How to bid in this country: portals, deadlines, thresholds →
Development of the area after the former Jordan Garden
Zagospodarowanie terenu po dawnym Ogródku Jordanowskim — original title
Your path to submission
- Deadline: 2 November at 09:00 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. Name of the contract: Development of the area after the former Jordan Garden. 2. The subject of the contract includes land development after the former Jordan Garden. The detailed scope of the works and the manner of their execution is specified in the design documentation, the bill of quantities and the technical specifications for the execution and acceptance of the works, drawn up for the purposes of this contract and constituting Annex 7 to these Specifications. 3. The minimum guarantee period required by the contracting authority is 3 years. The Contractor’s tender, which proposes a guarantee period of less than 3 years, will be rejected as incompatible with the tender specifications. 4. If the Contractor does not indicate any warranty period in the Tender Form (i.e. leaves an empty declaration regarding the offered warranty period for the entire subject of the contract), he will…
Show full description
… receive 0 (zero) points in the criterion "Warranty period" , and the Ordering Party will assume that the Contractor offers 3 years of warranty for the executed subject of the contract from the date of final acceptance. 5. In accordance with Article 102(1) CTMR, 1 of the Public Procurement Act, the Contracting Authority informs that the requirements referred to in the above-mentioned provision were specified by the Contracting Authority in the design documentation, bills of quantities and in the technical specifications for the execution and acceptance of construction works constituting Annex 7 to these specifications. 6. If the Ordering Party has indicated in the description of the subject of the contract trademarks, patents or origins, sources or a specific process that characterizes products or services provided by a specific Contractor, it is permissible to offer solutions equivalent to those described, provided that they maintain the same minimum technical, quality and functional parameters, etc. 7. The Contractor who invokes equivalent solutions is obliged to demonstrate that the solution offered by him meets the requirements specified by the Contracting Authority. In this case, the Contractor shall attach to the tender a list of equivalent solutions together with its description or standards. 8. Where reference is made in the description of the subject-matter of the contract to the standards, technical assessments, technical specifications and technical reference systems referred to in Article 101(1)(b) CTMR; 1 point 2) and par. 3 and 5 of the Public Procurement Act, the Contracting Authority accepts solutions equivalent to those described. 9. Pursuant to Article 95 of the Public Procurement Act, the Contracting Authority requires the Contractor or the Subcontractor to employ, on the basis of an employment contract, natural persons not engaged in economic activity carrying out construction works falling within the scope of land development after the former Jordan Garden (i.e.: preparatory works, construction and assembly works, ). In the case of works carried out in accordance with Article 12 of the Construction Law Act, i.e. those that may be performed by a person performing independent technical functions in construction, the Contracting Authority does not require the employment of persons under the above-mentioned conditions. This requirement does not apply in particular to designers, construction managers, works managers, suppliers of construction materials, surveyors, persons performing equipment and transport services, insofar as these activities do not constitute an employment relationship under the provisions of the Labour Code (e.g. self-employment). In order to confirm the above, it is required that the Contractor or the Subcontractor, within 5 days from the date of handing over the construction site and by the end of each month of performance of the contract after handing over the construction site, submit to the Ordering Party: a written declaration by the Contractor or the Subcontractor on the employment of persons performing activities in the field of contract performance on the basis of an employment contract, together with a list of persons employed by the Contractor or the Subcontractor in the performance of the contract on the basis of an employment contract - in accordance with the model set out in Annex 1 to the contract. The Ordering Party reserves the right to check the conformity of the statements of the Contractor or Subcontractor (presented to the Ordering Party in accordance with the model set out in Annex 1 to the contract) with the persons actually performing activities during the order. Non-submission by the Contractor or Subcontracted
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (77 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to REMOST Spółka z ograniczoną odpowiedzialnością.n = 77
- The median procedure drew just one bid (15 procedures with a bid count); 60% ended with a single bidder. Sector: median 5 bids.n = 15
- 28% of this buyer's awards went to companies that had already won here before (156 awards since 2017, spread over 101 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 156 awards since 2017
- Not one of the 156 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 156
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Usługi Koparkowe Piotr Marona | 8 | 2022–2026 |
| POLOCZEK Firma Remontowo-Budowlana Sp. z o.o. | 6 | 2022–2026 |
| Przedsiębiorstwo Produkcyjno-Usługowo-Handlowe „KURPET” Rafał Kurpet | 5 | 2021–2025 |
| PD TRAKT Sp. z o.o. Sp.k. | 4 | 2023–2024 |
| VIANKO SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 4 | 2022–2026 |
How often this buyer tenders this kind of work
Contracting authority contact
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 19 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now