Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Reconstruction of the sanitary and rainwater sewerage connection in plot no. 183/5 in Maków Mazowiecki

Przebudowa przyłącza kanalizacji sanitarnej i deszczowej na terenie działki nr ewid. 183/5 w Makowie Mazowieckim — original title

PLPoland · Maków MazowieckiBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 2 November at 10:00 — 1 day left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Reconstruction of the sanitary and rainwater sewerage connection on the plot No. ewid. 183/5 in Maków Mazowiecki as part of the task entitled: ‘Improvement of energy efficiency, including conversion and change of use of part of the boarding house of the District Office in Maków Mazowiecki into an administrative and office building’. A detailed description of the subject-matter of the contract is contained in the executive design, the bill of quantities and the technical specifications for the execution and acceptance of construction works (STWiOR), which are annexed to the tender specifications.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published16 Oct 2026

Type of service

45 · Construction work
CPV 45000000-7 · 45231300-8

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 12 months (4 awards, most recently September 2026) — the next award is due around September 2027 by that rhythm. The last award went to Usługi Ogólnobudowlane i Remontowe.n = 4
  • 5% of this buyer's awards went to companies that had already won here before (43 awards since 2015, spread over 32 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 43 awards since 2015
  • The median procedure drew 3 bids (8 procedures with a bid count); 25% ended with a single bidder. Sector: median 5 bids.n = 8
  • 14% of awards went to companies from abroad (43 awards with a known winner country). Sector average: 0%.n = 43

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Too big for you alone? Consortium or reliance on capacity: a partner's references and turnover count (Art. 63 Dir. 2014/24) — cross-border too.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
„ARAN” SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ W WYSZKOWIE SPÓŁKA KOMANDYTOWA22024–2025
STACJA DEPTUŁA Sp. z o.o.22022–2026
Firma Handlowa JOL-MET sp. z o.o.12025
MEBLOWO.EU MATEUSZ GMAJ12026
SALTUS TOWARZYSTWO UBEZPIECZEŃ WZAJEMNYCH12024
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

3
2022
1
2024
1
2025
3
2026
8 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 2 November at 10:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 17 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now