How to bid in this country: portals, deadlines, thresholds →
Execution of bituminous overlays in the Good Commune
Wykonanie nakładek bitumicznych na terenie Gminy Dobre — original title
Your path to submission
- Deadline: 3 November at 12:00 — 2 days left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the contract is: Execution of bituminous overlays in the municipality of Dobre The scope of works includes the renovation of municipal roads in the municipality of Osęczyzna, Rąbierz Kolonia, Rynia, Grabniak, Czarnocin, Głęboczyca, Głęboczyca, Modecin, Makówiec Mały, Radoszyna gmina Dobre.The contracting authority provides for renovations in the following order in individual localities: 1. Osęczyzna, 2. Rąbierz Kolonia, 3. Rynia, 4. Grabniak, 5. Czarnocin, 6. Głęboczyca, 7. Głęboczyca, 8. Modecin, 9. Makówiec Mały, 10. Radoszyna The contracting authority provides for the implementation of the contract in such a way that, as part of the basic contract, road repairs will be ordered at locations included in paragraphs 1-6. part or all). The same contractual provisions will apply to renovations carried out under the option right as apply to the basic contract. The contracting…
Show full description
… authority will inform the selected contractor that it will exercise (or waive) the option right within three weeks from the date of conclusion of the contract. The contracting authority provides that the value of renovations carried out under the option will not exceed 70% of the value of the basic contract. The contracting authority provides for the possibility of changing the order of renovations carried out under the basic contract. A detailed description of the subject matter of the contract is included in the bill of quantities, STWiOR – constituting Annex 1 to the tender specifications – Description of the subject matter of the contract – Design documentation. 1. The contractor is responsible for carrying out the works in accordance with the construction documentation, technical specifications for the execution and acceptance of construction works, instructions for investor and author's supervision, while observing the principles of technical knowledge, applicable standards and regulations. 2. The subject matter of the contract is defined by the following codes of the CPV Common Procurement Vocabulary: 45233220-7 - Road surface works
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (63 awards, most recently September 2026) — by that rhythm the next award was due around October 2026. The last award went to AD-BUD Adrian Cierpisz,.n = 63
- 34% of this buyer's awards went to companies that had already won here before (123 awards since 2021, spread over 81 companies). 66% went to new names.n = 123 awards since 2021
- Not one of the 123 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 123
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| PHU Topaz Sp. z o.o. | 8 | 2022–2025 |
| Usługi Transportowo- Handlowe Krzysztof Sekuła | 4 | 2022–2025 |
| Przedsiębiorstwo Robót Drogowych „INODROG” Sp. z o.o. | 4 | 2022–2025 |
| Stacja Paliw – Dęby Stefan Rybacki | 4 | 2022–2025 |
| Zakład Remontowo-Budowlany Sp.C. Jan i Cezary Błaszczyk, | 4 | 2022–2026 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 18 (median of 9,435 procedures). A normal window for this market.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 197,109 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now