Construction of a bicycle path at ul. Podgórna in Stęszewo and Witoblu
Budowa ścieżki rowerowej na ul. Podgórnej w Stęszewie i Witoblu — original title
Your path to submission
- Deadline: 3 November at 09:25 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
Construction of ul. Construction of a bicycle path on ul. Podgórna in Stęszewo and Witoblu. The task is carried out as part of the project entitled: ‘Sustainable urban mobility in the Poznań Metropolis – Stage III (part 2)’, which was selected for funding under the European Funds for Wielkopolska 2021-2027 Programme. The Contractor shall carry out all the work necessary for the proper performance of the subject-matter of the contract. The works should be carried out in accordance with the tender documentation and in agreement with the Ordering Party. In addition, the scope of work includes: 1) preparation of full documentation – 2 copies in Polish, consisting of: a) As-built documentation: b) Material and prefabrication approvals, c) instructions for operation, maintenance and operation of equipment 2) Work acceptance protocols. 3) required documents concerning the tests, measurements…
Show full description
… and checks carried out by the Contractor, Technology of execution of works: Works related to the execution of the investment should be carried out in accordance with applicable standards, building law regulations, legal regulations regarding technical requirements, environmental protection, in accordance with health and safety rules and technical knowledge. All materials used must have appropriate approvals, approvals and certificates and comply with applicable Standards. In addition, each material used should be agreed with the Ordering Party, the lack of the above-mentioned agreement will result in replacement for the appropriate, the cost of replacement will be fully borne by the Contractor. If the Contractor does not comply with the instructions, the Contracting Authority will subcontract the above activities to a third party and deduct the costs incurred by it from the Contractor's remuneration, and if this amount proves to be insufficient, it will claim its reimbursement under the general rules. If material indications for a specific producer/names of producers and products appear in the bill of quantities or specifications, they should be read as examples serving only to clarify the subject matter of the contract. The Ordering Party allows the use of materials, solutions, technologies and equivalent standards with technical, construction and performance parameters not inferior to those assumed in the technical specification for the execution and acceptance of construction works and design documentation. The Ordering Party requires the submission of relevant documents that authenticate these materials. The Contractor shall, under his own responsibility and at his own expense, take all preventive measures required by sound construction practice and current circumstances in order to safeguard the rights of the owners of the property adjacent to the construction site/works and to avoid causing any disturbance or damage there. The Contractor shall be liable for any damage resulting from the performance of the subject matter of the contract vis-à-vis third parties. The surrounding area as well as pedestrian and wheel traffic should be permanently protected against the impact of works. Social clause: The contracting authority requires that persons performing the services and construction works specified in the project documentation and equipment operators be employed on the basis of an employment contract by the Contractor or a subcontractor, with the exception of persons whose duties do not consist in performing works in the manner specified in Article 22(1) of the Labour Code of 26 June 1974 (Journal of Laws 2023.1465, consolidated text, of 2023.07.31), which may concern, inter alia, the construction manager and sectoral works managers. Each time at the request of the Ordering Party, within the period indicated by the Ordering Party not shorter than 5 working days, the Contractor undertakes to submit for inspection copies of employment contracts concluded by the Contractor with Employees providing services / construction works. Failure by the Contractor to submit copies of contracts concluded by the Contractor with Employees providing services / construction works within the time limit indicated by the Ordering Party in accordance with point. 2 will be treated as non-fulfilment of the obligation to employ Employees providing services / construction works on the basis of an employment contract. For failure to comply with the employment requirement
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (52 awards, most recently May 2026) — by that rhythm the next award was due around July 2026. The last award went to Eurovia Polska S.A. Bielany Wrocławskie ul. Irysowa 1, 55-040 Kobierzyce NIP: 635-000-01-27.n = 52
- The median procedure drew just one bid (6 procedures with a bid count); 50% ended with a single bidder. Sector: median 5 bids.n = 6
- 34% of this buyer's awards went to companies that had already won here before (110 awards since 2018, spread over 69 companies). 66% went to new names.n = 110 awards since 2018
- Not one of the 110 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 110
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Smolgaz Grażyna Smolibowska ul. Błażejewska 47B 62-035 Kórnik NIP:7851262146 | 6 | 2021–2025 |
| EUROVIA Polska S.A. Bielany Wrocławskie, ul. Irysowa 1, 55-040 Kobierzyce | 6 | 2021–2026 |
| Zakład Budowy I Utrzymania Dróg Robert Ziemecki | 5 | 2022–2025 |
| BRIKBAU ANNA NOWACKA | 4 | 2022–2025 |
| Zakład Drogowo-Budowlany NOJAN Jan Nowak | 4 | 2021–2024 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 18 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now