How to bid in this country: portals, deadlines, thresholds →
Extension of municipal road No 102867B Kroszewo – Bułkowizna – Wólka Karwowska – Karczewo
Rozbudowa drogi gminnej nr 102867B Kroszewo – Bułkowizna – Wólka Karwowska - Karczewo — original title
Your path to submission
- Deadline: 2 November at 08:30 — 1 day left.
- You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
1. The subject of the contract is the execution of construction works under the task entitled: ‘Extension of the municipal road 102867B Kroszewo-Bułkowizna-Wólka Karwowska-Karczewo’. 2. The municipal road, which is the subject of the design documentation, belongs to the technical class ‘D’ - access road. The length of the road covered by the investment is approx. 1 308,00 m. 3. The planned section of the route runs mostly through agricultural areas and through areas of dispersed single-family housing. There are currently no road markings or other road safety features on the road. 4. The road in the development area currently has a gravel or ground surface with a variable width of 2.80 ÷ 5.00 m. There are large irregularities, collapses and bumps in the surface due to many years of use and the lack of adequate load-bearing capacity of the ground. 5. In the construction of the road there…
Show full description
… are non-normative vertical and horizontal arches. It is necessary to adjust the geometric parameters in order to improve the safety of traffic users, ensure better comfort and smoothness of driving, as well as to guarantee proper drainage. 6. The dewatering of the roadway is currently carried out by the method of surface run-off of rainwater and meltwater in accordance with the natural terrain. Waters flow down to the shoulders and slopes from where they then go to drainage ditches located in the immediate vicinity of the road, or are drained directly into the ground. 7. The uneven surfaces are conducive to the formation of local water reservoirs and puddles during the rainy season, which in turn translates into even faster destruction and degradation of the roadway. 8. On the section of road being developed, under the main road, there are 3 existing culverts from concrete pipes with diameters of ø400 mm. Reconstruction of the above-mentioned culverts is planned with adaptation to the new parameters and dimensions of the municipal road. 9. The extension of the municipal road will include, among others: • preparatory and demolition works; • felling and grubbing up trees and bushes from the area of the road lane, • carrying out earthworks; • reinforcement of weak ground and construction of road embankments; • protection of the ground sections of the technical equipment network of the area – telecommunications network, • reconstruction of existing road and drainage culverts under the main roadway, • construction of a paved road with bituminous surface with a width of the roadway in the range of 4.20÷5.20 m, • correction of geometric parameters of the existing route and use of regular lateral and longitudinal slopes, • implementation of normative intersections with other public roads, • construction of ordinary exits with bituminous or aggregate surface to the limits of the road lane, • implementation of surface drainage of the roadway with drainage of water to green areas and to roadside ditches with culverts at exits; • ongoing maintenance, cleaning and profiling of existing roadside ditches, without changing technical parameters; • making watercourses from prefabricated semi-circular and trapezoidal troughs; • making fortifications on road slopes, • making roadsides with a width of at least 1.20 m from a mixture of broken aggregates, • making vertical markings and assembly of BRD elements, finishing works; • clean-up of the construction site and adjacent areas. 10. Trees from felling are the property of the Ordering Party. 11. The customer requires a 60-month warranty period. 12. A detailed description of the subject-matter of the contract is set out in the project documentation annexed to the tender specification – Annex 7.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (47 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to Usługi Ogólnobudowlane Szymon Niedźwiecki.n = 47
- 49% of this buyer's awards went to companies that had already won here before (80 awards since 2018, spread over 38 companies). 51% went to new names.n = 80 awards since 2018
- Not one of the 80 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 80
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/10/2026.
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| STRABAG Sp. z o.o. | 12 | 2021–2026 |
| Przedsiębiorstwo Drogowo-Mostowe "UNIDROG" Sp. z o. o. | 5 | 2021–2025 |
| Usługi Transportowe Andrzej Korenkiewicz | 5 | 2021–2026 |
| Podlaska Komunikacja Samochodowa Nova Spółka Akcyjna | 5 | 2021–2025 |
| EKODROM Sp. z o.o. | 4 | 2023–2024 |
How often this buyer tenders this kind of work
Tactics
When contracts were awarded in this country and sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 5,149 completed awards — not a statement about this procedure.)
This procedure allows 21 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now