Bestwinie — original title

PLPoland · BestwinaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 2 November at 09:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

The subject of the contract is the modernization of ul. Side Vitosa in Bestwina. The road will follow the existing trail. The surface layers, i.e. the bonding layer made of AC 16W asphalt concrete and the abrasive layer made of AC 11S asphalt concrete, are planned to be made. A support will be made of broken aggregate and a layer of separation geotextile will be laid. As regards the works, it is envisaged to renovate the existing fortified ditch, which will consist in replacing the damaged concrete elements – openwork slabs together with the cleaning of the ditch. As part of the task, damaged culvert pipes will also be replaced with new pipes without changing the parameters and dimensions – it concerns existing culverts to the . buildings Key figures: - length of the repaired section 171.57 m - width of the carriageway 3.00-4.20 m - width of the shoulder 0.50 m The subject of the order…

Show full description

… is described in detail in nin. ToR and Annex 8 to the ToR – Design Documentation, SST. The contractor is obliged to check the parameters given in the description of the subject of the contract and include in the tender the scope resulting from the design documentation and the technical specifications for the execution and acceptance of the works. The contractor is obliged to properly manage the waste generated as a result of the implementation of the subject of the contract and to comply with the rules of environmental protection (including preventing the generation of waste, reducing its quantity and negative impact on the environment, ensuring its recovery and proper disposal).

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published16 Oct 2026

Type of service

45 · Construction work
CPV 45233100-0 · 45111300-1 · 45100000-8

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 3 months (36 awards, most recently June 2026) — by that rhythm the next award was due around September 2026. The last award went to TIMBUD Krzysztof Krzesiński.n = 36
  • The median procedure drew 2 bids (7 procedures with a bid count); 14% ended with a single bidder. Sector: median 5 bids.n = 7
  • 57% of this buyer's awards went to companies that had already won here before (148 awards since 2018, spread over 60 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 148 awards since 2018
  • Across 3 procedures with structured selection criteria, this buyer most often required: Equipment, plant and technical facilities (3 of 3), References: services (3 of 3), Trade register enrolment (3 of 3).n = 3
  • Not one of the 148 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 148

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
The Russia sanctions declaration (Art. 5k) comes with nearly every procedure — a formality, but missing it means exclusion.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
P.P.H."Błażej" Błażej Firganek182021–2026
Piekarnia Ko-Ga s.c. Korczyk Renata, Grabowska Elżbieta112021–2026
PPHU Zakład Masarski s.c. Stanisław Ośliźlok, Henryka Ośliźlok102021–2026
VEGEMAR Marcin Kaszper92022–2025
FIRMA PRODUKCYJNO HANDLOWO USŁUGOWA „BYSTROWSCY” MAREK BYSTROWSKI72021–2024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

6
2021
10
2022
6
2023
6
2024
5
2025
9
2026
42 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 2 November at 09:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 17 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now