Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

Reconstruction of provincial road No 722 on the section from km 22+600 to km 29+400 in the municipality of Grójec – procedure No 202/26

Przebudowa drogi wojewódzkiej nr 722 na odcinku od km 22+600 do km 29+400 na terenie gminy Grójec – nr postępowania 202/26 — original title

PLPoland · WarszawaBELOW THRESHOLD — NOT ON TED

Your path to submission

  1. Deadline: 13 November at 08:00 — 12 days left.
  2. You submit on eZamówienia — not here and not by e-mail. ↗ Submission via eZamówienia: account required; above the EU threshold a qualified signature, nationally the 'trusted signature' often suffices — check the wording. Sort out account and signature first — not on submission day.
  3. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

1. The subject of the contract is the reconstruction of provincial road No. 722 on the section from km 22+600 to km 29+400 in the municipality of Grójec. 1) A detailed description of the subject of the Order can be found in the Tender Documentation (Part III of the Terms of Reference) and the Works Quantity - made available only illustratively (Part IV of the Terms of Reference). The contractor must calculate the value of the works on the basis of the attached project documentation. • The contractor must specify the value of the works for the entire task and specify the unit price for the disposal (including transport) of 1 tonne of asphalt destruct containing exceeding the permitted polycyclic aromatic hydrocarbon content. • The Contractor is obliged to ensure, at his own expense, safe road and pedestrian conditions in the area of the works covered by the contract on the basis of the…

Show full description

… traffic organisation project, ‘for the time of construction’ drawn up by and at the expense of the Contractor together with its approval, and is obliged to develop an update of the permanent traffic organisation project together with its approval. • For the entire duration of the construction works, the contractor is obliged to ensure the passability of the provincial road No. 722, except for the stage of construction works in the field of bituminous pavements. • The Contractor is obliged to transfer the copyright to the photographic and film documentation referred to in the general terms and conditions of the contract for the execution of construction works. 2) In the case of indicating in the description of the subject of the contract trademarks, patents or origin, source or specific process that characterizes the product or services provided by a specific contractor, the Ordering Party allows equivalent solutions. 3) In the case of reference in the description of the subject of the contract to standards, European technical assessments, approvals, technical specifications and technical reference systems, the Ordering Party allows solutions equivalently described. 2. The Contractor is obliged to have a third party liability insurance policy for damage caused during the performance of the contract and to third parties for the entire duration of the contract and for a guarantee amount not less than PLN 10,000,000.00. 1) The Contractor is obliged to provide a copy of the above policy within 7 days from the date of conclusion of the contract. Provided that the continuity of insurance is maintained, the Ordering Party allows for the possibility of presenting several policies confirming the possession of third party liability insurance during the term of the contract. 2) The Contractor is obliged to provide the Ordering Party with a copy of the next policy within 7 days from the expiry of the previous policy. If the Contractor fails to comply with the above, the Contracting Authority shall charge the Contractor contractual penalties in the amount specified in the contract. 3) If the policy is not submitted within 30 days from the date of conclusion of the contract, the Ordering Party shall have the right to withdraw from the contract.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuenot published — common for below-threshold procedures
Published9 Oct 2026

Type of service

45 · Construction work
CPV 45111200-0 · 45232130-2 · 45233000-9 · 45233290-8

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every month (951 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to PRZEDSIĘBIORSTWO ROBÓT INŻYNIERYJNO-DROGOWYCH W GRÓJCU Sp. z o. o.n = 951
  • 62% of this buyer's awards went to companies that had already won here before (1,622 awards since 2015, spread over 515 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 1,622 awards since 2015
  • The median procedure drew 6 bids (333 procedures with a bid count); 5% ended with a single bidder. Sector: median 5 bids.n = 333
  • 100% of the bids received came from small and medium-sized enterprises (59 procedures with a bid mix). Sector: 84%.n = 59
  • 2% of awards went to companies from abroad (1,622 awards with a known winner country). Sector average: 0%.n = 1,622

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 31/10/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.
Anything unclear? Bidder questions are your right — ask in writing, the answer goes to everyone.

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
STRABAG Sp. z o.o.732021–2026
Przedsiębiorstwo Robót Drogowo – Budowlanych S.A.562021–2026
Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o.552021–2025
COLAS Polska Sp. z o.o.382020–2026
BUDROMOST-STARACHOWICE” Sp. z o.o.342021–2026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

78
2021
130
2022
161
2023
224
2024
226
2025
158
2026
977 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Friday 13 November at 08:00

Tactics

When this buyer has awarded in this sector, usually 7 or more bids came in. Many compete here — price and references decide. (Based on 52 completed awards — not a statement about this procedure.)

This procedure allows 35 days between publication and deadline — typical in this country is 20 (median of 8,613 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.

Foreign bidders

In Poland · Construction work, 142 contracts went to foreign companies over the last 3 years (of 196,825 recorded awards) — mostly from Germany, Spain, France.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on eZamówienia. The full specification and all annexes are there.
Put together the evidence
Certificates, references and your price — as set out in the notice.
Submit via eZamówienia before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now