Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Extension of ul. Nowogranicka in Granica

Rozbudowa ul. Nowogranickiej w Granicy — original title

PLPoland · RegułyBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 3 November at 12:00 — 2 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the contract is the construction of a road system in the area of intersection with ul. Sporty, with the end of the descent to the plot No. ewid. 101/8, which is a link to a separate development of the crèche under construction. The length of the road section under construction is about 124 m. The project assumes the end of the road with a turning square, from which the exit to the crèche project is led. The task includes the construction of the municipal road Nowogranicka Street and the exit to the planned new crèche, which provides for the construction of a road with a width of 5.50 m, intended for two-way traffic. Along the street, a 2.30 m wide pedestrian road was designed on one side with a pedestrian crossing through Sportowa street. The contractor is obliged to carry out the works in a way that ensures accessibility for persons with disabilities. In particular,…

Show full description

… walkways, curbs, pedestrian crossings and pavements must comply with the requirements of technical and construction regulations and the Act on ensuring accessibility for people with special needs, ensuring safe and convenient use for all users. 2. The Contractor shall provide the Ordering Party with a quality guarantee for the work performed and the materials used for a period of not less than 48 months counted from the date of final acceptance of the subject of the contract. The guarantee period is one of the criteria for evaluating offers. 3. Within the scope of the warranty and guarantee, the costs related to all repairs and repairs of defects will be borne by the Contractor. 4. A detailed description of the guarantee and warranty can be found in the Draft Agreement constituting Annex 3 to the ToR. 5. In order to properly prepare the tender, the Ordering Party recommends and recommends that the Contractor carry out an on-site inspection to obtain the necessary information as to the risks, difficulties and any other circumstances that may affect the performance of the subject of the contract. The cost of the on-site visit shall be borne by the Contractor. Details of the optional on-site visit can be found in Chapter III of the ToR.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published16 Oct 2026

Type of service

45 · Construction work
CPV 45233120-6 · 45111300-1 · 45232000-2 · 45111000-8 · 45233000-9 · 45233221-4 · 45233290-8 · 45232410-9

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (194 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to WALKOR Sp. z o.o.n = 194
  • The median procedure drew 2 bids (24 procedures with a bid count); 38% ended with a single bidder. Sector: median 5 bids.n = 24
  • 33% of this buyer's awards went to companies that had already won here before (400 awards since 2015, spread over 248 companies). 67% went to new names.n = 400 awards since 2015
  • 2% of awards went to companies from abroad (400 awards with a known winner country). Sector average: 0%.n = 400

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
You don't need a GmbH or Ltd for this procedure — sole traders and freelancers may bid (Art. 19 Dir. 2014/24/EU). Eligibility counts, not legal form. More in the guide →

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
ZAKŁAD USŁUG ROLNICZYCH I BUDOWLANYCH "AGROBUD" WIESŁAW NOWAKOWSKI122021–2026
Spółdzielnia Kółek Rolniczych w Michałowicach102022–2025
Kruszywosort PPHU Wiktor Siadaczka82022–2025
MULTIPLANTA Katarzyna Łazucka-Cegłowska72022–2026
Zakład Usług Terenowych Budowlanych i Porządkowych Margot Małgorzata Szymańska w spadku72021–2022
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

30
2021
52
2022
44
2023
43
2024
51
2025
43
2026
263 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Tuesday 3 November at 12:00

Tactics

When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)

This procedure allows 18 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now