How to bid in this country: portals, deadlines, thresholds →
Replacement of lighting fixtures and lighting projectors in sports and recreational complexes, renovation of street lighting in the municipality of Michałowice
Wymiana opraw oświetleniowych oraz projektorów oświetleniowych na terenach kompleksów sportowo rekreacyjnych, remont oświetlenia ulicznego na terenie gminy Michałowice — original title
Your path to submission
- Deadline: 5 November at 12:30 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. PART I a) Task 1 Replacement of lighting - recreation and sports area at ul. Rural in m.Rules: The scope of construction works includes, among others: • replacement of existing park luminaires with LED luminaires equipped with two encapsulated sockets in the Zhaga standard (mounting at the top and bottom of the luminaire) with controllers enabling full control and control of the luminaires – 29 pcs. h=4m, • replacement of existing projectors with LED projectors – 12 pcs. h=9m • replacement of pole plates and instrumentation b) Task 2 Replacement of projectors on the pitch complex in Sokołów: The scope of construction works includes, among others: • replacement of existing projectors with LED projectors – 22 pcs. h=14m • replacement of existing projectors with LED projectors – 4 pcs. h=9m • replacement of pole plates and tooling 4. The full scope of the subject of the contract is…
Show full description
… specified in: For Part l: for Zad. 1) Design documentation, STWiOR and a bill of quantities constituting Annexes 1, 2, 3 for Zad. 2) Design documentation, STWiOR and bill of quantities constituting annexes no. 4, 5, 6 2. 2) PART II a) Task 1 Renovation of lighting in m. Granica ul. Dębowa i Filmowa The scope of construction works includes, among others: • - replacement of existing lighting poles with foundations for stylised steel park lanterns and LED park luminaires — 28 pcs. • - installation of luminaires equipped with one encapsulated socket in the Zhaga standard (mounting at the top) with controllers enabling a full range of control and control of luminaires. • - replacement of luminaires on the overhead line - 6 pcs. • - installation of luminaires equipped with two encapsulated sockets in the Zhaga standard (mounting at the top and bottom of the luminaire) with controllers enabling a full range of control and control of lighting luminaires. The full scope of the subject of the contract is specified in: for Part II: for Zad. 1) Design documentation, STWiOR and the bill of quantities constituting Annexes 1, 2, 3 3. PART III a) Task 1 Replacement of lighting - at ul. Kamelskiego and ul. Polna in Nowa Wieś The scope of construction works includes, among others: - replacement of 22 existing luminaires for LED luminaires (ul. Kamelskiego) installation on the poles of the overhead line PGE Dystrybucja S.A. — 4xAL50+AL25 — replacement of 39 existing luminaires with LED luminaires (ul. Field) installation on the poles of the overhead line PGE Dystrybucja S.A. — 4xAL50+AL25 — installation of luminaires equipped with two encapsulated sockets in the Zhaga standard (mounting at the top and bottom of the luminaire) with controllers enabling full control and control of lighting luminaires. The full scope of the subject of the contract is specified in: for Part III: for Zad. 1) Design documentation, STWiOR and bill of quantities constituting Annexes 1, 2, 3.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (194 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to WALKOR Sp. z o.o.n = 194
- The median procedure drew 2 bids (24 procedures with a bid count); 38% ended with a single bidder. Sector: median 5 bids.n = 24
- 33% of this buyer's awards went to companies that had already won here before (400 awards since 2015, spread over 248 companies). 67% went to new names.n = 400 awards since 2015
- 2% of awards went to companies from abroad (400 awards with a known winner country). Sector average: 0%.n = 400
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| ZAKŁAD USŁUG ROLNICZYCH I BUDOWLANYCH "AGROBUD" WIESŁAW NOWAKOWSKI | 12 | 2021–2026 |
| Spółdzielnia Kółek Rolniczych w Michałowicach | 10 | 2022–2025 |
| Kruszywosort PPHU Wiktor Siadaczka | 8 | 2022–2025 |
| MULTIPLANTA Katarzyna Łazucka-Cegłowska | 7 | 2022–2026 |
| Zakład Usług Terenowych Budowlanych i Porządkowych Margot Małgorzata Szymańska w spadku | 7 | 2021–2022 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 20 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now