How to bid in this country: portals, deadlines, thresholds →
Construction of a 40 kW wind micro-installation with associated infrastructure in Komorniki Commune
Budowa mikroinstalacji wiatrowej o mocy 40 kW wraz z infrastrukturą towarzyszącą w Gminie Komorniki — original title
Your path to submission
- Deadline: 6 November at 10:00 — 5 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the preparation of design documentation on the basis of the Functional and Utility Programme (hereinafter: PFU) and the construction of a stationary roofed ice rink with dimensions of 26 m × 60 m, together with infrastructure and land development on plot No 2006 (before division 618/107), the Plewiska district, the Komorniki municipality, the Poznań district in the ‘design and build’ formula. 2. The ice rink should be made in a steel structure with an arched roof and PVC tent coating, with a rink surface measuring 20 m × 40 m in the technology of a frosted concrete slab with removable bands. 3. The detailed scope of works in accordance with which work must be carried out is set out in the Functional and Utility Programme, which constitutes Annex 1 to the contract. 4. The Contractor's duties include, among others, performing detailed ground tests, making…
Show full description
… arrangements with experts in sanitary and hygienic matters, fire safety, health and safety at work, at the stage of execution of construction and executive projects, agreeing with the Ordering Party all functional, aesthetic, material and technical solutions consistent with the provisions of the PFU and separate regulations and guidelines related to the subject of the contract, submitting the complete design documentation to the Ordering Party for acceptance before submitting it to the office for obtaining a building permit, as well as obtaining appropriate approvals and permits in accordance with applicable law in the scope related to the planned project. 5. The design documentation should include, in particular, the following studies: - architectural design (construction, technical/executive design), - structural design (construction, technical/executive design), - road design including the construction of internal communication and parking lots (construction, technical and executive design), - sanitary installations design (construction, technical/executive design), - external network projects (construction and execution design), - electrical installations design (construction, technical/executive design), - telecommunication installations design (construction, technical/executive design), - fire protection installations design (construction, technical/executive design), - investor's cost estimates, - BIOZ information, - other engineering studies, if required to perform the task. 6. The Contractor's task will also be to make a geodetic inventory, provide specialist supervision, construction insurance, obtain a valid building permit, prepare as-built documentation in 2 copies in paper and electronic version on a flash drive and hand it over to the Ordering Party, perform author's supervision over construction works carried out on the basis of developed design documentation, acceptance of objects with external services. 7. The scope of works also includes submitting a notification of completion of construction works to the Construction Supervision Authority, as well as obtaining an occupancy permit from the District Building Supervision Inspector for the Poznań district. 8. The task is co-financed by the Physical Culture Development Fund, which is managed by the Minister of Sport and Tourism as part of the ice rink construction program - Edition 2025. 9. A detailed description of the terms of performance of the subject-matter of the contract is contained in the draft provisions of the contract, which are attached as Annex 8 to the ToR. 10. The Contractor is obliged for the entire period for which the Contract will be concluded to have civil liability insurance in respect of activities related to the subject of the contract for a guarantee amount of not less than PLN 7 000 000.00 valid not later than from the date of handing over the construction site until final acceptance. The Ordering Party will accept the civil liability insurance document held by the Contractor in the scope of activities related to the subject of the contract for the amount of the guarantee required by the Ordering Party, which will be
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (122 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Projprzem Budownictwo Sp. z o.o.n = 122
- The median procedure drew just one bid (15 procedures with a bid count); 53% ended with a single bidder. Sector: median 5 bids.n = 15
- 41% of this buyer's awards went to companies that had already won here before (244 awards since 2019, spread over 137 companies). 59% went to new names.n = 244 awards since 2019
- The award came in at a median 100% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 5
- Not one of the 244 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 244
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Pomagamy24h.pl Sp. z o.o. | 10 | 2022–2026 |
| Przedsiębiorstwo Usług Komunalnych Komorniki Sp. z o.o. | 8 | 2022–2026 |
| KOST-BUD PIOTR DRUCHLIŃSKI | 7 | 2022–2025 |
| Izbruk Maciej Rybicki Zakład Ogólnobudowlany | 7 | 2022–2024 |
| BUD-AN Sp. z o. o. | 6 | 2022–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now