How to bid in this country: portals, deadlines, thresholds →
Energy efficiency of public buildings in the Municipality of Milicz: primary schools in Dunkowa and Wziąchowo Wielkie
Efektywność energetyczna obiektów użyteczności publicznej w Gminie Milicz: szkoły podstawowe w miejscowości Dunkowa oraz Wziąchowo Wielkie — original title
Your path to submission
- Deadline: 10 November at 10:00 — 9 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. Subject of the contract: Investment: Energy efficiency of public utility buildings in the municipality of Milicz: primary schools in Dunkowa and Wziąchowo Wielkie. Project entitled Energy efficiency of public utility buildings in the municipality of Milicz: primary schools in Dunkowa and Wziąchowo Wielkie, implemented under the European Funds for Lower Silesia 2021-2027 Strategy of the Other Territorial Instrument of the Southern Wrocław Subregion. Part 1: Reconstruction of a public building in Wziąchowo Wielkie – Primary School in Wziąchowo Wielkie. LOCATION: J.E. MILICZ, GREAT TREATMENT, AM1, DZ. 52/1 and 52/2 The subject of the construction project is the thermal modernisation of the Wanda Rutkiewicz Primary School in Wziąchów Wielkie. Scope of works: • Creation of a concrete band around buildings; • Execution of waterproofing and thermal insulation of foundation walls; • Execution…
Show full description
… of thermal insulation of external walls; • Replacement of window and door joinery and interior and exterior window sills; • Thermal insulation of ceilings; • Thermal insulation and replacement of roofing material; • Replacement of gutters and drain pipes; • Retrofitting of internal central heating, domestic heating and ventilation systems; • Installation of ground heat pump; • Installation of photovoltaic panels; • Renovation of existing chimneys; • Execution of visors above the entrances; • Renovation of internal stairs and entrance platforms; • Demolition of the smoke chimney with documentation and arrangements in this regard; • LPG storage system with a capacity of 4,85m3 with internal and external gas installation; • Internal electrical installations, surge protection, electric shock protection. The exact scope of both investments can be found in the documentation prepared by the project unit: SAN-KLIM Sp. z o.o. ul. Henryk Siemiradzki 16, 33-300 Nowy Sącz (which constitute Annex No. 12 to the Specifications). Solutions in the sanitary and electrical industry should be considered according to the documentation from 2026 due to the update of solutions. In addition, the scope of both investments includes: - decommissioning – dismantling of part of an existing installation (including air-conditioning), - finishing, repair and restoration works as part of thermal modernisation. - commissioning of the installation, training of employees in the field of operation, completion of all formalities necessary for the proper functioning of the installation. ADDITIONAL CONDITIONS FOR THE IMPLEMENTATION OF THE CONTRACT AND THE HARMONOGRAMMING OF WORK: 1. Implementation of works in the facility in use (active school). The Contractor acknowledges that all construction and assembly works will be carried out in an active school facility where didactic and educational activities take place. The implementation of the investment must not interfere with the work of the school, and the Contractor is obliged to take this fact into account when drawing up a detailed material and financial schedule. 2. Replacement of external joinery. Works related to the disassembly and installation of window and door joinery should be planned and absolutely carried out during periods free of lessons or days and hours agreed with the school management. 3. Modernisation of the heating system. All work related to the heating installation, including the replacement of radiators, risers or modernisation of the heat hub, must be carried out outside the heating season. These works must not in any way disturb the thermal comfort of students and employees or lead to underheating of the building during the school year. 4. Logistical requirements and safety of students and staff (OSH). * The Contractor is obliged to coordinate activities with the management of the facility, ensure safe communication routes for users and appropriate security and fencing of the work area. * The work area and transport routes for materials must be completely fenced and protected against access by children and bystanders. * Particularly cumbersome work (noisy, dust-generating or
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (63 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Michał Grygiel – Firma Ogólnobudowlana.n = 63
- The median procedure drew 2 bids (27 procedures with a bid count); 26% ended with a single bidder. Sector: median 5 bids.n = 27
- 50% of this buyer's awards went to companies that had already won here before (140 awards since 2015, spread over 63 companies). 50% went to new names.n = 140 awards since 2015
- 1% of awards went to companies from abroad (140 awards with a known winner country). Sector average: 0%.n = 140
- 90% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 84%.n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwa Gospodarki Komunalnej „Dolina Baryczy” sp. z o.o. | 21 | 2022–2026 |
| GM Snadna Witkowska Sp. J. | 18 | 2021–2026 |
| DAMPOL-BUD Damian Kmieciak | 7 | 2023–2026 |
| Milickie Stowarzyszenie Przyjaciół Dzieci i Osób Niepełnosprawnych | 5 | 2022–2025 |
| EL - SPID Sławomir Jaworski | 4 | 2025–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 25 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now