How to bid in this country: portals, deadlines, thresholds →
Renovation of the chapel at the Municipal Cemetery in Szczecinek
Remont kaplicy na Cmentarzu Komunalnym w Szczecinku — original title
Your path to submission
- Deadline: 5 November at 10:00 — 4 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is performance in accordance with the description of the subject of the contract, technical specifications for the execution and acceptance of construction works, regulations, including technical and construction and the principles of technical knowledge and construction art, the following scope of works: Execution and commissioning of the investment provided for in the Agreement entitled: ‘Renovation of the chapel at the Municipal Cemetery in Szczecinek’ and removal of its defects, found during the execution of construction works and during the warranty period for physical defects and quality guarantees, which will be able to perform its own economic or technical function to the extent specified in: 1) description of the subject of the contract (OPZ), 2) STWiORB, 3) bills of quantities – in the alternative, subject to para. 3. 2. Detailed scope of works…
Show full description
… referred to in para. 1 defines the description of the subject of the contract and the technical specifications for the execution and acceptance of construction works constituting Annex 1 and Annex 7 to this tender specification. 3. The bills of quantities submitted to the tender specifications are only information material and do not constitute a summary of the planned works and the anticipated costs associated with the performance of the subject-matter of the contract. Works not included in bills of quantities and appearing in or resulting from the description of the subject-matter of the contract are not additional works. In the event of a discrepancy between the bill of quantities and the description of the subject-matter of the contract, the above is decisive for determining the scope of the works. OPZ. The contractor may not demand payment of additional remuneration if, at the stage of implementing the investment, it turns out that it did not take into account the elements described in the above-mentioned document. 4. The subject of the Contract executed by the Contractor and delivered to the Ordering Party shall be fully in accordance with the Contract and shall meet the needs for which it is intended. 5. Economic operators may submit an equivalent technical proposal by clearly indicating in the tender, in a separate annex, the amended items, in which case they must provide all the information necessary for a complete assessment of the equivalent solution by the contracting authority, since it is for the economic operator to prove the equivalence of the content of the tender submitted. The trademarks, patents or origins used in the design documentation are exemplary and are intended only to indicate the quality standard and technical parameters for achieving the expected functionality of the entire system, not worse than those referred to in the documentation.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (58 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to ECO PROJECT MARINE ZBIGNIEW SZYMANSKI.n = 58
- 22% of this buyer's awards went to companies that had already won here before (107 awards since 2021, spread over 76 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 107 awards since 2021
- The median procedure drew 2 bids (7 procedures with a bid count); 43% ended with a single bidder. Sector: median 5 bids.n = 7
- 3% of awards went to companies from abroad (107 awards with a known winner country). Sector average: 0%.n = 107
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Budowa i Utrzymanie Dróg „EKO BUD” Piotr Bańkiewicz | 5 | 2022–2024 |
| POL-DRÓG S.A. | 4 | 2021–2023 |
| Energa Oświetlenie Sp. z o.o. | 3 | 2022–2023 |
| Energooszczędne Systemy Oświetleniowe "LUKSus" Leszek Czukowicz | 3 | 2023–2026 |
| "Znak-Pol" Sławomir Zienkiewicz, Ryszard Butkiewicz Spółka Jawna | 3 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now